January 2026 Inspection Records Artistry One Residences at a 0% Baseline in Dubai Design District (d3)
Before any construction activity began, RERA inspected the Artistry One Residences site in d3 on 14 January 2026, and the DLD register logged a 0% reading.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Artistry One Residences Construction Snapshot
A 0% first reading, dated 14 January 2026, places Artistry One Residences at the very start of the enabling and foundations band, where escrow verification and Oqood registration matter more to a buyer than any progress figure.
Artistry One Residences by Select Group
4259
Active
0%
14 January 2026
09 February 2026
227 Residential Units
31,193.81 sq m
09 February 2029
Data source: the DLD project register reading of 0% dated 14 January 2026 and the RERA Independent Progress Monitoring Report of the same date, which records the progress status as N/A. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Images on this page are developer renderings of the finished project, not site photographs. Last updated: January 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Artistry One Residences Construction Progress Summary
The 14 January 2026 inspection is the opening entry in the Artistry One Residences record: RERA found no construction activity started on the d3 plot, one day before the project was registered with the Dubai Land Department on 15 January 2026. With the registered construction start set for 09 February 2026, this reading fixes the 0% baseline that every later inspection will be measured from.
- Baseline RERA inspection of the site on 14 January 2026
- DLD project registration as project 4259 on 15 January 2026
- Escrow trust account bank named: Emirates NBD Bank (P.J.S.C)
- No construction activity started at the time of inspection
- RERA progress status recorded as N/A in the inspection report
- Registered construction start of 09 February 2026, after this reading
- Enabling and foundation works for the single tower
- Superstructure rising to 36 storeys, including the 21st floor amenity level
- Handover expected in Q1 2029, registered completion 09 February 2029
Payment Linked Progress
What 0% Progress Means for Artistry One Residences Buyers
Many Dubai off plan payment plans tie installments to construction milestones; the Artistry One Residences 50/50 plan does not. Its 20% booking payment and three 10% instalments are dated from your reservation, so a 0% reading pauses nothing you owe: it shows how far your payments run ahead of the build. At this baseline, four actions matter most.
Verify the escrow account
The 20% booking payment falls due within 14 days of reservation, before any structural work exists on the d3 plot, so it should go only to the DLD regulated escrow account registered for project 4259. Artistry One Residences escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA milestone schedule
Check how your sale and purchase agreement dates the 10% instalments at 6, 12 and 18 months from reservation, and how it defines the handover notice for the 50% balance due in Q1 2029. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Confirm your Oqood registration
Oqood is the Dubai Land Department's interim register for off plan units. Once your booking and the 4% DLD registration fee are processed, check that your unit appears under project 4259, which was registered on 15 January 2026, one day after this baseline reading.
Track the remaining cycles
From a 0% start, every reading between now and the Q1 2029 handover adds new information. Artistry One Residences construction updates hub logs each one as it is published, beginning with this January 2026 baseline.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 0%?
Entering a project at its baseline reading trades a long wait for a long funding runway: nothing is built yet, half the price is deferred to handover, and the build timeline is the main risk to weigh. Every payment goes to the DLD-registered escrow account for project 4259, released against construction progress recorded in RERA inspections.
- No construction activity recorded at the 14 January 2026 inspection
- Handover expected in Q1 2029, about three years from this reading
- 50% of the 50/50 plan due upon handover, not up front
- Structure already standing and visible in inspection photographs
- A shorter wait, often under a year to handover
- Less instalment runway, with larger sums due sooner
Limited Units Available on the project page as of this update; availability shifts between cycles.
About the Development
Artistry One Residences Project Details

Registered on 15 January 2026 and read at 0% the day before, Artistry One Residences is a pre-construction stage development of 227 residential units in a single 36-storey tower on the d3 waterfront. Starting prices: AED 2.21M ≈ USD 602K.
For buyers entering at this stage, the trade off is the longest wait in the build cycle against the most time to fund the 50% handover balance, with handover expected in Q1 2029.
Artistry One Residences Project GuideSite Context This Cycle
Explore Artistry One Residences Location on Dubai Map
Artistry One Residences is planned on a waterfront plot in Dubai Design District (d3), its single 36-storey tower set to face the canal and the Burj Khalifa skyline. The January 2026 inspection photographs show open, level ground at the water's edge with the district road grid already laid, so this record captures the plot before any enabling works, with no structure yet on site.
The roads around the site already connect to Al Ain Road, Ras Al Khor Road and Al Khail Road, with Burj Khalifa and Dubai Mall about 8 minutes away by car, while the wider d3 plan is still forming: the developer describes zones such as The Lab, Nest, Creekside, Soho and Design HQ in future tense. Buyers entering at this baseline are buying into an unbuilt tower in a district that will keep maturing toward the Q1 2029 handover. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Artistry One Residences at the Pre-Construction Baseline
At a 0% reading, the decisions that matter are residency eligibility and where your booking money is held. Each resource below is matched to where Artistry One Residences stood in January 2026.

Artistry One Residences Construction Updates
This page: the 14 January 2026 baseline record for Artistry One Residences, before any site works.

Artistry One Residences Golden Visa, Starting With the One Bedroom
Select Group's Artistry One Residences, a 36-storey d3 tower of 227 units, qualifies at every tier through the duplex penthouses.
Read Artistry One Residences Golden Visa Guide
Artistry One Residences Escrow: Select Group in Dubai Design District
Select Group's Artistry One Residences is DLD project 4259, 232 units escrowed at Emirates NBD, certified 0% in January 2026.
Verify Artistry One Residences Escrow AccountUpdate Timeline
Other Artistry One Residences Construction Updates
This January 2026 page opens the inspection history for Artistry One Residences; each later reading joins the timeline as it is published.
Where This Update Fits
Explore Artistry One Residences Structure
This monthly report is one node in the wider record: the d3 district around the plot, the developer behind the tower, and the listings an early entry competes with.

Dubai Design District: d3 Apartments and Penthouses by Meraas and Select Group
Dubai Design District has 3 projects of apartments and penthouses for sale along Dubai Creek, minutes from Downtown Dubai and DIFC.
See Dubai Design District Properties for Sale
Dubai Design District Community Overview
Read the Dubai Design District (d3) guide: Meraas' design-led waterfront district with freehold residences and creative spaces.
Explore the Dubai Design District Community
Select Group: Premium Waterfront Residences From Marina Gate to Peninsula
Select Group delivers waterfront developments in Palm Jumeirah, Business Bay and Dubai Marina: founded in 2002, with over 7,000 units delivered.
View the Select Group Developer ProfileFAQs
Artistry One Residences Construction Progress in January 2026: Frequently Asked Questions
As of 14 January 2026, the Dubai Land Department project register shows Artistry One Residences, project 4259, at 0%. It is the project's first reading, so there is no earlier figure to compare it with and no measured pace yet.
No. As of the January 2026 record, handover remains Q1 2029, and the DLD register lists a registered completion date of 09 February 2029, which falls inside that quarter. Registered dates can be revised between inspection cycles, so any change would show in a later reading; how readings and completion dates relate across the whole build is covered on the Artistry One Residences construction updates hub.
The Independent Progress Monitoring Report dated 14 January 2026 describes the project as "227 residential units + 5 retail units" and notes: "At time of inspection, no constructions activities have been started." Its photographs show open, level ground beside the water with the surrounding road network already in place.
The January 2026 report prints no percentage: its RERA progress status reads N/A, consistent with no works having started on the plot. The 0% figure on this page comes from the DLD project register reading of the same date, so it marks a starting line rather than a measurement of completed work.
The inspection took place on 14 January 2026, the project was registered with the Dubai Land Department on 15 January 2026, and the registered construction start is 09 February 2026. The January reading therefore records the site one day before registration and 26 days before the registered start.
No. The three 10% instalments fall due 6, 12 and 18 months from reservation rather than at construction milestones, so they run on the calendar whatever a reading shows, while the 50% balance is due upon handover. The exact dates are set by each buyer's SPA, which should be read directly.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the January 2026 inspection record for Artistry One Residences correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.