DAMAC · Business Bay · Construction Update
Altitude de Grisogono Construction Update - March 2026
March 2026 Inspection Records Altitude de Grisogono at 26.12% Construction Progress in Business Bay
Piling and foundations are complete and the superstructure now rises above the podium, with envelope, MEP, and finishes recorded at early stages in March 2026.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Altitude de Grisogono Construction Snapshot
A 5.84 point rise to 26.12% puts Altitude de Grisogono in the superstructure band, the stage where the ground risk is behind the project and the visible measure of progress becomes how fast the frame climbs.
Altitude de Grisogono by DAMAC
2626
Active
26.12%
24 March 2026
08 August 2023
348 residential units
Q1 2028
Data source: RERA independent progress monitoring report for project 2626, inspection conducted on 24 March 2026, tracked against the DLD project register, where this development is registered as Canal Crown 2. The register holds a previous reading of 20.28% but publishes no inspection date against it, so no month is stated for it here. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: August 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Altitude de Grisogono Construction Progress Summary
The 24 March 2026 inspection records 26.12%, which is 5.84 points above the 20.28% the register still holds as the previous reading with no date attached to it. The gain itself is certified; the pace behind it is not, because the record gives nothing to measure it against. What the reading does describe precisely is a project that has finished with the ground and started building above it.
- Site mobilization and enabling works on plot 316
- Piling across the canal front footprint
- Foundation works beneath the three basement levels
- Super-substructure progressing at different stages across the tower
- Envelope works started at early stages
- MEP first fix started at early stages
- Internal and finishes work started at early stages
- Remaining frame to level 35, the mechanical floor and the roof
- Full facade closure and MEP commissioning across 348 units
- Building completion certification before the Q1 2028 handover window
Payment Linked Progress
What 26.12% Progress Means for Altitude de Grisogono Buyers
The plan on record here spreads the construction portion across monthly installments rather than a handful of large milestone payments, which means money keeps moving out through the superstructure years while only a quarter of the build is certified. At 26.12%, four actions matter most.
Verify the escrow account
Every installment belongs in the DLD regulated escrow account registered for project 2626, recorded with Abu Dhabi Islamic Bank as trust account bank in the March 2026 monitoring report. Altitude de Grisogono escrow account verification is the step before any transfer; the lookup takes about two minutes against the official DLD project record, searched under the registered name Canal Crown 2.
Reread your SPA payment schedule
Check what your sale and purchase agreement ties each installment to, and how a slow inspection cycle does or does not affect the dates you are committed to. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the certified milestones.
Confirm your Oqood interim registration
Two years ahead of the handover window, the interim register is the only public record of your position in project 2626. Confirm the Oqood entry exists in your name and that the unit reference on it matches your agreement exactly.
Track the remaining cycles
Several inspection readings separate this record from completion certification. The Altitude de Grisogono construction updates hub keeps each one dated and in sequence.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 26.12%?
Entering here buys certainty about the ground and keeps the payment runway: the foundations are certified, the frame is visibly rising, and roughly two thirds of the build still sits between this reading and the keys. Every payment goes to the DLD-registered escrow account for project 2626, released against certified construction progress.
- Enabling, piling and foundations recorded complete on 24 March 2026
- An inspection record already exists to read before committing
- 30% of the 70/30 plan still deferred to completion, with launch terms on record carrying a 4% DLD fee waiver
- Committed before any inspection reading exists
- Ground risk and frame risk both carried from day one
- The full installment runway, priced at launch levels
7 units listed available on the project page as of this update; availability shifts between cycles.
About the Development
Altitude de Grisogono Project Details

With foundations signed off and the frame rising, Altitude de Grisogono is an early superstructure development of 348 residences in one canal front tower of three basements, ground, three podium levels and 35 floors. Starting prices: AED 1.18M ≈ USD 321K.
Anyone buying in this cycle carries the frame, the facade and the fit out ahead of them, and in return keeps most of the purchase price unpaid until the Q1 2028 window arrives.
Site Context This Cycle
Explore Altitude de Grisogono Location on Dubai Map
Altitude de Grisogono occupies plot 316 on the Business Bay canal frontage, and the development is one vertical volume rather than a spread of buildings: three basements, ground, three podium levels, 35 floors, a mechanical floor and a roof. That format is why this cycle reads as it does, because with the substructure closed out almost every point of recorded progress from here comes from the frame climbing above podium level on a single tight footprint.
Business Bay itself is already finished around the site, with completed roads, a working canal promenade and live utilities, so the district will not be under construction alongside the tower; what buyers here are waiting on is the building, not its setting, which is the practical difference between this plot and an emerging district purchase sharing the same Q1 2028 horizon. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Altitude de Grisogono During Superstructure Progress
The superstructure band is where payment protection and residency planning are decided long before handover paperwork appears. Each resource below is matched to where Altitude de Grisogono stands right now.

Altitude de Grisogono Construction Updates
This page: the verified March 2026 inspection record for Altitude de Grisogono, from mobilization to superstructure.

Altitude de Grisogono Golden Visa: The Line Runs Through the Middle
DAMAC's Altitude de Grisogono in Business Bay: studios and 1 bedroom apartments sit below AED 2M, qualification starts at 2 bedrooms.
Read Altitude de Grisogono Golden Visa Guide
Altitude de Grisogono's Escrow Account on the Business Bay Canal
DAMAC's Altitude de Grisogono pays into Abu Dhabi Islamic Bank escrow, DLD project 2626, 351 units certified 26.12% in March 2026.
Verify Altitude de Grisogono Escrow AccountUpdate Timeline
Other Altitude de Grisogono Construction Updates
This March 2026 reading is the first inspection cycle published here, and every cycle recorded after it is filed on the hub, reading by reading.
Where This Update Fits
Explore Altitude de Grisogono Structure
This monthly report is one node in the wider record: the community that surrounds the site, the developer delivering it, and the listings competing with it.

Business Bay Properties for Sale
Browse canal-front apartments, penthouses and branded residences for sale across Business Bay.
See Business Bay Properties for Sale
Business Bay Community Overview
Read the Business Bay guide: canal-front towers, offices and residences minutes from Downtown, with prices and rental demand covered.
Explore the Business Bay Community
DAMAC Properties: Lagoon Communities, Golf Villas and Branded Collaborations
Founded in 2002, DAMAC has delivered 48,000 homes and is known for large-scale master communities, luxury residential projects and branded collaborations.
View the DAMAC Developer ProfileFAQs
Altitude de Grisogono Construction Progress in March 2026: Frequently Asked Questions
As of the RERA independent progress monitoring inspection conducted on 24 March 2026, the project stands at 26.12% construction progress in the DLD project register under project number 2626.
The register moves from a previous recorded reading of 20.28% to 26.12% on 24 March 2026, a gain of 5.84 points. That previous reading carries no published inspection date in the register, so the time elapsed behind the gain cannot be stated from the record and is not estimated here.
The 24 March 2026 monitoring report records mobilization ongoing, with enabling, piling and foundation works completed. Super-substructure work was progressing at different stages, while internal, MEP, envelope and finishes work had begun at early stages.
The handover window on record for this project is Q1 2028. Completion timing in the DLD register can be revised between inspection cycles, so the window is stated as it stood at the 24 March 2026 reading, and any revision would appear in a later update. Each recorded cycle is listed on the Altitude de Grisogono construction updates hub.
The development is registered with the DLD as Canal Crown 2, project number 2626, with the developer recorded as One Quantem Real Estate Development L.L.C. Buyers checking the official register or the escrow account should search that registered name rather than the marketing name; plot 316 in Business Bay and the 3 basement, ground, 3 podium, 35 floor configuration identify the same tower.
The independent progress monitoring report dated 24 March 2026 records Abu Dhabi Islamic Bank as the trust account bank for project 2626. Installments paid under an off plan purchase belong in that DLD-registered escrow account, and the registered details should be read directly from the DLD record before each transfer.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the March 2026 inspection record for Altitude de Grisogono correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.