Creek Bay at Dubai Creek Harbour stood at 0.62% at its 16 June 2026 RERA inspection, the baseline every later reading of both towers is measured against.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

0.62%Construction Progress
16 June 2026Latest RERA Inspection
568 residential apartmentsTotal Units
Project 4198DLD Registration

Construction Snapshot

Creek Bay at Dubai Creek Harbour at a Glance

Creek Bay at Dubai Creek Harbour is Emaar's 568-apartment waterfront project, registered with the Dubai Land Department as project 4198 on 13 November 2025. Only 77 days separate its 31 March 2026 construction start from the 0.62% certified on 16 June 2026, so this record opens at its very first reading rather than partway through a build. Because Tower A and Tower B stand over one shared basement and podium under a single project number, every percentage on this page describes both towers together.

DLD Project Number

4198

Project Status

Active

Construction Start

31 March 2026

Total Units

568 residential apartments

Total Built-Up Area

83,467.60 sq m

Registered Completion Date

30 April 2030 (DLD)

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

Creek Bay at Dubai Creek Harbour Construction Update Timeline

One dated inspection makes up the Creek Bay record so far: 0.62% on 16 June 2026, logged against a previous inspection of 0% that the DLD register shows without a date. The track below runs from the March 2026 groundbreaking to handover, and the single dot sits just off its starting edge; each later RERA reading will add a dot to the track and a row to the table, linked to its own monthly update.

Inspection MonthConstruction ProgressInspection DateFull Update
June 20260.62%16 June 2026View the June 2026 update

Pace Analysis

How Fast Creek Bay at Dubai Creek Harbour Has Been Built

A single dated reading cannot show a velocity yet, so the Creek Bay record is read here in two parts: what has been certified, and what the distance left to the DLD registered completion works out to:

  • Previous inspection (undated) to 16 Jun 2026: enabling works, 0% to 0.62%0.62 points recorded
  • 16 Jun 2026 to 30 Apr 2030: remaining distance, 0.62% to 100%About 2.1 points per month required

Neither figure is a trend. The 0.62 points are the entire certified progress to date, recorded 77 days after the 31 March 2026 start while the site was still in enabling works, a phase that barely moves the percentage because the shared basement, the three podium levels and 82 tower floors across Tower A and Tower B all still lie ahead. The 2.1 figure is plain arithmetic: 99.38 points spread over roughly 46.5 months to 30 April 2030, a calculation rather than a measured pace. What gives the coming readings their weight is the launch payment plan, whose first construction-linked installment waits for 40% completion, marked by the developer as an estimated Feb 2028 date. For end users and investors alike, each inspection between June 2026 and that trigger shows how much certified construction stands behind the fixed-date installments already running.

Get the Next Inspection Figure First

Tell me you are tracking Creek Bay at Dubai Creek Harbour and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About Creek Bay at Dubai Creek Harbour

A 0.62% reading only means something next to the finished product it is building toward. The full project guide covers what this record is tracking:

Creek Bay at Dubai Creek Harbour by Emaar Properties luxury residential towers overlooking the waterfront marina in Dubai Presented by Tohid Fetrat

Creek Bay at Dubai Creek Harbour: Two Towers Looking Across the Creek

Creek Bay at Dubai Creek Harbour is a two tower Emaar development of 568 waterfront apartments with one to three bedrooms.

View the Creek Bay at Dubai Creek Harbour Project Guide

Considering an Early-Construction Entry?

Buying while Creek Bay is still in enabling works puts the whole build, and most of the payment plan, ahead of you. Availability shifts as each release is taken up, so if the record on this page is what brought you here, ask me what is open today before the choice narrows.

Ask About Remaining Availability on WhatsApp

Stage Record

Creek Bay at Dubai Creek Harbour Build Stages, Mapped to the Inspections

Only the first two stages below carry dates in the Creek Bay record so far. The other three follow the tower configuration listed in the 16 June 2026 inspection report and the construction-linked dates on Emaar's launch payment plan, and each will be pinned to a real inspection window as readings arrive.

Nov 2025 to Mar 2026

Registration to Groundbreaking

DLD registration as project 4198 on 13 November 2025, a trust account with Emirates NBD Bank (P.J.S.C), and the recorded construction start on 31 March 2026 on plot 341, Al Khairan First.

Current PhaseMar 2026 onward, 0.62% at last reading

Enabling Works

The 16 June 2026 inspection, 77 days after the start, found enabling works progressing and certified 0.62%, the first movement above the 0% previous inspection.

Not yet recorded

Shared Basement and Podium

The next physical stage: one basement, the ground floor and three podium levels shared by both towers. Its first reading will mark the move beyond enabling works.

Not yet recorded

Tower A and Tower B Structures

Tower A rises to 44 floors and Tower B to 38, each topped by two mechanical levels and a roof. Its dates will come from the inspections that record it.

Toward Q2 2030 handover

Facade, Fit-Out, and Delivery

Envelope, services and interiors across all 568 apartments, then completion. The final 20% installment is tied to 100% completion, estimated for Apr 2030; the DLD registered date is 30 April 2030.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Creek Bay at Dubai Creek Harbour's own record.

Buyer Position

Tracking Your Position at Creek Bay at Dubai Creek Harbour

This page is one of four project resources that together cover a Creek Bay at Dubai Creek Harbour purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Creek Bay at Dubai Creek Harbour by Emaar Properties in Dubai Creek Harbour construction updates cover image featuring a project rendering of waterfront apartment balconies overlooking the Dubai skyline in Dubai - Presented by Tohid Fetrat
You Are Here

Creek Bay at Dubai Creek Harbour Construction Updates

This page: the verified Creek Bay inspection record, from 0.62% on 16 June 2026 to handover.

Creek Bay at Dubai Creek Harbour by Emaar Properties in Dubai Creek Harbour Golden Visa card graphic above a palm-lined waterfront promenade and residential buildings in Dubai - Presented by Tohid Fetrat

Creek Bay at Dubai Creek Harbour Golden Visa: 568 Waterfront Apartments

Creek Bay at Dubai Creek Harbour, Emaar's 568-apartment development, qualifies at 2 and 3 bedrooms but not the 1 bedroom.

Read the Creek Bay at Dubai Creek Harbour Golden Visa Guide
Creek Bay at Dubai Creek Harbour by Emaar Properties in Dubai Creek Harbour escrow protection graphic with shield and padlock above an infinity pool overlooking the Dubai skyline in Dubai - Presented by Tohid Fetrat

Creek Bay at Dubai Creek Harbour: A 766-Unit Escrow at Emirates NBD

Creek Bay at Dubai Creek Harbour holds 766 units' payments at Emirates NBD as DLD project 4198, 0.62% certified June 2026.

Verify the Creek Bay at Dubai Creek Harbour Escrow Account

Approaching Handover

Between 0.62% and Handover: What Creek Bay at Dubai Creek Harbour Buyers Should Do Now

Enabling works and the shared basement stand between the June 2026 reading and the first tower floors, yet the launch payment plan keeps to its own calendar: the 10% down payment and four fixed-date 10% installments, half the price, fall due by Sep 2027, before the first construction-linked trigger at 40% completion that the developer estimates for Feb 2028. Those fixed dates arrive whether or not the percentage moves, so the three checks below belong before your next installment, not after it.

First, confirm that every transfer goes to the DLD-registered trust account for project 4198; the Creek Bay escrow account page shows how to match it against the official record.

Second, mark in your SPA which installments are dated and which wait for 40%, 60%, 80% and 100% construction completion, then hold each construction-linked one against the latest certified figure in the inspection timeline.

Third, follow each new reading as it posts: the Creek Bay June 2026 construction report holds the full first inspection, and later cycles will join the table on this page.

Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore Dubai Creek Harbour Structure

Creek Bay's 0.62% is one reading inside a master community where other Emaar towers already stand finished. These three pages place the record in its market, community, and developer context:

Dubai Creek Harbour Properties for Sale waterfront community view with Creek waters modern residential towers and Downtown Dubai skyline Presented by Tohid Fetrat

Dubai Creek Harbour Properties for Sale

Browse waterfront apartments, branded residences and penthouses for sale in Dubai Creek Harbour.

See Dubai Creek Harbour Properties for Sale
Dubai Creek Harbour skyline with The Grand by Emaar and Dubai Creek Tower – luxury waterfront community with marina and skyline views, presented by Tohid Fetrat.

Dubai Creek Harbour: Emaar's Waterfront City With a Marina and Urban Beach

Dubai Creek Harbour is Emaar's waterfront city between Downtown Dubai and the Creek, planned for 48,500 homes with skyline views.

Explore the Dubai Creek Harbour Community
Emaar Properties developer showcasing Downtown Dubai skyline with Burj Khalifa and surrounding residential and commercial towers at dusk Presented by Tohid Fetrat

Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities

Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.

View the Emaar Properties Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

Creek Bay at Dubai Creek Harbour Construction Updates Frequently Asked Questions

Creek Bay at Dubai Creek Harbour is an active DLD-registered project (number 4198) in its enabling works phase, recorded at 0.62% at the RERA inspection of 16 June 2026. That single dated reading is the whole certified record so far, laid out in the Creek Bay inspection timeline above.

The 16 June 2026 inspection recorded 0.62% construction progress at Creek Bay at Dubai Creek Harbour, up 0.62 points from a previous inspection of 0% that carries no date in the DLD record. The progress status was logged as enabling works, progressing, and the full report is covered in the Creek Bay construction update for June 2026.

Creek Bay at Dubai Creek Harbour is scheduled for handover in Q2 2030, and the DLD register lists its completion date as 30 April 2030, a date that has not lapsed. As of 16 June 2026 the project stood at 0.62%, so roughly 46 months of construction separate that reading from the registered date, and this page's record is updated as each inspection is recorded.

Creek Bay at Dubai Creek Harbour includes 568 apartments in one to three bedroom layouts. Emaar's fact sheets place 214 of them in Tower A and 354 in Tower B, so Tower B, the shorter building at 38 floors against Tower A's 44, holds about 62% of the residences.

Construction at Creek Bay at Dubai Creek Harbour started on 31 March 2026, about four and a half months after the project's DLD registration on 13 November 2025. The first tracked reading followed 77 days after the start, when the 16 June 2026 inspection certified 0.62%.

That cannot be judged yet: Creek Bay at Dubai Creek Harbour has one certified figure, 0.62% on 16 June 2026, and a pace needs at least two dated inspections. By arithmetic, reaching 100% by the DLD registered completion of 30 April 2030 would take an average of about 2.1 points per month over roughly 46.5 months, a benchmark for later readings rather than a measured rate; the pace analysis above sets it out.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the Creek Bay at Dubai Creek Harbour construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

WhatsApp +971543443597
Get the Latest Status