Emaar · Dubai Hills Estate · Construction Update
Vida Residences Dubai Hills Estate Construction Update - June 2026
June 2026 Inspection Confirms Vida Residences Reaches 85.12% Construction Progress in Dubai Hills Estate
Internal finishes, podium pool works, and the closing envelope packages carry the programme at Vida Residences, verified at 85.12 percent in the June 2026 RERA inspection cycle.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Vida Residences Construction Snapshot
A 15.12 point rise since the 13 February 2026 reading puts Vida Residences at 85.12%, the stage where a tower is judged by what is left to install rather than by what is left to build.
Vida Residences Dubai Hills Estate
2795
Active
85.12%
2 June 2026
23 January 2024
217 homes
23,803.81 sq m
Q3 2028
Data source: RERA independent progress monitoring report dated 2 June 2026, tracked against the DLD project register for project 2795. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: July 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Vida Residences Construction Progress Summary
The 2 June 2026 inspection records Vida Residences at 85.12%, up from 70% on 13 February 2026: 15.12 points added in a little under four months. Enabling, piling, foundation, and structure works stay signed off on the record, while external envelope, MEP, internal works, internal finishes, and external works are listed as progressing, and the progress status is logged as main contract progressing. What the photographs filed with this cycle show is a building being fitted out rather than assembled.
- Enabling and piling works on plot 4952
- Foundation and basement works beneath the podium
- Tower structure through 23 floors to roof level
- External envelope closing out across the tower elevations
- MEP installations through apartment risers and plant areas
- Internal finishes: door sets fitted and floors laid under protection
- External works at podium level, including the tiled pool
- Remaining RERA inspection cycles through 2027 toward 100%
- Testing, commissioning, and building completion certificate procedures
- Handover from the contracted Q3 2028 window
Payment Linked Progress
What 85.12% Progress Means for Vida Residences Buyers
Emaar tied this project's instalments to verified construction percentages rather than to calendar dates alone, so a certified 85.12% is a payment document before it is a progress note: it marks which triggers have already fired and which are still ahead. Four actions carry the most weight at this point in the build.
Verify the escrow account
Every payment ahead of handover belongs in the DLD regulated escrow account registered for project 2795, held with Emirates NBD Bank as the trust account bank named on the RERA record. Vida Residences escrow account verification comes before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA milestone schedule
The published schedule pairs its eighth instalment with 80% construction completion and prints a 2027 date beside it. At 85.12% certified on 2 June 2026 that percentage is already behind the build, so read the trigger, not the calendar. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the certified milestones.
Plan the snagging window
Booking a pre handover inspection needs a late stage reading and a handover date inside roughly nine months together; at 85.12% with Q3 2028 contracted, only the first condition is met. Vida Residences snagging inspection guide sets out what to arrange, and the 2027 cycles are when to arrange it.
Track the remaining cycles
Just under fifteen points separate this reading from full certification, and that final stretch is where testing and authority sign offs decide the real date. The Vida Residences construction updates hub carries each certified reading as it is published.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 85.12%?
Entering here buys an unusual pairing: a building that is nearly finished being built, and a handover date on the agreement that still reads Q3 2028. The structural risk sits behind the June 2026 record, while the contractual wait has not moved. Because the plan is construction linked, the milestones already raised settle at booking instead of spreading forward. Every payment goes to the DLD-registered escrow account for project 2795, released against certified construction progress.
- Structure and most of the envelope certified on the 2 June 2026 record
- Nearly two and a half years of the build already recorded since the January 2024 start
- The elapsed share of the construction linked plan falls due up front
- Construction risk carried from excavation all the way to keys
- Three to four years is the normal wait from launch to handover
- A longer instalment runway, at launch pricing
The project page lists limited availability as of this update; the remaining mix moves between cycles and is checked against the live release list at the time of enquiry.
About the Development
Vida Residences Dubai Hills Estate Project Details

Now past the fit out threshold, Vida Residences is a 23 storey Emaar tower on its own amenities podium, holding 217 branded homes: 1, 2, and 3 bedroom apartments plus eight 3 bedroom townhouses at podium level. Starting prices: AED 1.60M ≈ USD 436K.
Entering at this stage means remaining risk that sits in finishes and sign offs rather than in construction, weighed against a contracted Q3 2028 handover and a day one payment covering every milestone already raised.
Site Context This Cycle
Explore Vida Residences Location on Dubai Map
Vida Residences occupies plot 4952 in Hadaeq Sheikh Mohammed Bin Rashid, facing Dubai Hills Park along its western frontage and rising from an amenities podium of its own rather than a shared deck. This cycle, the podium is where the visible movement is: the pool filed in the June inspection photographs is tiled and being finished, and the external works package runs on a self contained plot with no neighbouring build to sequence around.
Because Dubai Hills Estate was delivered years before this tower broke ground, with the park, the mall eight minutes on foot, Kings College Hospital, and the championship golf course all already trading, nothing about the surroundings is still a promise. For a buyer, that narrows the open question from what this neighbourhood becomes to how the last 14.88 points of this specific building get certified. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Vida Residences During Internal Finishing Works
With the structure and most of the envelope behind it, the live questions move to payment verification, residency eligibility, and preparing for an acceptance that is still several cycles away. Each resource below matches where Vida Residences stands on the June 2026 record.

Vida Residences Construction Updates
This page: the verified June 2026 inspection record for Vida Residences, at 85.12 percent complete.

Vida Residences at Dubai Hills Estate Golden Visa Across 217 Branded Homes
Emaar's 23-storey Vida Residences at Dubai Hills Estate qualifies on three of four tiers; only the 1 bedroom apartment sits below.
Read Vida Residences Golden Visa Guide
Vida Residences at Dubai Hills Estate Escrow, the Emirates NBD Ledger
Emirates NBD holds Vida Residences at Dubai Hills Estate escrow, DLD project 2795: 217 units, 85.12% certified in June 2026.
Verify Vida Residences Escrow Account
Vida Residences at Dubai Hills Estate Snagging: Branded Homes and Podium Townhouses
Vida Residences at Dubai Hills Estate is a 23 storey Emaar tower of 217 branded homes with eight podium level townhouses.
Book Vida Residences SnaggingUpdate Timeline
Other Vida Residences Construction Updates
Every published cycle for this tower sits below, so the 85.12% reading can be weighed against the ones that came before it.
Where This Update Fits
Explore Vida Residences Structure
A single reading is only useful in context: the community this tower opens onto, the developer behind the programme, and the stock a buyer would weigh against it.

Dubai Hills Estate Properties for Sale
Compare the Emaar projects for sale in this community, with current prices, payment plans and handover dates.
See Dubai Hills Estate Properties for Sale
Dubai Hills Estate Community Overview
Read the Dubai Hills Estate guide: 2,700 acres of parks, an 18-hole championship golf course and Dubai Hills Mall.
Explore the Dubai Hills Estate Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileFAQs
Vida Residences Dubai Hills Estate Construction Progress in June 2026: Frequently Asked Questions
The RERA independent progress monitoring report dated 2 June 2026 records Vida Residences Dubai Hills Estate at 85.12% construction progress under DLD project number 2795, with the progress status listed as main contract progressing.
The project moved from 70% on 13 February 2026 to 85.12% on 2 June 2026, a gain of 15.12 points in a little under four months. That is the interval in which the tower crossed from envelope work into the internal finishing phase.
The 2 June 2026 report keeps enabling, piling, foundation, and structure works signed off, and lists external envelope, MEP, internal works, internal finishes, and external works as the packages progressing. The inspection photographs filed with this cycle show tiled pool works at podium level and apartment corridors with door sets fitted and floor finishes laid under protection.
On the certified reading, yes: the published Emaar schedule for this project attaches its eighth instalment to 80% construction completion, and the 2 June 2026 record puts the build at 85.12%. Which trigger applies to an individual home, and whether the printed date or the percentage governs it, is set by that buyer's own sale and purchase agreement.
Q3 2028 is the contracted handover window, not a projection from the progress curve, and it stays on the record until the developer revises it. The remaining 14.88 points also cover the slowest part of any build: testing and commissioning, authority inspections, and the building completion certificate. How readings move through certification is covered on the Vida Residences construction updates hub.
Not on this reading. The booking window needs two conditions together, a late stage percentage and a handover date inside roughly nine months, and at 85.12% with Q3 2028 contracted only the first is satisfied. The cycles running through 2027 are the point to line it up, well before any handover notice arrives.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the June 2026 inspection record for Vida Residences at Dubai Hills Estate correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.