Volta by DAMAC stood at 29.26% in the DLD register on 18 August 2026, and its dated readings show the Sheikh Zayed Road tower's climb gathering pace.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Volta at a Glance
Volta by DAMAC is a 417-unit residential tower by DAMAC Properties on the Sheikh Zayed Road side of Downtown Dubai, entered in the Dubai Land Department register as Volta Tower under project 2782. Construction began on 13 December 2023 and had reached 29.26% by the 18 August 2026 reading, some 32 months later; buyers are working to a stated handover of Q2 2028, while the register carries 31 December 2027 as the completion date. The monitoring reports describe project 2782 as the residential tower plus an adjacent parking building, so every reading on this page measures both structures as one project.
2782
Active
13 December 2023
417 Residential Units
44,016.17 sq m
31 December 2027 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Volta Construction Update Timeline
The dated Volta by DAMAC record opens on 11 April 2026 at 20.79% and continues on 18 August 2026 at 29.26%, a climb of 8.47 points in 129 days. Before April, the register shows only a previous figure of 14.87% with no inspection date, which is why it sits on the track below as an unlabelled dot and has no table row of its own. Each row links the full monthly update for that inspection.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| August 2026 | 29.26% | 18 August 2026 | View the August 2026 update |
| April 2026 | 20.79% | 11 April 2026 | View the April 2026 update |
Pace Analysis
How Fast Volta Has Been Built
With one dated pair of readings so far, the Volta by DAMAC pace splits into one measured interval and two long averages. All three are arithmetic on DLD register readings over 30-day months, not forecasts:
- 13 Dec 2023 to 11 Apr 2026: groundworks to the first dated reading, start to 20.79% (average)About 0.7 points per month
- 11 Apr 2026 to 18 Aug 2026: superstructure phase, 20.79% to 29.26% in 129 days (measured)About 1.97 points per month
- 13 Dec 2023 to 18 Aug 2026: whole build, start to 29.26% in 979 days (average)About 0.9 points per month
The measured interval runs well ahead of both averages. The 28 months before 11 April 2026 cover enabling works, foundations and a substructure that the April report already placed at an advanced stage, the slower-moving groundwork of any tower; between April and August the register then gained 8.47 points while the August report moved internal work and MEP work to progressing alongside the superstructure. The undated 14.87% adds a 5.92 point step into April but cannot be turned into a rate. On the record as it stood on 18 August 2026, 70.74 points remain, the registered completion date of 31 December 2027 is 500 days away, and the stated handover is Q2 2028; this page sets those facts side by side without projecting a finish date. For an end user, the next readings show whether a rate of about 1.97 points a month carries into envelope and finishing work; for an investor on DAMAC's time-based instalments, pace changes how much built progress stands behind each payment, not when the payment falls due.
Get the Next Inspection Figure First
Tell me you are tracking Volta and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Volta at Downtown Dubai
The 29.26% reading of 18 August 2026 only matters in the context of what the tower will deliver. The full project guide covers what Volta by DAMAC buyers are tracking toward on this page:

Volta by DAMAC: A Fitness-Led Tower on Sheikh Zayed Road
Volta by DAMAC is a 60-storey tower on Sheikh Zayed Road, with 417 apartments planned around fitness and wellbeing.
View the Volta Project GuideConsidering a Mid-Construction Entry?
Volta by DAMAC is listed as Limited units Available, and what is on release shifts between inspection cycles. If the record on this page is what brought you here, ask me for current availability before the next reading is published.
Ask About Remaining Availability on WhatsAppStage Record
Volta Build Stages, Mapped to the Inspections
Each stage below is pinned to the dates Volta by DAMAC actually passed through, from registration on 27 September 2023 to the 29.26% reading of 18 August 2026, with the last two stages still largely ahead of the record.
Registration and Site Start
Entered in the DLD register on 27 September 2023 as project 2782 on plot 109, with construction logged as started on 13 December 2023.
Enabling Works and Foundations
Recorded as completed in the 11 April 2026 report, when the register stood at 20.79%, and as substantially completed in the 18 August 2026 report.
Substructure and Superstructure
Substructure at an advanced stage in both reports, with the superstructure progressing at different stages as the register moved from 20.79% on 11 April 2026 to 29.26% on 18 August 2026.
Envelope, MEP, and Interior Works
All placed at early stages on 11 April 2026; by 18 August 2026 internal work and MEP work were progressing, while the external envelope remained at an early stage.
Finishing, Completion, and Handover
Internal finishes, still at an early stage on 18 August 2026, lead to completion, where DAMAC's terms place the final 20% instalment, and to the Q2 2028 handover.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Volta's own record.
Buyer Position
Tracking Your Position at Volta
This page is one of four project resources that together cover a Volta purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Volta Construction Updates
This page: every dated DLD register reading for Volta by DAMAC, from construction start to handover.

Volta by DAMAC Golden Visa: A Downtown Tower From 2 Bedrooms
Volta, DAMAC's 417-unit Downtown Dubai tower, qualifies from the 2 bedroom apartment; the 1 bedroom apartments do not alone.
Read the Volta Golden Visa Guide
Volta by DAMAC: The Downtown Escrow Account at Emirates NBD
DAMAC's Volta in Downtown Dubai pays Emirates NBD escrow as DLD project 2782, 417 units, 29.26% certified August 2026.
Verify the Volta Escrow AccountApproaching Handover
Between 29.26% and Handover: What Volta Buyers Should Do Now
At 29.26% on 18 August 2026, Volta by DAMAC is still raising its superstructure, and the Q2 2028 handover is a long way off for anyone paying through the build. DAMAC's terms time every instalment in months from the sale date, so the next one falls due on schedule whatever the next reading shows, which is why the three checks below belong before that date rather than after it.
First, confirm that every transfer is going to the account set out on the Volta by DAMAC escrow account page, the DLD-registered account for project 2782.
Second, lay the instalment dates in your SPA beside the dated readings in the inspection timeline, so you know how much recorded progress stands behind what you have already paid.
Third, if residency is part of your plan, check your tier early in the Volta by DAMAC Golden Visa eligibility guide, since each Volta tier is measured against the property value rule on its own price rather than on construction progress.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore Downtown Dubai Structure
These three pages set the Volta by DAMAC record against the Downtown Dubai market it will join, the community around Sheikh Zayed Road, and the developer behind the tower:

Downtown Dubai Properties for Sale
Browse apartments, branded residences and penthouses for sale around Burj Khalifa and The Dubai Mall.
See Downtown Dubai Properties for Sale
Downtown Dubai Community Overview
Read the Downtown Dubai guide: Emaar's city core around Burj Khalifa, The Dubai Mall and Dubai Opera, with prices and returns.
Explore the Downtown Dubai Community
DAMAC Properties: Lagoon Communities, Golf Villas and Branded Collaborations
Founded in 2002, DAMAC has delivered 48,000 homes and is known for large-scale master communities, luxury residential projects and branded collaborations.
View the DAMAC Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Volta Construction Updates Frequently Asked Questions
Volta by DAMAC is an active project in the Dubai Land Department register, number 2782 under the name Volta Tower, recorded at 29.26% following the 18 August 2026 inspection. The monitoring report for that date places the substructure at an advanced stage, with superstructure, internal work and MEP work progressing at different stages; every dated reading is in the inspection timeline above.
The 18 August 2026 inspection recorded Volta by DAMAC at 29.26% in the DLD register, up 8.47 points from the 20.79% reading of 11 April 2026. The site notes for that visit are set out in the August 2026 Volta by DAMAC construction update.
The Volta by DAMAC register record holds three progress figures so far: an undated previous reading of 14.87%, then 20.79% on 11 April 2026 and 29.26% on 18 August 2026, a combined rise of 14.39 points. The April reading and its site notes are covered in the April 2026 Volta by DAMAC construction update.
Between the dated readings of 11 April 2026 (20.79%) and 18 August 2026 (29.26%), Volta by DAMAC gained 8.47 points in 129 days, about 1.97 points per month on a 30-day month. Over the whole build since 13 December 2023 the average is about 0.9 points per month; both figures are arithmetic, not a forecast, and are broken down in the pace analysis above.
The 14.87% figure for Volta by DAMAC appears in the Dubai REST register only as the previous inspection shown beside the 11 April 2026 reading of 20.79%, and no inspection date is attached to it. That supports a 5.92 point difference into April but not a monthly pace, so this page places 14.87% on the progress track without a month label and gives it no timeline row.
Volta by DAMAC, project 2782, has a registered completion date of 31 December 2027 in the DLD register, the same on 11 April 2026 and on 18 August 2026, while the stated handover is Q2 2028. Both dates are recorded here as given; with 70.74 points remaining after the 29.26% reading of 18 August 2026, this page's record is updated as each new inspection is recorded.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Volta construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.