Emaar Properties · Dubai Creek Harbour
Altus at Dubai Creek Harbour Construction Updates
The Verified Inspection Record for Two Towers Beside Creek Beach
Altus reached 64.2 percent at its 25 June 2026 RERA inspection, structure complete on both Creek Beach towers and envelope and finishes works now carrying the climb.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Altus at Dubai Creek Harbour at a Glance
Altus is Emaar's 280-residence twin-tower development on plot 284 in Al Khairan First, a short walk from Creek Beach. Just under nineteen months separate its 03 December 2024 construction start from the 64.2% certified on 25 June 2026, and the figures below are the DLD-registered anchors behind that record. The two towers are deliberately unequal, twenty residential floors on Tower 1 against thirteen on Tower 2 over one shared G+2P+2 base, so a single site percentage here is covering two buildings that will never look the same height from the promenade.
3184
Active
03 December 2024
280 residential units
28,846.92 sq m
31 January 2029 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Altus at Dubai Creek Harbour Construction Update Timeline
This record currently holds one dated reading: 64.2%, certified at the RERA inspection of 25 June 2026. The DLD file also carries a previous inspection figure of 51.65% with no date beside it, so the 12.55 point gap between the two is a distance Altus has covered rather than a speed it travelled at. The track below plots both values, and the table links the full June 2026 report.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| June 2026 | 64.2% | 25 June 2026 | View the June 2026 update |
Pace Analysis
How Fast Altus at Dubai Creek Harbour Has Been Built
Pace is usually the most useful thing an inspection record gives a buyer. On Altus it is also the thing this record is least able to prove, and it is worth being exact about why:
- Previous inspection to 25 June 2026: 51.65% to 64.2%, structure closed out and envelope opened up+12.55 points, interval undated
- 25 June 2026 to handover readiness: 64.2% toward the 100% certification35.8 points still ahead
The DLD file for project 3184 publishes the 51.65% reading without an inspection date beside it, and that one missing field is the whole difference between a distance and a rate. Altus certifiably covered 12.55 points between the two readings, but nothing in the record says whether that took four months or fourteen, so turning it into a points-per-month figure would be arithmetic invented rather than observed. Nothing on this page converts the gain into a monthly pace, and nothing here forecasts the date on which the remaining 35.8 points will be certified. What the two readings do establish is position, and position is the part that matters at 64.2%. Enabling, foundation and structure works are recorded complete on both towers, and envelope, internal and finishes packages are running in parallel behind them. For an end user waiting on a January 2029 handover, that means the heaviest unknowns in the build are already behind the certified figure. For an investor, it means the remaining exposure on Altus sits in fit-out sequencing and certification rather than in structure, which is a different risk to price.
Get the Next Inspection Figure First
Tell me you are tracking Altus at Dubai Creek Harbour and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Altus at Dubai Creek Harbour
The build percentage only matters in the context of what is being delivered. The full project guide covers what buyers are tracking toward on this page:

Altus at Dubai Creek Harbour: Two Towers Near Creek Beach
Altus at Dubai Creek Harbour is a two tower Emaar development of 280 apartments sharing one amenities podium near Creek Beach.
View the Altus at Dubai Creek Harbour Project GuideConsidering an Entry After Structure Completion?
Availability at Altus shifts between inspection cycles, and units bought now carry a payment runway that still runs to the January 2029 completion. If the record on this page is what brought you here, ask me what is currently open before the picture changes again.
Ask About Remaining Availability on WhatsAppStage Record
Altus at Dubai Creek Harbour Build Stages, Mapped to the Inspections
Rather than a generic construction sequence, each stage below is tied to what the Altus record actually certifies. Only one inspection carries a date, so stages completed before it are described as the June 2026 report found them, not given windows the file does not support.
Site Activation on Plot 284
Construction started on 03 December 2024 on plot 284 in Al Khairan First. Enabling works across the plot are recorded complete in the June 2026 inspection file.
Foundations Under Both Towers
Foundation works beneath Tower 1 and Tower 2 are listed as finished. The register dates the reading, not the milestone, so no completion month is claimed for this stage.
Structure to Twenty and Thirteen Floors
Structure works are recorded complete across both towers: twenty residential floors with a roof level on Tower 1, thirteen on Tower 2, over the shared G+2P+2 base.
Envelope, Internal and Finishes Works
The phase the 64.2% figure sits inside: envelope, internal and finishes packages progressing at different stages across the two towers, with mobilization still logged as ongoing.
Certification and Handover
Further RERA inspection cycles toward 100%, then completion procedures against the 31 January 2029 registered date and the January 2029 handover quoted for Altus.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Altus at Dubai Creek Harbour's own record.
Buyer Position
Tracking Your Position at Altus at Dubai Creek Harbour
This page is one of four project resources that together cover a Altus at Dubai Creek Harbour purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Altus at Dubai Creek Harbour Construction Updates
This page: every certified Altus reading in one record, from the 03 December 2024 start onward.

Altus at Dubai Creek Harbour Golden Visa: Two of the Three Layouts
Altus at Dubai Creek Harbour, 280 Emaar apartments on plot 284, qualifies at 2 and 3 bedrooms; 1 bedroom does not.
Read the Altus at Dubai Creek Harbour Golden Visa Guide
Altus at Dubai Creek Harbour: The Mashreq Escrow Behind the Tower
Mashreq holds Altus at Dubai Creek Harbour escrow, DLD project 3184, for 283 units certified 64.2% in June 2026.
Verify the Altus at Dubai Creek Harbour Escrow Account
Altus at Dubai Creek Harbour Snagging for Two Towers Beside Creek Beach
Altus at Dubai Creek Harbour has two towers of twenty and thirteen floors, holding 280 apartments of 1 to 3 bedrooms.
Book Altus at Dubai Creek Harbour SnaggingApproaching Handover
Between 64.2% and Handover: What Altus at Dubai Creek Harbour Buyers Should Do Now
Altus is past its structure phase and a long way from its January 2029 completion, which makes this the stretch where a buyer's attention shifts from the building to the paperwork the building triggers. Off plan instalments here are written against construction completion percentages, and the certified 64.2% of 25 June 2026 already sits above the 60% marker that the published Altus plan dates to August 2027, so a milestone trigger can arrive well before the calendar in the brochure suggests.
First, confirm which trigger your own contract uses and where the money lands, against the Altus escrow account record for project 3184.
Second, if your unit clears the residency investment threshold, settle the documentation path early through the Altus Golden Visa guide rather than in the month of handover.
Third, follow the record cycle by cycle: the certified June 2026 reading for Altus is the baseline every later figure is measured against.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore Dubai Creek Harbour Structure
A build record is only half the picture; the other half is what is rising around it. These three pages put the Altus progress figure in its community, market, and developer context:

Dubai Creek Harbour Properties for Sale
Browse waterfront apartments, branded residences and penthouses for sale in Dubai Creek Harbour.
See Dubai Creek Harbour Properties for Sale
Dubai Creek Harbour: Emaar's Waterfront City With a Marina and Urban Beach
Dubai Creek Harbour is Emaar's waterfront city between Downtown Dubai and the Creek, planned for 48,500 homes with skyline views.
Explore the Dubai Creek Harbour Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Altus at Dubai Creek Harbour Construction Updates Frequently Asked Questions
Altus at Dubai Creek Harbour is an active DLD-registered project, number 3184, certified at 64.2% construction progress by the RERA inspection of 25 June 2026. Its inspection file carries Main Contract - Progressing in the progress status field. The full record sits in the inspection timeline above.
The inspection of 25 June 2026 certified 64.2%, which is 12.55 percentage points above the previous recorded figure of 51.65%. Enabling, foundation and structure works are listed as complete, while internal, envelope and finishes works are listed as in progress at varying stages. The full site report is in the Altus June 2026 construction update
The DLD register publishes 25 June 2026 as the inspection date for the 64.2% figure, but carries the earlier 51.65% reading with no date attached to it. Only a dated reading can be placed on a timeline, so this page plots one dated entry and treats the undated 51.65% as a reference point rather than a second milestone.
The DLD-registered completion date for project 3184 is 31 January 2029, which agrees with the January 2029 handover quoted for Altus. With 64.2% certified on 25 June 2026, 35.8 percentage points remain, and this page is updated each time a further inspection figure is recorded.
Altus comprises 280 residential units in one, two and three bedroom apartment layouts, divided between two towers of unequal height: twenty residential floors on Tower 1 and thirteen on Tower 2, over one shared G+2P+2 base. The layouts themselves are set out in the Altus at Dubai Creek Harbour project guide.
Construction started on 03 December 2024, following project registration with the Dubai Land Department on 09 August 2024. Just under nineteen months later the 25 June 2026 inspection certified 64.2%, by which point enabling, foundation and structure works were already recorded as complete.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Altus at Dubai Creek Harbour construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.