NARA at The Valley by Emaar in The Valley construction updates cover image featuring a project rendering of contemporary townhouses along a landscaped residential street in Dubai - Presented by Tohid Fetrat

Emaar · The Valley

NARA at The Valley Construction Updates

The Closed Inspection File Behind a Finished Valley Townhouse Cluster

NARA at The Valley reached 100% construction at its 25 November 2024 RERA inspection, closing the record on 372 finished townhouses inside Emaar's Valley masterplan.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

100%Construction Progress
25 November 2024Latest RERA Inspection
372 townhousesTotal Units
Project 2274DLD Registration

Construction Snapshot

NARA at The Valley at a Glance

NARA at The Valley is Emaar's second townhouse phase inside The Valley, 372 three and four bedroom homes built over ground plus one floor on plot 160 at Al Yufrah 1. Its Dubai Land Department file runs from a 26 July 2021 registration and a 01 December 2021 site start to the 100% reading recorded on 25 November 2024, and that is where the file stops. Most projects tracked on this site are still climbing toward a number; this one is read backwards, from a register that already carries the word Completed, which changes what every figure below is for.

DLD Project Number

2274

Project Status

Finished

Construction Start

01 December 2021

Total Units

372 townhouses

Total Built-Up Area

74,255.75 sq m

Registered Completion Date

30 December 2024 (DLD)

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

NARA at The Valley Construction Update Timeline

This record is short, and it ends where most do not. The register carries one dated reading for project 2274, 100% on 25 November 2024, and one earlier reading of 94.51% that it publishes without any date against it. That is why the track below shows two points while the table underneath carries a single row: only the closing inspection has a date and a published update behind it, and an undated figure cannot be placed on a timeline without inventing when it happened.

Inspection MonthConstruction ProgressInspection DateFull Update
November 2024100%25 November 2024View the November 2024 update
!

Reading the dates: the DLD-registered completion date for project 2274 is 30 December 2024, which has now passed. On this project that is not a warning sign. The inspection five weeks earlier, on 25 November 2024, had already recorded 100%, the project status reads Finished and the RERA Progress Indicator reads Completed, so the register and the handover position agree. Emaar confirms the position for an individual townhouse at transfer.

Pace Analysis

How Fast NARA at The Valley Has Been Built

Two readings sit on the register for project 2274, and only one of them is dated. That limits what can honestly be said about speed here, so the record is read for distance and for shape instead:

  • Previous inspection to 25 Nov 2024: 94.51% to 100%, the finishing and certification cyclePlus 5.49 points
  • 25 Nov 2024 onward: register closed at 100% with the Progress Indicator at CompletedZero points outstanding

A points-per-month figure needs two dated readings. The earlier 94.51% entry carries no date on the register, so any speed quoted for NARA would be invented rather than computed, and none appears on this page. What the two figures do establish is the shape of the ending. The cluster entered its last inspection cycle already past 94%, which means the closing 5.49 points were finishing, certification and connection work rather than anything structural, and the 25 November 2024 notes support exactly that, recording the external and infrastructure scope as closed, utilities running to the homes, and the cluster fit to be lived in. Emaar had been collecting completion certificates from the Dubai Development Authority since February 2024, months before the closing inspection was recorded. For a buyer the useful conclusion is not how fast NARA was built but that the register stopped moving: there is no remaining construction distance between this page and a set of keys.

Get the Next Inspection Figure First

Tell me you are tracking NARA at The Valley and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About NARA at The Valley at The Valley by Emaar

A completion percentage only means something next to what was completed. The project guide covers the homes standing behind the closing reading on this page:

NARA at The Valley by Emaar modern townhouse row exterior in Dubai - Presented by Tohid Fetrat

NARA at The Valley: Aston, Charm and Palma Townhouses

NARA at The Valley is an Emaar community of 372 single-row townhouses with three and four bedrooms, set around integrated parks.

View the NARA at The Valley Project Guide

Considering a Completed Townhouse Entry?

On a finished cluster, availability moves through resale and remaining developer stock rather than a launch list, and it narrows as homes transfer. If the record on this page is what brought you here, ask me what is open at NARA right now.

Ask About Remaining Availability on WhatsApp

Stage Record

NARA at The Valley Build Stages, Mapped to the Inspections

Rather than a generic construction sequence, each stage below is tied to a date or a reading that project 2274 actually carries, so you can see which parts of this build are documented and which are not.

26 Jul 2021 to 01 Dec 2021

Registration to Site Start

Project 2274 was entered on the DLD register on 26 July 2021 under Emaar Development P.J.S.C., developer number 1211, with construction starting on plot 160 on 01 December 2021.

From 01 Dec 2021

Concrete Structure and Block Work

The registered build type for all 372 townhouses: a concrete frame with block work over ground plus one floor, followed by finishes applied inside and out across the cluster.

From Feb 2024

Completion Certificates Issued

The 25 November 2024 inspection notes record building and development completion certificates obtained from the Dubai Development Authority starting February 2024, the earliest dated milestone in the closing phase.

Previous inspection, undated at 94.51%

The Last Reading Before 100%

The register holds a 94.51% reading immediately before the closing one but publishes no date against it, so it can be placed in sequence and not on a calendar. It is the only other figure in the file.

Current Phase25 Nov 2024 at 100%

Completion Recorded and Occupancy Ready

The closing inspection put project 2274 at 100%. Three sign-offs sit behind that figure: the external and infrastructure scope closed out, utilities live to every home, and occupancy readiness across the cluster. Progress Indicator Completed, status Finished.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on NARA at The Valley's own record.

Buyer Position

Tracking Your Position at NARA at The Valley

This page is one of four project resources that together cover a NARA at The Valley purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

NARA at The Valley by Emaar in The Valley construction updates cover image featuring a project rendering of contemporary townhouses along a landscaped residential street in Dubai - Presented by Tohid Fetrat
You Are Here

NARA at The Valley Construction Updates

This page: the closed DLD inspection record for NARA at The Valley, from registration to 100%.

NARA at The Valley by Emaar in The Valley Golden Visa card graphic above contemporary townhouses and a landscaped residential street in Dubai - Presented by Tohid Fetrat

NARA at The Valley Golden Visa Through One Finished Townhouse

NARA at The Valley is a finished Emaar community of 372 townhouses where both the 3 and 4 bedroom typologies qualify.

Read the NARA at The Valley Golden Visa Guide
NARA at The Valley by Emaar in The Valley escrow account protection concept with shield and padlock icons above a contemporary townhouse exterior at dusk in Dubai - Presented by Tohid Fetrat

NARA at The Valley Escrow: Commercial Bank of Dubai's Valley Account

NARA at The Valley, DLD project 2274, escrowed 372 units at Commercial Bank of Dubai and read 100% certified November 2024.

Verify the NARA at The Valley Escrow Account
NARA at The Valley by Emaar in The Valley snagging inspection cover image featuring an open-plan living dining and kitchen interior with staircase and full-height windows in Dubai - Presented by Tohid Fetrat

NARA at The Valley Snagging for a Freehold Townhouse Cluster

NARA at The Valley is an Emaar cluster of 372 townhouses of three and four bedrooms over ground plus one floor.

Book NARA at The Valley Snagging

Approaching Handover

Between 100% and Handover: What NARA at The Valley Buyers Should Do Now

With project 2274 closed at 100%, nothing standing between a buyer and occupancy is construction. What remains is documentation, inspection and payment sequencing. On a finished cluster the gap between signing and keys is short, and every check below is far harder to run once you have accepted the home than before, so they belong in this window rather than after it.

First, arrange independent snagging while refusing acceptance is still an option; the NARA at The Valley snagging inspection page sets out what gets inspected on a G+1 townhouse and at which point in the handover sequence.

Second, confirm how instalments were released against certified milestones on the NARA at The Valley escrow account page, so any closing payment settles against a verified record rather than a request.

Third, if the purchase may support residency, settle eligibility before transfer through the NARA at The Valley Golden Visa guide, since title deed timing sets the application path.

Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore The Valley by Emaar Structure

A build record is only half the picture; the other half is what stands around it. These three pages put NARA's closed file into its masterplan, community and developer context:

Modern townhouses and villas with contemporary architecture landscaped surroundings and private parking along a residential street at The Valley Dubai Presented by Tohid Fetrat

The Valley by Emaar Properties for Sale

Browse townhouses and villas for sale in The Valley, comparing phases, prices and payment plans.

See The Valley by Emaar Properties for Sale
Evening view of The Valley by Emaar community clubhouse with swimming pool palm trees sun loungers and modern leisure facilities in Dubai Presented by Tohid Fetrat

The Valley by Emaar: Nature-Inspired Villas and Townhouses on Dubai-Al Ain Road

Launched in 2019, The Valley has villa and townhouse clusters with a central Town Centre, Golden Beach and parks.

Explore the The Valley by Emaar Community
Emaar Properties developer showcasing Downtown Dubai skyline with Burj Khalifa and surrounding residential and commercial towers at dusk Presented by Tohid Fetrat

Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities

Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.

View the Emaar Properties Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

NARA at The Valley Construction Updates Frequently Asked Questions

NARA at The Valley is recorded as Finished on the Dubai Land Department register for project 2274, with construction progress at 100% as of the RERA inspection dated 25 November 2024 and the RERA Progress Indicator reading Completed. The two readings the register holds are set out in the inspection timeline above.

The inspection dated 25 November 2024 recorded 100% construction progress, 5.49 points above the previous reading of 94.51%. The notes behind that figure treat the external and infrastructure scope as finished, the utilities as connected and the homes as fit to occupy. The full entry is published in the November 2024 construction update.

No pace figure can be published for NARA at The Valley, and the reason sits in the register itself: the earlier reading of 94.51% carries no inspection date, so there is no interval to divide the 5.49 point gain by. What the file does fix is the distance covered in the closing cycle, 94.51% to 100% by 25 November 2024, and the 01 December 2021 start date behind it. The reasoning is set out in the pace analysis above.

The Dubai Land Department register records 30 December 2024 as the completion date for project 2274. That date has passed, and on this project it agrees with the rest of the file rather than contradicting it: the 25 November 2024 inspection had already recorded 100%, the project status reads Finished, and the RERA Progress Indicator reads Completed. Handover on this cluster is ready.

NARA at The Valley comprises 372 townhouses in three and four bedroom layouts, each arranged over ground plus one floor. The register description of project 2274 lists the same 372 count, the G+1 form, and a concrete and block build carrying finishes inside and out. Sizes and floor plans are covered in the NARA at The Valley project guide.

Construction started on 01 December 2021, a little over four months after the project was registered with the Dubai Land Department on 26 July 2021. From that start to the 100% reading of 25 November 2024 is just under three years on the register, and no earlier dated inspection exists between the two.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the NARA at The Valley construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.