Creek Haven recorded 0.87% construction at its 16 June 2026 RERA inspection, the first certified reading establishing where this Dubai Creek Harbour tower begins its four-year build.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

0.87%Construction Progress
16 June 2026Latest RERA Inspection
593 residential unitsTotal Units
Project 4225DLD Registration

Construction Snapshot

Creek Haven at Dubai Creek Harbour at a Glance

Creek Haven is Emaar's 593-residence waterfront development on plot 342 at Al Khairan First, inside Dubai Creek Harbour. Construction was recorded as started on 21 March 2026, and the RERA inspection three months later, on 16 June 2026, returned the project's first audited figure at 0.87%. That makes this page unusual among the construction records published here: it is a record that begins rather than one that summarises, and the DLD-registered figures below are the anchors every future reading will be measured against.

DLD Project Number

4225

Project Status

Active

Construction Start

21 March 2026

Total Units

593 residential units

Total Built-Up Area

60,568.39 sq m

Registered Completion Date

31 March 2030 (DLD)

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

Creek Haven at Dubai Creek Harbour Construction Update Timeline

This record holds one certified reading. The inspection of 16 June 2026 put Creek Haven at 0.87%, and the previous inspection line on the same report reads 0%, so the whole spread of the record is the 0.87 points added since the 21 March 2026 construction start. Nothing earlier exists to set it beside, so no trend can be read from it yet: the track below carries a single dot, and the table gains a row each time a further inspection is certified.

Inspection MonthConstruction ProgressInspection DateFull Update
June 20260.87%16 June 2026View the June 2026 update

Pace Analysis

How Fast Creek Haven at Dubai Creek Harbour Has Been Built

Pace on this page is normally read between consecutive inspections. Creek Haven has been inspected once, so the only span that can honestly be measured is from the recorded construction start to that first certified reading:

  • 21 Mar 2026 start to 16 Jun 2026 inspection: enabling works, 0% to 0.87%About 0.3 points per month

That number is arithmetic, not a forecast, and reading it as one would be the mistake. Enabling works are the slowest points in any build to accumulate: excavation, shoring, piling and site setup absorb months while the audited completion figure barely moves, which is precisely what the 16 June 2026 inspection captured with mobilisation and enabling both still under way. The curve that will actually describe Creek Haven has not started. It begins when the basement, the three podium levels and Tower A's 30 floors start rising, and Emaar's own payment schedule sets the checkpoints it should pass: 40% construction completion in February 2028, 60% in July 2028, 80% in January 2029. For an investor, the useful reading today is not velocity at all but the distance between those scheduled milestones and what each inspection actually certifies. For an end user tracking a 31 March 2030 registered completion, the second certified figure will say more about delivery than the first one possibly could.

Get the Next Inspection Figure First

Tell me you are tracking Creek Haven at Dubai Creek Harbour and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About Creek Haven at Dubai Creek Harbour

A certified percentage is only worth reading against what it is progress toward. The project guide covers what the 0.87% on this page is building:

Creek Haven by Emaar in Dubai Creek Harbour twin residential towers set against the Dubai skyline at dusk in Dubai - Presented by Tohid Fetrat

Creek Haven at Dubai Creek Harbour, a 30-Floor Waterfront Tower

Creek Haven at Dubai Creek Harbour is a 30 floor Emaar tower of waterfront apartments set over three podium levels.

View the Creek Haven at Dubai Creek Harbour Project Guide

Considering an Early-Stage Entry?

Creek Haven is at the point in its record where the calendar instalments still run ahead of the construction milestones, and availability at this stage shifts between release cycles. If this record is why you are reading, tell me the layout you want and I will confirm what is open before the next cycle moves it.

Ask About Remaining Availability on WhatsApp

Stage Record

Creek Haven at Dubai Creek Harbour Build Stages, Mapped to the Inspections

Only the first two stages below sit inside Creek Haven's inspection record so far. The three ahead are mapped to the construction-completion milestones Emaar's own payment schedule attaches to this tower, so you can see which certified reading will confirm each one.

Nov 2025 to Mar 2026

Registration and Site Handover

Project 4225 was entered on the DLD register on 20 November 2025, and construction on plot 342 at Al Khairan First was recorded as started four months later, on 21 March 2026.

Current PhaseMar 2026 to Jun 2026, 0.87% certified

Mobilisation and Enabling Works

The 16 June 2026 inspection returned a Progress Status of "Enabling Works - Progressing" at 0.87%, with mobilisation and enabling recorded as ongoing and piling equipment visible in the filed inspection photographs.

Ahead, toward the 40% milestone of Feb 2028

Basement, Podium and Tower Structure

A basement, a ground floor carrying the attached nursery, three podium levels and the 30 floors of Tower A. Emaar's payment schedule places 40% construction completion at February 2028.

Ahead, 60% Jul 2028 to 80% Jan 2029

Facade, Fit-Out and Amenity Deck

The 60% and 80% construction milestones fall in July 2028 and January 2029 on the same schedule, the window in which the tower is enclosed and the podium amenity levels are built out.

Ahead, 100% by Mar 2030

Finishing, Commissioning and Handover

The closing 20% instalment is tied to 100% construction completion in March 2030, alongside the DLD-registered completion date of 31 March 2030 and the Q1 2030 handover quarter published for the project.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Creek Haven at Dubai Creek Harbour's own record.

Buyer Position

Tracking Your Position at Creek Haven at Dubai Creek Harbour

This page is one of four project resources that together cover a Creek Haven at Dubai Creek Harbour purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Creek Haven by Emaar in Dubai Creek Harbour construction updates cover image featuring a project rendering of a waterfront balcony view and distant skyline in Dubai - Presented by Tohid Fetrat
You Are Here

Creek Haven at Dubai Creek Harbour Construction Updates

This page: every certified RERA reading for Creek Haven, starting at 0.87% in June 2026.

Creek Haven by Emaar in Dubai Creek Harbour Golden Visa graphic above a landscaped community lawn with palm trees and residential buildings in Dubai - Presented by Tohid Fetrat

Creek Haven at Dubai Creek Harbour Golden Visa Through a Waterfront Apartment

Emaar's 593-residence Creek Haven at Dubai Creek Harbour qualifies at 2 and 3 bedrooms; the 1 bedroom does not by itself.

Read the Creek Haven at Dubai Creek Harbour Golden Visa Guide
Creek Haven by Emaar in Dubai Creek Harbour escrow account protection graphic with shield and padlock icons above an outdoor pool and landscaped amenity deck in Dubai - Presented by Tohid Fetrat

Creek Haven at Dubai Creek Harbour: Emaar's Newest Creek Escrow

Creek Haven at Dubai Creek Harbour, DLD project 4225, escrows 594 units with Abu Dhabi Commercial Bank, 0.87% certified June 2026.

Verify the Creek Haven at Dubai Creek Harbour Escrow Account

Approaching Handover

Between 0.87% and Handover: What Creek Haven at Dubai Creek Harbour Buyers Should Do Now

Almost everything that decides a Creek Haven outcome over the next eighteen months happens away from the construction percentage rather than inside it. Between the 0.87% certified in June 2026 and the 40% milestone the payment schedule places in February 2028, the certified readings stay low while the instalments keep arriving on fixed dates. The next two instalments, in January 2027 and July 2027, are calendar-dated rather than construction-linked, so they fall due whether or not the following inspection shows movement. That is the window the three steps below belong in.

First, confirm that every payment lands in the project's registered escrow account and nowhere else; the Creek Haven escrow account page names the bank holding it and sets out how releases are tied to certified progress.

Second, keep the record itself in view rather than the sales calendar. The June 2026 Creek Haven inspection report is the baseline every later figure is judged against, and the timeline above gains a row with each new certification.

Third, if your purchase may support residency, settle eligibility now rather than near completion; the Creek Haven Golden Visa guide sets out which tiers qualify and how an application runs against an off-plan title.

Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore Dubai Creek Harbour Structure

One certified reading says little on its own. These three pages put Creek Haven's 0.87% into the context of the harbour around it, the district it sits in, and the developer building it:

Dubai Creek Harbour Properties for Sale waterfront community view with Creek waters modern residential towers and Downtown Dubai skyline Presented by Tohid Fetrat

Dubai Creek Harbour Properties for Sale

Browse waterfront apartments, branded residences and penthouses for sale in Dubai Creek Harbour.

See Dubai Creek Harbour Properties for Sale
Dubai Creek Harbour skyline with The Grand by Emaar and Dubai Creek Tower – luxury waterfront community with marina and skyline views, presented by Tohid Fetrat.

Dubai Creek Harbour: Emaar's Waterfront City With a Marina and Urban Beach

Dubai Creek Harbour is Emaar's waterfront city between Downtown Dubai and the Creek, planned for 48,500 homes with skyline views.

Explore the Dubai Creek Harbour Community
Emaar Properties developer showcasing Downtown Dubai skyline with Burj Khalifa and surrounding residential and commercial towers at dusk Presented by Tohid Fetrat

Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities

Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.

View the Emaar Properties Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

Creek Haven at Dubai Creek Harbour Construction Updates Frequently Asked Questions

Creek Haven is an active DLD-registered project (number 4225) in its enabling works phase, recorded at 0.87% at the RERA inspection of 16 June 2026. That is the only certified reading the project carries so far, and every reading is listed in the inspection timeline further up this page.

The inspection of 16 June 2026 recorded 0.87% construction progress, 0.87 points above the previous inspection line of 0% printed on the same report. The inspector logged mobilisation and enabling works as ongoing and filed inspection photographs showing piling equipment on the plot. The reading is set out in full in the Creek Haven June 2026 construction update.

The DLD-registered completion date for project 4225 is 31 March 2030 and the handover quarter published for Creek Haven is Q1 2030, so the registered date and the stated quarter agree. With 0.87% certified on 16 June 2026, Creek Haven is at the opening of a four-year build, and the record on this page is extended each time a further inspection is certified.

Creek Haven comprises 593 residential units. The RERA inspection report describes the development as a multi-storey residential building with a basement, a ground floor with an attached nursery, three podium levels, and Tower A rising 30 floors to a roof level.

Construction was recorded as started on 21 March 2026, four months after project 4225 was entered on the Dubai Land Department register on 20 November 2025. The first tracked inspection, dated 16 June 2026, returned 0.87%, and that figure is the baseline every later reading on this page is measured against.

As of the 16 June 2026 inspection, work on plot 342 was at mobilisation and enabling stage rather than structure: RERA classified the Progress Status as "Enabling Works - Progressing" and the photographs filed with the report show piling under way. Basement and podium construction sit ahead of the 40% construction milestone that Emaar's payment schedule places in February 2028.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the Creek Haven at Dubai Creek Harbour construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

WhatsApp +971543443597
Get the Latest Status