Meraas · Dubai Design District (d3)
Design Quarter at d3 Construction Updates
The Register Record of Three Towers Rising Over One Shared Podium in d3
Design Quarter at d3 stood at 30.98% in the DLD register reading of 30 June 2026, its climb carrying completed foundations into three rising d3 towers.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Design Quarter at d3 at a Glance
Design Quarter at d3 is the Meraas development of 558 residences in Dubai Design District (d3), entered in the Dubai Land Department register as project 2607 on 16 March 2023. Construction started on 25 May 2023, and 1,132 days later the register recorded 30.98% for the inspection of 30 June 2026. Because Meraas describes these as the first residences in Dubai Design District, this record also follows housing arriving in a district that was built around studios, showrooms and design events, with three residential towers sharing one basement and one podium.
2607
Active
25 May 2023
558 residential units
174,528.71 sq m
25 February 2027 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Design Quarter at d3 Construction Update Timeline
The Design Quarter at d3 record holds one dated reading so far: 30.98% on 30 June 2026, entered in the DLD register for the same inspection that produced the RERA report of that day. The register also lists 26.3% at the previous inspection without a date, so that figure sits on the track as an unlabelled point and has no table row; 4.68 points separate the two. Each dated reading added from here becomes a new row, linked to its monthly update.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| June 2026 | 30.98% | 30 June 2026 | View the June 2026 update |
Pace Analysis
How Fast Design Quarter at d3 Has Been Built
Design Quarter at d3 has one dated reading, so the figures below are arithmetic on the recorded dates in 30-day months, not a measured pace and not a forecast:
- 25 May 2023 to 30 Jun 2026: whole-build average, 0% to 30.98% over 1,132 daysAbout 0.82 points per month
- 30 Jun 2026 to the 25 Feb 2027 registered completion date: 69.02 points over 240 daysAbout 8.63 points per month needed
- 30 Jun 2026 to the end of Q2 2027 handover estimate: 69.02 points over 365 daysAbout 5.67 points per month needed
- Previous inspection (undated) to 30 Jun 2026: 26.3% to 30.98%4.68 points, no monthly rate
With a single dated point, the Design Quarter at d3 record has no curve yet, only a starting line. The 0.82 average spreads 30.98 points across every month since 25 May 2023, including the enabling works and foundation that the 30 June 2026 report lists as finished, so it describes the record to date rather than the rate on site that June. The two required-rate rows measure distance still to cover before the registered completion date and before the Q2 2027 estimate; they say nothing about which date the towers will meet. For an end user timing a move and an investor planning an exit alike, the number to watch is the next dated reading: set against 30 June 2026, it will give this page its first measured pace.
Get the Next Inspection Figure First
Tell me you are tracking Design Quarter at d3 and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Design Quarter at d3 at Dubai Design District
A register percentage means more next to what it is building toward. The project guide sets out the apartments, amenities and d3 setting behind this record:

Design Quarter at d3: Three Meraas Towers in the Design District
Design Quarter at d3 spreads 558 Meraas apartments of one to three bedrooms across Tower A, Tower B and Tower C.
View the Design Quarter at d3 Project GuideConsidering a Mid-Construction Entry?
Availability at Design Quarter at d3 is limited across the 1, 2 and 3-bedroom types, and it shifts with each release while the towers rise. Purchases follow the 40/60 payment plan: 10% on booking, 30% during construction and 60% upon handover. If the record on this page is what brought you here, ask me for the current list before you settle on a layout.
Ask About Remaining Availability on WhatsAppStage Record
Design Quarter at d3 Build Stages, Mapped to the Inspections
Each stage below is tied to the dates the Design Quarter at d3 record actually holds, from the March 2023 registration to the 30.98% reading of 30 June 2026, so the current position reads against evidence rather than a generic sequence.
Registration and Construction Start
Project 2607 entered the DLD register on 16 March 2023, and construction started ten weeks later on 25 May 2023.
Enabling Works and Foundation
The RERA report dated 30 June 2026 lists the enabling works and the foundation as finished; the record gives no separate completion date for either.
Structure, MEP and Internal Works
On 30 June 2026 the register read 30.98%, with structure, MEP, internal works and internal finishes each recorded at a different stage on the shared site.
Finishes, Podium and Building Systems
Closing out finishes across the 558 residences and the G+3P podium shared by Tower A, Tower B and Tower C; no reading on record dates this stage yet.
Completion and Handover
The registered completion date is 25 February 2027 and handover is estimated for Q2 2027, with 69.02 points between the 30 June 2026 reading and 100%.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Design Quarter at d3's own record.
Buyer Position
Tracking Your Position at Design Quarter at d3
This page is one of four project resources that together cover a Design Quarter at d3 purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Design Quarter at d3 Construction Updates
This page: the dated DLD register record for Design Quarter at d3, from groundbreaking to handover.

Design Quarter at d3 Golden Visa: Any Bedroom Count
Meraas's Design Quarter at d3, 558 residences in Dubai Design District, clears the threshold with all three apartment types.
Read the Design Quarter at d3 Golden Visa Guide
Design Quarter at d3 Escrow: Meraas in Dubai Design District
Meraas escrows Design Quarter at d3 with Emirates NBD as DLD project 2607, 564 units, certified 30.98% in June 2026.
Verify the Design Quarter at d3 Escrow AccountApproaching Handover
Between 30.98% and Handover: What Design Quarter at d3 Buyers Should Do Now
At 30.98% on 30 June 2026, Design Quarter at d3 had its foundation behind it and most of its structure, services and finishes ahead, so the decisions that matter now concern where your money goes and what your purchase can support, not handover logistics. Register readings post without advance notice, so the three checks below belong before the next reading appears, not after it.
First, before the 30% construction share leaves your account, check its destination against the Design Quarter at d3 escrow account page, which shows how the DLD-registered account for project 2607 is verified.
Second, if a UAE residence visa is part of the plan, work through the Design Quarter at d3 Golden Visa guide well ahead of the estimated Q2 2027 handover, since it explains how an off plan purchase here is assessed.
Third, read the June 2026 inspection update for Design Quarter at d3 beside your SPA: its notes show which works were finished on 30 June 2026 and which were still moving.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore Dubai Design District Structure
Design Quarter at d3 is rising inside a working district rather than on open land. These three pages place its record in its d3 market, community and developer context:

Dubai Design District: d3 Apartments and Penthouses by Meraas and Select Group
Dubai Design District has 3 projects of apartments and penthouses for sale along Dubai Creek, minutes from Downtown Dubai and DIFC.
See Dubai Design District Properties for Sale
Dubai Design District Community Overview
Read the Dubai Design District (d3) guide: Meraas' design-led waterfront district with freehold residences and creative spaces.
Explore the Dubai Design District Community
Meraas: Lifestyle Destinations From City Walk to Port de La Mer
Meraas is the name behind City Walk, Bluewaters Island and Madinat Jumeirah Living, from beachfront communities to luxury mixed-use districts.
View the Meraas Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Design Quarter at d3 Construction Updates Frequently Asked Questions
Design Quarter at d3 is an active Dubai Land Department project, number 2607, recorded at 30.98% construction progress in the DLD register for the inspection dated 30 June 2026. The RERA report of that date lists the progress status as Main Contract (Progressing), with the enabling works and the foundation complete. The dated record sits in the Design Quarter at d3 inspection timeline above.
Two readings appear in the DLD register for Design Quarter at d3: 30.98% for the inspection dated 30 June 2026, and 26.3% at the previous inspection, a difference of 4.68 points. The register gives no date for the 26.3% reading, so it is plotted as an undated point on the track rather than a timeline row, and no rate is drawn from the pair. The June reading is covered in full in the Design Quarter at d3 June 2026 construction update.
Every percentage on this page for Design Quarter at d3 is a Dubai Land Department register reading for project 2607, the latest being 30.98% dated 30 June 2026. The RERA Independent Progress Monitoring Report of the same date supplies the inspection notes and the progress status but prints no percentage of its own, so the two sources are read side by side. The method used for every tracked project is set out once on the Dubai Construction Updates methodology hub.
The DLD register holds a registered completion date of 25 February 2027 for Design Quarter at d3, while handover is estimated for Q2 2027, a few months later. When the register read 30.98% on 30 June 2026, that registered date was still 240 days away. Handover timing is confirmed by Meraas as completion procedures finish, and this record is updated as each new reading is published.
Averaged over the whole build, Design Quarter at d3 has moved about 0.82 points per 30-day month: 30.98 points across the 1,132 days from the 25 May 2023 start to the 30 June 2026 reading. The 69.02 points still to go would take about 8.63 points per month to reach 100% by the registered completion date of 25 February 2027, or about 5.67 by the end of Q2 2027. These figures are arithmetic on recorded dates, not a forecast; no measured pace exists yet because the earlier 26.3% reading carries no date. The working is laid out in the pace arithmetic above.
Construction at Design Quarter at d3 started on 25 May 2023, ten weeks after the project entered the DLD register on 16 March 2023. The first dated reading tracked on this page, 30.98% on 30 June 2026, arrived 1,132 days after that start.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Design Quarter at d3 construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.