Two Plaza-Facing Buildings, Recorded Complete Beside Creek Beach

Orchid at Dubai Creek Harbour recorded 100% at its 10 October 2024 RERA inspection, closing out both plaza-facing Creek Beach buildings with the handover status now Ready.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

100%Construction Progress
10 October 2024Latest RERA Inspection
208 residential unitsTotal Units
Project 2383DLD Registration

Construction Snapshot

Orchid at Dubai Creek Harbour at a Glance

Orchid at Dubai Creek Harbour is Emaar's 208-apartment Creek Beach phase: two buildings, G+M+12 and G+M+9, set around an inner plaza. Its DLD record runs from a 05 March 2022 construction start to 100% on 10 October 2024, about 31 months, and that closing reading is now 713 days old. For a phase this compact the register tells a short story, one dated figure set against an undated 94.58%, and the cards below are the anchors that story rests on.

DLD Project Number

2383

Project Status

Finished

Construction Start

05 March 2022

Total Units

208 residential units

Total Built-Up Area

308,933.57 sq m

Registered Completion Date

30 September 2025 (passed)

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

Orchid at Dubai Creek Harbour Construction Update Timeline

Two readings make up Orchid's inspection record, and only the second carries a date: 94.58% at an earlier inspection the DLD register leaves undated, then 100% on 10 October 2024, a rise of 5.42 points. The track below plots both, and the single table row links the October 2024 monthly update, the closing entry, which is 713 days old as of 23 September 2026.

Inspection MonthConstruction ProgressInspection DateFull Update
October 2024100%10 October 2024View the October 2024 update
!

Reading the dates: the DLD-registered completion date for project 2383 is 30 September 2025, and the 10 October 2024 inspection had already logged 100%, 355 days before it. With the register now showing Finished and the handover status Ready, the registered date stays on this page as the administrative date of record, not as a delivery forecast.

Pace Analysis

How Fast Orchid at Dubai Creek Harbour Has Been Built

A points-per-month pace needs two dated inspections, and Orchid's register dates only one, so no velocity is computed here. The record still fixes four comparisons:

  • 05 Mar 2022 start to 100% on 10 Oct 2024About 31 months
  • Undated 94.58% to 100% on 10 Oct 2024Up 5.42 points
  • 100% on 10 Oct 2024 against registered completion of 30 Sep 2025355 days ahead
  • 10 Oct 2024 reading against this page's 23 Sep 2026 build date713 days old

Without a second dated point, Orchid's curve cannot show acceleration or taper, and any monthly rate built on the 94.58% figure would be a guess. What the figures do settle is the finish: two mid-rise buildings, G+M+12 and G+M+9, reached 100% on 10 October 2024 with DCD and BCC already issued, almost a year before their registered completion date. For an investor, that takes delivery timing out of the analysis altogether; for an end user, the open questions are the current register entry and the condition of one specific apartment, not the build.

Get the Next Inspection Figure First

Tell me you are tracking Orchid at Dubai Creek Harbour and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About Orchid at Dubai Creek Harbour

A 100% reading from October 2024 only means something next to what it delivered. The full project guide covers the finished apartments this record tracked:

Orchid at Dubai Creek Harbour by Emaar Properties vibrant community plaza with landscaped walkways fountains retail cafes and modern apartment buildings in Dubai Presented by Tohid Fetrat

Orchid at Dubai Creek Harbour, Twin Buildings in Creek Beach

Orchid at Dubai Creek Harbour is an Emaar pair of buildings in Creek Beach, holding 208 apartments around a landscaped plaza.

View the Orchid at Dubai Creek Harbour Project Guide

Considering a Ready Orchid Apartment?

Orchid is listed with limited units available, and what remains in a finished building can change quickly. If the record on this page is what brought you here, ask me for current availability before you shortlist.

Ask About Remaining Availability on WhatsApp

Stage Record

Orchid at Dubai Creek Harbour Build Stages, Mapped to the Inspections

Orchid's record is short on dated readings, so each stage below is anchored to what the DLD register and the October 2024 report actually fix: two dates at the start, one undated figure, and one dated closing reading.

Mar 2022 to Apr 2022

Construction Start and Registration

The register records construction starting on 05 March 2022 and project 2383 being registered on 05 April 2022, on plot 169 in Al Khairan First.

2022 to 2024, no dated reading

Two Buildings Rise, G+M+12 and G+M+9

Building 1 rose to G+M+12 and Building 2 to G+M+9 around the inner plaza; the register prints no dated percentage for this structural period.

Undated, 94.58%

Finishing Recorded at 94.58%

The inspection before October 2024 logged 94.58%, the last reading short of completion; the DLD register does not show when it took place.

10 Oct 2024 at 100%

Completion Recorded

The register logged 100% on 10 October 2024; the progress report for that visit gives a status of Completed and notes DCD and BCC issued and all DEWA meters installed.

Current PhaseOct 2024 onward, 100% at last reading

Finished Buildings, Handover Ready

The registered completion date of 30 September 2025 has passed, the register lists Orchid as Finished, and the handover status is Ready, with the 100% of 10 October 2024 as the closing reading.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Orchid at Dubai Creek Harbour's own record.

Buyer Position

Tracking Your Position at Orchid at Dubai Creek Harbour

This page is one of four project resources that together cover a Orchid at Dubai Creek Harbour purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Orchid by Emaar Properties in Dubai Creek Harbour construction updates cover image featuring a project rendering of a palm-lined central plaza with fountain landscaping and residential buildings in Dubai - Presented by Tohid Fetrat
You Are Here

Orchid at Dubai Creek Harbour Construction Updates

This page: Orchid's dated RERA record, from the March 2022 start to 100% in October 2024.

Orchid by Emaar Properties in Dubai Creek Harbour Golden Visa graphic with a gold visa card above a landscaped residential plaza and apartment buildings in Dubai - Presented by Tohid Fetrat

Orchid at Dubai Creek Harbour Golden Visa: A Finished Creek Beach Address

Orchid at Dubai Creek Harbour, 208 Emaar apartments on title deed, qualifies at 2 and 3 bedrooms; 1 bedrooms sit below.

Read the Orchid at Dubai Creek Harbour Golden Visa Guide
Orchid by Emaar Properties in Dubai Creek Harbour escrow account protection graphic with shield and padlock icons above landscaped residential buildings in Dubai - Presented by Tohid Fetrat

Orchid at Dubai Creek Harbour Escrow, Certified in Full in 2024

Orchid at Dubai Creek Harbour, DLD project 2383, read 100% certified October 2024, its 208 units escrowed at Dubai Islamic Bank.

Verify the Orchid at Dubai Creek Harbour Escrow Account
Orchid by Emaar Properties in Dubai Creek Harbour snagging inspection graphic over an open-plan dining and kitchen interior with balcony in Dubai - Presented by Tohid Fetrat

Orchid at Dubai Creek Harbour Snagging Around a Shared Inner Plaza

Orchid at Dubai Creek Harbour is two Emaar buildings of 208 apartments, one to three bedrooms, set footsteps from Creek Beach.

Book Orchid at Dubai Creek Harbour Snagging

Approaching Handover

Between 100% and Handover: What Orchid at Dubai Creek Harbour Buyers Should Do Now

At Orchid the percentage is closed: 100% was logged on 10 October 2024 and the handover status is Ready, so what stands between a buyer and the keys is paperwork and the condition of one apartment, not construction. A transfer on a finished unit moves on a short timeline once terms are agreed, so the three steps below belong before you sign, not after.

First, commission an independent inspection of the apartment itself so any defects are on record before you accept it; the Orchid at Dubai Creek Harbour snagging page covers what is checked and when.

Second, confirm the payment position on your unit against the escrow record for project 2383 at Dubai Islamic Bank; the Orchid at Dubai Creek Harbour escrow account page explains how instalments were released against certified progress.

Third, if residency is part of the plan, check eligibility before transfer through the Orchid at Dubai Creek Harbour Golden Visa guide: the 2 and 3 bedroom apartments, from AED 2.65M ≈ USD 721K, clear the AED 2M ≈ USD 545K threshold, while the 1 bedroom, from AED 1.60M ≈ USD 436K, does not.

Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore Dubai Creek Harbour Structure

A closed build record says most when it is read against what surrounds it. These three pages set Orchid's completion in its listings, community, and developer context:

Dubai Creek Harbour Properties for Sale waterfront community view with Creek waters modern residential towers and Downtown Dubai skyline Presented by Tohid Fetrat

Dubai Creek Harbour Properties for Sale

Browse waterfront apartments, branded residences and penthouses for sale in Dubai Creek Harbour.

See Dubai Creek Harbour Properties for Sale
Dubai Creek Harbour skyline with The Grand by Emaar and Dubai Creek Tower – luxury waterfront community with marina and skyline views, presented by Tohid Fetrat.

Dubai Creek Harbour: Emaar's Waterfront City With a Marina and Urban Beach

Dubai Creek Harbour is Emaar's waterfront city between Downtown Dubai and the Creek, planned for 48,500 homes with skyline views.

Explore the Dubai Creek Harbour Community
Emaar Properties developer showcasing Downtown Dubai skyline with Burj Khalifa and surrounding residential and commercial towers at dusk Presented by Tohid Fetrat

Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities

Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.

View the Emaar Properties Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

Orchid at Dubai Creek Harbour Construction Updates Frequently Asked Questions

Orchid at Dubai Creek Harbour is complete on the record: DLD project 2383 is listed as Finished, the last RERA inspection on 10 October 2024 logged 100%, and the handover status is Ready. That inspection is 713 days old as of 23 September 2026, so the live register entry should be re-checked before relying on it. The full record is in the inspection timeline above.

The last reading in the DLD register is 100% on 10 October 2024, 5.42 points above the 94.58% logged at the inspection before it, which the register shows without a date. The inspection data for that visit is set out in the Orchid October 2024 construction update.

The DLD-registered completion date for project 2383 was 30 September 2025, and that date has now passed. Orchid had already logged 100% on 10 October 2024, 355 days earlier, and the register now shows the project as Finished with a handover status of Ready; this page's record is updated if the register entry changes.

Orchid at Dubai Creek Harbour holds 208 residential units, all 1, 2 and 3 bedroom apartments, split across two buildings of G+M+12 and G+M+9 set around an inner plaza. No verified built-up area figure is published for the project, so this page records the building configuration in its place.

The DLD register records the construction start as 05 March 2022 and the project registration as 05 April 2022. The earliest progress figure in the record is the undated 94.58% inspection, followed by 100% on 10 October 2024, about 31 months after the recorded start.

A monthly pace needs two dated readings, and only one of Orchid's two readings has a date: 100% on 10 October 2024. The earlier 94.58% carries no date in the DLD register, so the 5.42-point rise stays a plain difference rather than a rate; the pace analysis above lists what the record does support.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the Orchid at Dubai Creek Harbour construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

WhatsApp +971543443597
Get the Latest Status