DAMAC Properties · Dubai Harbour
DAMAC Bay by Cavalli Construction Updates
Three Seafront Towers on One Podium, Logged Reading by Reading
DAMAC Bay by Cavalli read 33.76% on the DLD register at the 18 August 2026 inspection, its three Dubai Harbour towers rising from substantially completed foundations.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
DAMAC Bay by Cavalli at a Glance
DAMAC Bay by Cavalli is DAMAC's 1,069-residence development on the Dubai Harbour seafront, registered with the Dubai Land Department as project 2559. Construction started on 15 April 2023, and the only dated reading on its register so far, 33.76% on 18 August 2026, came 40 months into the build. All three towers stand on one shared basement and podium, so the deepest work in this record is common to every residence while each tower climbs on its own. The expected handover for buyers is Q3 2027, which falls after the registered completion date of 15 January 2027 shown below; both are kept on this page, each under its own label.
2559
Active
15 April 2023
1,069 residential units
136,056.28 sq m
15 January 2027 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
DAMAC Bay by Cavalli Construction Update Timeline
The DAMAC Bay by Cavalli register holds a single dated reading so far: 33.76% at the 18 August 2026 inspection, 1,221 days after the 15 April 2023 start. The same entry lists a previous inspection at 28.85% without a date, so that figure sits on the track below as an unlabelled dot, 4.91 points behind the latest one, and has no row in the table. The August 2026 row links the full monthly update with the RERA site notes.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| August 2026 | 33.76% | 18 August 2026 | View the August 2026 update |
Pace Analysis
How Fast DAMAC Bay by Cavalli Has Been Built
With one dated reading on the register, DAMAC Bay by Cavalli has no measured pace yet. What its record does support is arithmetic in 30-day months, shown below as arithmetic, not a forecast:
- Apr 2023 to 18 Aug 2026: whole-build average, 33.76 points over 1,221 days since the registered startAbout 0.83 points per month
- Previous inspection (undated) to 18 Aug 2026: 28.85% to 33.76%Up 4.91 points, no rate
- 18 Aug 2026 to end of Q3 2027: the remaining 66.24 points over 408 days to the expected handoverAbout 4.87 points per month
- 18 Aug 2026 to 15 Jan 2027: the remaining 66.24 points over 150 days to the registered completion dateAbout 13.25 points per month
The 0.83 average spreads 33.76 points across a stretch that included enabling works, foundations and the shared basement and podium beneath all three towers, recorded on 18 August 2026 as substantially completed or at an advanced stage; it describes the build so far as a whole, not the rate at which the towers are now rising. The two forward figures are nothing more than 66.24 points divided by the days left to each date, and neither says whether either date will hold. The 4.91-point movement from the undated 28.85% shows progress between two inspections, but without a start date it cannot be read as speed. The next dated reading will pair with the 18 August 2026 figure to give this project its first measured pace, and that number is what an investor timing an exit and an end user planning a move should compare with the 4.87 shown here.
Get the Next Inspection Figure First
Tell me you are tracking DAMAC Bay by Cavalli and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About DAMAC Bay by Cavalli at Dubai Harbour
Every reading on this page measures progress toward the 1,069 residences across three Dubai Harbour towers described in the full project guide:

DAMAC Bay by Cavalli: Three Towers Linked by a Sky Bridge
DAMAC Bay by Cavalli is a three-tower waterfront development in Dubai Harbour, 1,069 residences with nautical interiors styled by Cavalli.
View the DAMAC Bay by Cavalli Project GuideConsidering a Mid-Construction Entry?
Availability at DAMAC Bay by Cavalli keeps moving while the towers rise toward the Q3 2027 handover. If the record on this page is what brought you here, ask me what is open today before you compare tiers.
Ask About Remaining Availability on WhatsAppStage Record
DAMAC Bay by Cavalli Build Stages, Mapped to the Inspections
Each stage below is pinned to what the DAMAC Bay by Cavalli record actually shows, from the January 2023 registration to the 18 August 2026 RERA report, so the shared podium and the three towers above it can be followed step by step.
Registration and Site Activation
Project 2559 was registered with the DLD on 26 January 2023, and construction started on 15 April 2023 on the Dubai Harbour seafront plot.
Enabling Works and Foundations
Enabling and foundation works beneath all three towers, both recorded as substantially completed in the RERA report of 18 August 2026.
Shared Podium and Tower Superstructure
On 18 August 2026 the shared basement and podium substructure stood at an advanced stage, while superstructure, internal works and MEP across Towers A, B and C progressed at different stages; DLD register 33.76%, main contract progressing.
Envelope, Finishes and Amenity Levels
External envelope and internal finishes were recorded at an early stage on 18 August 2026; the wave-inspired facades DAMAC designed, the podium amenities and the rooftop pools come through this stage.
Sky Bridge, Commissioning and Handover
Upper-level works including the Cavalli sky bridge, systems commissioning and final inspections lead to the expected Q3 2027 handover; the registered completion date is 15 January 2027.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on DAMAC Bay by Cavalli's own record.
Buyer Position
Tracking Your Position at DAMAC Bay by Cavalli
This page is one of four project resources that together cover a DAMAC Bay by Cavalli purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

DAMAC Bay by Cavalli Construction Updates
This page: the dated DLD register record for DAMAC Bay by Cavalli, from groundbreaking to handover.

DAMAC Bay by Cavalli Golden Visa: Six Seafront Tiers
DAMAC Bay by Cavalli, 1,069 DAMAC residences on Dubai Harbour seafront, qualifies at all six tiers, apartments and super luxury duplexes.
Read the DAMAC Bay by Cavalli Golden Visa Guide
DAMAC Bay by Cavalli Escrow: The Dubai Harbour Account at Emirates NBD
DAMAC Bay by Cavalli at Dubai Harbour is DLD project 2559, 1087 units in Emirates NBD escrow, certified 33.76% August 2026.
Verify the DAMAC Bay by Cavalli Escrow AccountApproaching Handover
Between 33.76% and Handover: What DAMAC Bay by Cavalli Buyers Should Do Now
At the 18 August 2026 reading, 66.24 points of the DAMAC Bay by Cavalli build were still to be recorded, with foundations behind it and the envelope only beginning, so most buyers still have instalments ahead of them rather than a handover appointment. Payments made during superstructure works go out while the towers are still climbing, which makes the three checks below worth doing before the next transfer, not after it.
First, before any instalment leaves your account, match the receiving details against the escrow account registered for DAMAC Bay by Cavalli, so your money goes only to the account held for project 2559.
Second, if residency is part of your plan, settle the questions early through the residency options for DAMAC Bay by Cavalli owners, since the paperwork can differ while you hold an off-plan registration rather than an issued title deed.
Third, keep the record in view: the August 2026 construction update for DAMAC Bay by Cavalli carries the full 18 August 2026 reading and RERA site notes, and each later reading is added to this page as it is published.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore Dubai Harbour Structure
The three DAMAC Bay towers are rising into a seafront district that already has its marina, neighbours and developer history. These three pages place this build record in its market, community and developer context:

Dubai Harbour: DAMAC Bay by Cavalli Sea-View Apartments and Duplexes
Dubai Harbour, the Meraas waterfront with 1,000 yacht berths, lists sea-view apartments and duplexes in DAMAC Bay by Cavalli.
See Dubai Harbour Properties for Sale
Dubai Harbour Community Overview
Read the Dubai Harbour guide: Meraas' 20 million sq ft coastal destination with marina, cruise terminals and branded residences.
Explore the Dubai Harbour Community
DAMAC Properties: Lagoon Communities, Golf Villas and Branded Collaborations
Founded in 2002, DAMAC has delivered 48,000 homes and is known for large-scale master communities, luxury residential projects and branded collaborations.
View the DAMAC Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
DAMAC Bay by Cavalli Construction Updates Frequently Asked Questions
DAMAC Bay by Cavalli is an active DLD-registered project (number 2559) under construction, with the DLD register reading 33.76% at the inspection of 18 August 2026. The RERA report of that date lists the main contract as progressing, with the tower superstructure underway; the full record is in the inspection timeline above.
The DLD register holds one dated reading for DAMAC Bay by Cavalli: 33.76% on 18 August 2026, up 4.91 points from a previous inspection reading of 28.85%. The RERA site notes behind that figure are in the DAMAC Bay by Cavalli August 2026 update.
The Dubai REST entry for project 2559 shows 28.85% as the previous inspection beside the 33.76% reading of 18 August 2026, but it prints no date for that earlier figure. Without a date, the 4.91-point change cannot be spread over a period, so this page shows 28.85% as an undated dot on the track, gives it no table row and calculates no monthly pace from it.
The DLD register lists 15 January 2027 as the registered completion date for project 2559, while the expected handover for buyers is Q3 2027, which falls after that registered date. At the 18 August 2026 reading of 33.76%, both dates were still ahead, and this page keeps each one under its own label.
DAMAC Bay by Cavalli comprises 1,069 residential units across three towers: 1, 2 and 3-bedroom Luxury apartments and 3, 4 and 5-bedroom Super Luxury duplexes. At the 18 August 2026 reading of 33.76%, all 1,069 were still under construction.
The RERA report dated 18 August 2026 describes project 2559 as Tower A 47F+3MECH+R, Tower B 47F+3MECH+R and Tower C 48F+3MECH+R, standing on a shared basement and podium of 3B+G+3P+1F. Because the basement and podium are common to all three towers, the substructure recorded at an advanced stage on that date serves every residence.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the DAMAC Bay by Cavalli construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.