
Emaar · Emaar South · Escrow Account
Golf Meadow at Emaar South Escrow Account
One Registered Account, Checked Before Every Transfer
The Dubai Land Department escrow details for Emaar's Golf Meadow apartments and townhouses at Emaar South, taken from the project record itself, so the account receiving your instalments is the one the law says must receive them.
Direct advisor access. Every message answered personally, never by a call center.
Official Account Details
Golf Meadow at Emaar South Escrow Account at a Glance
Money paid toward an apartment or townhouse at Golf Meadow does not reach Emaar's own treasury on the day you send it. It lands in one project trust account held at Mashreq and supervised by the Dubai Land Department, and the developer draws on it only as the building earns the draw. These are the details carried in the project record, and my advice to every buyer is the same: save the account number now, because it stays true long after a sales email or a phone call stops being trustworthy.
Masked for security. Tap Show to reveal the full number, or Copy to copy it directly. Last checked against Dubai REST after the 19 July 2026 inspection
Mashreq Bank PSC
3579
Active
Emaar Properties
07 March 2025
20 August 2025
188
7105
Where the Project Stands
Registration and Escrow Status
Golf Meadow entered the Dubai Land Department register on 07 March 2025 as project 3579, and the trust account at Mashreq had to exist before that registration could stand, which means no buyer deposit has ever reached the developer outside the supervised channel. Construction was recorded as started on 20 August 2025. For a family committing savings, that sequence is the difference between a promise and a mechanism; for an investor, it is proof that the project's cash has been ring-fenced since the first booking form was signed. At the inspection dated 19 July 2026 the DLD register carried 4.54 percent, up from 1.76 percent at the previous reading. The Independent Progress Monitoring Report for that date sets the progress status as enabling works progressing, and describes a site where mobilisation is ongoing and piling is at advanced stages, which matches a number that low: almost everything achieved so far sits below ground on a single G plus podium plus 12 floor plot. This is the stage where the escrow question is still the blunt one, will it be built and is my money safe while that happens, and the honest answer is that the account is the reason the second half of that question has a firm answer even while the first is still being earned. The building is scheduled for completion on 31 July 2029, inside the Q3 2029 handover window.
Looking for the month by month progress? Inspection results and milestone history live on the construction updates page.
Do It Yourself in 2 Minutes
Verify Golf Meadow at Emaar South's Escrow Account Independently
Do not take this page's word for it, and do not take anyone else's either. The whole point of the escrow system is that you can verify it yourself:
Open Dubai REST
In the Dubai REST app, go to Services, then Project Status.
Find the Project
Search project number 3579 or “Golf Meadow”.
Match the Details
Open the Escrow Account panel and match the bank and account number against this page and your SPA before every transfer.
Before You Transfer
Match the account number on your payment instruction to the Escrow Account panel in Dubai REST, match the same number to the escrow details in your Sales and Purchase Agreement, and confirm the amount and the instalment or construction completion mark it corresponds to. If anything differs, even by one digit, stop and message me before sending.
I verify these details against Dubai REST before publishing and after each new inspection. If anything on this page ever differs from what you see in the app, trust the app and tell me.
Before You Transfer
- Match the account number on your payment instruction to the Escrow Account panel in Dubai REST.
- Match the same number to the escrow details in your Sales and Purchase Agreement.
- Confirm the amount and the construction milestone it corresponds to.
- If anything differs, even by one digit, stop and message me before sending.
Your Money, Step by Step
How Golf Meadow at Emaar South's Payment Plan Meets the Escrow Account
Golf Meadow sells on nine instalments: 10 percent on booking alongside the 4 percent Dubai Land Department registration fee, seven further instalments of 10 percent through the build, and a closing 20 percent at the 100 percent construction completion mark, dated JUL 2029 on the plan. Five of those instalments are pegged to construction completion marks rather than to the calendar, at 10, 30, 50, 70 and 100 percent, and that distinction is the one buyers most often miss: the printed dates are the developer's estimate, while the money itself is tied to work standing on the plot.
Booking: 10%
Your deposit enters the escrow account once the unit is registered under Oqood. The 4 percent registration fee is a government charge and sits outside the escrow balance.
Construction Instalments: 70%
Seven instalments of 10 percent accumulate in escrow, four of them released against the 10, 30, 50 and 70 percent construction completion marks. With 4.54 percent in the register, this run has barely begun.
Completion: 20%
The closing instalment falls at the 100 percent construction completion mark, dated JUL 2029, ahead of the Q3 2029 handover window.
Insights
Project Insights for Golf Meadow at Emaar South Buyers

You Are Here
This page: the Mashreq escrow details, the verification steps, and how Golf Meadow instalments stay protected.

Golf Meadow at Emaar South: Single-Building Piling Record
Golf Meadow at Emaar South, a single Emaar building of 220+ units on plot 7105, stood at 4.54% in July 2026.
Construction Updates
Golf Meadow at Emaar South Golden Visa: Which Residences Actually Qualify
Golf Meadow at Emaar South, a 12 floor Emaar building, qualifies only through its 3 bedroom apartments and 3 bedroom townhouses.
Golden VisaThe Project
Explore the Golf Meadow at Emaar South Project
This account protects payments toward one specific building on one specific plot, and the quality of that asset is the other half of the decision. The full project guide covers what the protected instalments are buying: layouts, sizes, pricing, amenities, and the golf course setting around them.

Golf Meadow at Emaar South: Apartments and Townhouses by the Park
Golf Meadow at Emaar South offers one to three bedroom Emaar apartments and three bedroom townhouses beside the golf course.
View the Golf Meadow at Emaar South Project GuideStructure
Explore Emaar South Dubai Structure
Project 3579 is one building inside a masterplan built around an 18 hole championship golf course. Reading the wider community, the phases beside it, and the developer behind all of them is how you judge what a protected payment is buying into.

Emaar South Dubai Properties for Sale
Browse apartments, townhouses and villas for sale in Emaar South, with prices, payment plans and availability.
See Emaar South Dubai Properties for Sale
Emaar South Dubai Community Overview
Read the Emaar South guide: a golf community of apartments, townhouses and villas beside Al Maktoum International Airport.
Explore the Emaar South Dubai Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileFAQs
Golf Meadow at Emaar South Escrow Account Frequently Asked Questions
Mashreq Bank PSC holds the escrow account for Golf Meadow at Emaar South, account number 0190*****174 (shown in full in the Escrow Details section above), recorded under Dubai Land Department project number 3579.
Golf Meadow at Emaar South is registered with the Dubai Land Department as project number 3579 on plot 7105 in Madinat Al Mataar, under developer number 1155, Emaar Dubai South DWC LLC. The project was registered on 07 March 2025 and construction was recorded as started on 20 August 2025. Layouts, sizes and pricing are set out in the Golf Meadow at Emaar South project guide.
The plan runs to nine instalments: 10 percent on booking alongside the 4 percent Dubai Land Department registration fee, seven further instalments of 10 percent, and a closing 20 percent at the 100 percent construction completion mark dated JUL 2029. Every instalment is paid into the escrow account first, and funds are released to the developer against verified construction progress, with five instalments tied to the 10, 30, 50, 70 and 100 percent construction completion marks.
The Dubai Land Department register carried 4.54 percent at the inspection dated 19 July 2026, up from 1.76 percent at the previous reading. The Independent Progress Monitoring Report for that date records the progress status as enabling works progressing, with mobilisation ongoing and piling at advanced stages. Month by month detail is tracked on the Golf Meadow construction updates page.
The protection continues regardless of the calendar. Funds remain in the escrow account and are released only against verified construction progress, so a slipped date does not move money out of the account. Escrow protects capital while a project completes; it does not itself compensate for delay, and any compensation terms sit in the Sales and Purchase Agreement.
No. Every off-plan payment for Golf Meadow at Emaar South belongs in the DLD-registered escrow account 0190*****174 at Mashreq Bank PSC (the full number sits in the Escrow Details section above), exactly as recorded in the Sales and Purchase Agreement. A request to send funds to a personal account, an agent's account or an alternative company account, particularly one offering a discount for paying directly, follows the standard pattern of payment diversion fraud however official the paperwork appears. Any such request should be checked against the escrow account registered in Dubai REST and the details in the Sales and Purchase Agreement before any funds are sent.
If the Dubai Land Department cancels a registered project, RERA takes control of the escrow account and buyer refunds are processed from the protected funds under Dubai Land Department supervision. That is precisely why payments belong only in the registered account: money sent anywhere else sits outside the protection entirely. The wider framework is explained in the Dubai Land Department guide.
Yes, Golf Meadow at Emaar South is a freehold project, open to all nationalities.
The property investment threshold for the 10-year Golden Visa is AED 2 million. Entry pricing at Golf Meadow at Emaar South starts at AED 1.12 million (approx USD 0.30 million) for a 1 bedroom apartment, which sits below that threshold, while 3 bedroom apartments from AED 2.45 million (approx USD 0.67 million) and 3 bedroom townhouses from AED 4.95 million (approx USD 1.35 million) sit above it. Qualifying options and application timing are covered in the Golf Meadow Golden Visa guide.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is making sure your money lands where the law protects it. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.