
DAMAC Properties · DAMAC Islands 2
Maui at DAMAC Islands 2 Construction Updates
The Verified Build Record for the Maui Island Cluster in Dubailand
Maui at DAMAC Islands 2 records 0.18% in the DLD register at its 10 June 2026 inspection, the opening entry on a build registered for 2030 delivery.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Maui at DAMAC Islands 2 at a Glance
Maui is one of eight island clusters that make up DAMAC Islands 2 in Dubailand, and it carries a DLD registration of its own: project 4296, covering 434 homes on plot 21374 in Al Yelayiss 1. Construction was recorded as started on 2 May 2026, and the inspection thirty-nine days later put the register at 0.18%. Because this record opens rather than continues, the figures below are the registered anchors that every later reading published on this page will be measured against.
4296
Active
2 May 2026
434 homes
81,001.44 sq m
30 June 2030 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Maui at DAMAC Islands 2 Construction Update Timeline
One inspection sits in this record so far. Thirty-nine days separate the 2 May 2026 construction start from the visit of 10 June 2026, and across that span the DLD register moved Maui at DAMAC Islands 2 from a previous inspection figure of 0% to 0.18%. The RERA report for the visit prints a progress status of Enabling Works - Progressing rather than a percentage, so the figure on the track below is the register reading, and the row beneath it links the full June 2026 update.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| June 2026 | 0.18% | 10 June 2026 | View the June 2026 update |
June 2026 is the only inspection recorded for project 4296 to date, and the previous inspection figure on the register reads 0% with no separate date attached to it. Each new cycle adds a row to this table and a dot to the track above.
Pace Analysis
How Fast Maui at DAMAC Islands 2 Has Been Built
With a single reading on the record, pace at Maui is arithmetic rather than trend. Both figures below are plain division across a named span, and neither of them is a forecast:
- 2 May 2026 start to the 10 June 2026 inspection: enabling works and grading, 0% to 0.18%About 0.1 points per month
- 10 June 2026 reading to the 30 June 2030 registered completion: the arithmetic remainderAbout 2.1 points per month
There is no curve to read yet, and saying so is more useful than dressing up two data points as a trajectory. The first figure divides 0.18 points by the thirty-nine days between the registered start and the first inspection, a window whose recorded works were mobilisation and grading, activities that move a percentage barely at all. The second divides the 99.82 points still outstanding by the span between that reading and the 30 June 2030 registered completion. Neither number is a schedule: on a project of 434 low-rise homes, earthworks earn almost nothing on the register while foundations and concrete frames earn a great deal, so the real profile should be flat now and considerably steeper later. What this page can give an investor or an end user today is a registered start date, a registered completion date, and a first reading confirming the site is live. The second inspection is what turns arithmetic into pace, and it is the first thing worth waiting for.
Get the Next Inspection Figure First
Tell me you are tracking Maui at DAMAC Islands 2 and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Maui at DAMAC Islands 2 at DAMAC Island 2
A percentage only means something against what it is building toward. The full project guide covers what buyers reading this page are tracking:

Maui at DAMAC Islands 2, From Townhouses to Six Bedroom Villas
Maui at DAMAC Islands 2 gathers 434 homes, four bedroom townhouses through six bedroom luxury villas, beside lagoons and parkland.
View the Maui at DAMAC Islands 2 Project GuideConsidering an Early-Stage Entry?
Entering while the register still reads 0.18% means the whole payment schedule is ahead of you rather than behind, and four years of readings are still to be published. If this record is what brought you here, ask me what is currently released at Maui and how the schedule looks from today's entry point.
Ask About Remaining Availability on WhatsAppStage Record
Maui at DAMAC Islands 2 Build Stages, Mapped to the Inspections
Each stage below is pinned to the dates project 4296 actually carries on the DLD register rather than to a generic construction sequence, so the one reading on the record sits in its proper place and the stages still ahead are named as exactly that.
Registration and Pre-Construction
Project 4296 was entered on the DLD register on 29 December 2025 with 434 homes on plot 21374 and a trust account at First Abu Dhabi Bank P.J.S.C., four months before construction was recorded as started.
Site Mobilisation and Grading
The 10 June 2026 inspection found mobilisation ongoing and grading work progressing at an early stage, the activity behind the register's first movement away from 0%.
Foundations and Substructure
The next material movement on project 4296 arrives when footings and ground slabs for the 434 homes are recorded. No inspection has yet placed Maui in this stage.
Concrete Structure and Block
The RERA record describes the homes as concrete structure and block, so the G+1 and G+2 frames across the Maui plot are the phase set to carry most of the distance between the register's 0.18% and delivery.
Finishes and Handover
Internal and external finishes close out the specification held on the register, ending at the 30 June 2030 completion date that project 4296 currently carries.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Maui at DAMAC Islands 2's own record.
Buyer Position
Tracking Your Position at Maui at DAMAC Islands 2
This page is one of four project resources that together cover a Maui at DAMAC Islands 2 purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Maui at DAMAC Islands 2 Construction Updates
This page: the DLD register record for Maui at DAMAC Islands 2, from 0.18% to handover.

Maui at DAMAC Islands 2 Golden Visa: All Four Typologies Qualify
Maui at DAMAC Islands 2 is a 434-home cluster of townhouses, twin villas and luxury villas, each typology qualifying.
Read the Maui at DAMAC Islands 2 Golden Visa Guide
Maui at DAMAC Islands 2: The Escrow Account Behind 434 Homes
First Abu Dhabi Bank holds Maui at DAMAC Islands 2 escrow, DLD project 4296 of 434 units, 0.18% certified June 2026.
Verify the Maui at DAMAC Islands 2 Escrow AccountApproaching Handover
Between 0.18% and Handover: What Maui at DAMAC Islands 2 Buyers Should Do Now
The distance between the register's first fractional entry and its first structural reading is closed by earthworks and foundations, which means a long stretch lies ahead in which instalments fall due while the percentage barely moves. That is precisely why the three checks below belong at the start of a Maui purchase rather than near its end. The schedule runs on your sale date, not on the register: the deposit is payable immediately and the first instalment falls within three months of sale, so the payment calendar starts well before anything visible does on plot 21374.
First, confirm where your money lands. The Maui at DAMAC Islands 2 escrow account page sets out the First Abu Dhabi Bank trust account on the register and how releases are tied to recorded progress rather than to requests.
Second, line your own instalment dates up against the inspection cycle, starting from the Maui June 2026 construction update, so you can see what a reading of 0.18% does and does not represent before the next one lands.
Third, if the purchase may support residency, settle eligibility early through the Maui at DAMAC Islands 2 Golden Visa guide, because an off-plan application follows a different path from one made against a completed title deed.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore DAMAC Island 2 Structure
A build record reads better against the masterplan it sits inside. These three pages put the Maui register reading of 0.18% in its release, community, and developer context:

DAMAC Island 2 Properties for Sale
Explore DAMAC Islands 2 properties for sale: lagoon-front villas and townhouses with flexible payment plans and resort-style island living.
See DAMAC Island 2 Properties for Sale
DAMAC Island 2 Community Overview
Read the DAMAC Islands 2 guide: eight island-themed clusters of lagoon-front villas and townhouses, with masterplan and payment plans.
Explore the DAMAC Island 2 Community
DAMAC Properties: Lagoon Communities, Golf Villas and Branded Collaborations
Founded in 2002, DAMAC has delivered 48,000 homes and is known for large-scale master communities, luxury residential projects and branded collaborations.
View the DAMAC Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Maui at DAMAC Islands 2 Construction Updates Frequently Asked Questions
Maui at DAMAC Islands 2 is an active DLD-registered project, number 4296, recorded at 0.18% in the DLD project register against the inspection dated 10 June 2026. The RERA report for that inspection prints a progress status of Enabling Works - Progressing and carries no percentage of its own, so the register is the source of the figure quoted here. The full record sits in the inspection timeline above.
The inspection dated 10 June 2026 is the only one on the record so far. The DLD register shows 0.18% current progress against a previous inspection figure of 0%, a movement of 0.18 points, and the inspector's note for the visit records mobilisation under way with grading at an early stage. The full site report is published in the Maui at DAMAC Islands 2 June 2026 construction update.
The DLD register carries a registered completion date of 30 June 2030 for project 4296, and DAMAC Properties markets the release for handover in June 2030. That date has not lapsed: at the 10 June 2026 reading the project still had close to four years of its registered window ahead of it and 99.82 points left to record. Registered dates can be revised between cycles, and this page is rebuilt each time a new inspection publishes.
Project 4296 is registered for 434 homes, and that single number is what every percentage on this page is measured against: at 0.18% the register is accounting for site works across the whole 434-home plot, not for any finished home. The plot is 21374 in Al Yelayiss 1, the registered developer on the record is DAMAC Prime Development L.L.C, and DAMAC Properties is the marketing name buyers will recognise.
The DLD register records construction as started on 2 May 2026, a little over four months after the project was registered on 29 December 2025. The first tracked inspection followed thirty-nine days later, on 10 June 2026, and set the register at 0.18%. That reading is the opening entry in the timeline on this page, with nothing before it to compare against except the 0% previous inspection figure.
As of the 10 June 2026 inspection, nothing vertical. The recorded activity is site mobilisation and early grading, the stage that runs before foundations, and the RERA progress status for the visit reads Enabling Works - Progressing. Three inspection photographs were filed with that report in the DLD project record. The 0.18% on the register therefore reflects earthworks on plot 21374 rather than any part of a structure.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Maui at DAMAC Islands 2 construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.