
Ellington · Al Jaddaf
Art Bay East by Ellington
Creek-Side Apartments in Al Jaddaf
Art Bay East by Ellington brings 99 studio to 3 bedroom apartments to the Al Jaddaf Waterfront beside Dubai Creek, with a podium pool deck, a rooftop arts club and prices from AED 913K ≈ USD 249K.
Direct advisor access. Every message answered personally, never by a call center.
Overview
Project Overview
Starting Price
AED 913K ≈ USD 249K
Handover Date
Q3 2026
Property Type
Studio & Apartments
Location
Al Jaddaf
Developer
Ellington
Availability
Limited

About
About Art Bay East
Art Bay is a two-building development by Ellington on the Al Jaddaf Waterfront, with an East and a West building, per the developer's documents. This page covers Art Bay East only: one building of 99 apartments, arranged by the developer as a ground floor, two parking levels, eight residential floors and a rooftop arts club. The mix runs from studios to three bedroom apartments.
My read is that the building's appeal rests on its setting more than its size. Al Jaddaf puts you between Dubai Creek, Business Bay and the airport, and Art Bay East sits on the creek side of that position, with an arts centre, a sculpture park and the waterside promenade close by. End users get a compact building with a full amenity floor and a rooftop club; investors get an entry point from AED 913K ≈ USD 249K and a plan that asks for 70% of the price during construction.
Construction is at an early stage, and the original Q3 2026 handover schedule has passed. Confirm the current expected handover date with Ellington, and check the completion date in your SPA, before committing; dated progress is tracked on the construction updates page linked below.
Insights
Project Insights for Art Bay East Buyers

Art Bay East Construction Updates: Enabling Works on the Al Jaddaf Waterfront
Track Art Bay East construction progress through dated DLD register readings, verified development milestones, and consistent updates across inspection cycles.
Art Bay East Construction Updates
Art Bay East Escrow: Commercial Bank of Dubai, DLD Project 2994
Art Bay East's escrow sits at Commercial Bank of Dubai under DLD project 2994, for 103 registered units, certified at 10.42%.
Art Bay East Escrow Account Guide
Art Bay East Golden Visa: The 2 and 3 Bedroom Apartments Qualify
Art Bay East clears the Golden Visa threshold with 2 and 3 bedroom apartments; studios and 1 bedrooms start below.
Art Bay East Golden Visa GuidePrices
Art Bay East Prices & Sizes
The price ladder at Art Bay East is easy to read: a studio entry at AED 913K ≈ USD 249K, 1 bedroom apartments from AED 1.65M ≈ USD 449K, then 2 and 3 bedroom apartments priced above the AED 2M ≈ USD 545K Golden Visa threshold. I see the 2 bedroom as the pivot unit here: it is the smallest layout that clears that threshold, and its size band is the widest in the building, so floor and layout choice matter more for it than for any other type.
Studio
AED 913K≈ USD 249K
430 sq ft (40 sq m)
1 Bedroom Apartments
AED 1.65M≈ USD 449K
862 to 959 sq ft (80 to 89 sq m)
2 Bedroom Apartments
AED 2.75M≈ USD 749K
1,211 to 1,692 sq ft (113 to 157 sq m)
3 Bedroom Apartments
AED 3.66M≈ USD 995K
2,135 to 2,147 sq ft (198 to 199 sq m)
Get latest availability for Art Bay East
Get Latest AvailabilityPayment
Art Bay East Payment Plan
At the time of booking
30 days after the reservation date
90 days after the reservation date
150 days after the reservation date
240 days after the reservation date
1st construction milestone
2nd construction milestone
3rd construction milestone
4th construction milestone
On completion
Ellington's published plan for Art Bay East splits 70/30: 70% during construction and 30% on completion. The detail worth noticing is that the front of the plan runs on the calendar, not the site: 50% of the price falls due within 240 days of your own reservation date, whatever stage the building has reached. The remaining construction-period instalments are tied by the developer to four stages of construction, and the 30% balance waits for completion. The schedule above is the developer's published plan; confirm the schedule and dates that apply to your unit in the SPA, including the timing of the completion payment, since the original Q3 2026 handover schedule has passed. With half the price due inside 240 days, the way you move funds deserves planning: my guide on how to pay for property in Dubai compares the payment methods international buyers actually use, from manager's cheques to international transfers. Request the exact payment schedule for your unit.
Why Me
Why Buy Art Bay East Through Tohid Fetrat
With a building at an early stage and a handover date that needs written confirmation, who handles the purchase matters as much as which apartment you pick: someone who reads the paperwork, follows the build and stays accountable from reservation to the keys.
Direct developer access to Ellington inventory and releases
One dedicated advisor from first enquiry to handover
Specialist in remote purchases for international and non-resident buyers
Independent monthly construction tracking against RERA inspection data
Personal replies on WhatsApp, never a call center or sales team
My advisory service costs you nothing. The commission is paid by the developer, and you pay the same official price as buying directly, with independent guidance included.
Structure
Explore Art Bay East Structure
Art Bay East is easiest to judge against three layers: the Al Jaddaf stock it will compete with on resale, the community its residents will live in every day, and the developer whose specification and delivery it depends on. Each guide below covers one layer.

Al Jaddaf: Binghatti Wraith and Amazonia Apartments on the Creek
Al Jaddaf, the creekside district on the Bur Dubai bank, lists apartments in Binghatti Wraith and Amazonia on 60/40 payment plans.
Al Jaddaf Properties for Sale
Al Jaddaf: A Creek-Side District With Two Green Line Metro Stations
Al Jaddaf sits on the Bur Dubai bank of the Creek, home to Jaddaf Waterfront and a growing branded-residence pipeline.
Al Jaddaf Community Guide
Ellington Properties: Design-Led Boutique Residences With Curated Interiors
Ellington Properties, founded in 2014, is a design-led developer of apartments, villas and waterfront homes, with 30 developments launched and delivered.
Ellington Developer ProfileFacts
Art Bay East | Key Project Facts
Ellington
Al Jaddaf, Dubai
99
Q3 2026
Rooftop Arts Club with a rooftop bar and viewing deck
Freehold, open to all nationalities
2 and 3 Bedroom Apartments priced above the AED 2M ≈ USD 545K Golden Visa threshold
Commercial Bank of Dubai (PSC)
Map
Explore Art Bay East Location on Dubai Map
Art Bay East by Ellington sits in Al Jaddaf, on the Dubai Creek side of the city between Business Bay, Dubai Festival City and Dubai International Airport. Through Tohid Fetrat's Dubai Investment Map, you can see exactly where the building stands and compare it with other off-plan projects across the city.
The developer's location guide puts Dubai International Airport about 6 minutes' drive away and Business Bay, Burj Khalifa and The Dubai Mall about 11 minutes, an airport-side position with Downtown still within a short drive.

Location
Art Bay East Location Within Al Jaddaf
Inside Al Jaddaf, Art Bay East belongs to the waterfront strip the developer places on the banks of Dubai Creek, within Dubai Culture Village, with the waterside promenade reached from the ground floor. Per the developer's location guide, Al Jaddaf Waterfront Park is about 1 minute's drive away, and Jameel Arts Centre and the Jaddaf Waterfront Sculpture Park about 2 minutes. For daily life that means a promenade and galleries on the doorstep; for resale, a creek-side address is usually the first filter buyers apply within a community like this one. The wider district picture is covered in my Al Jaddaf community guide.
Al Jaddaf, DubaiConnectivity
Connectivity from Art Bay East
Two links define how Art Bay East connects to the rest of Dubai: the airport and the metro. The developer's location guide puts Al Jaddaf Metro Station about 2 minutes' drive from the building and Dubai International Airport about 6 minutes, with Business Bay about 11 minutes and DIFC about 16. For frequent flyers and for tenants who commute by rail, that pairing is the practical case for the address. My Dubai Metro guide explains how the network shapes access across the city. The times below are the developer's approximate driving figures.
Approximate Driving Distances
- Al Jaddaf Metro Station02 minutes
- Dubai International Airport (DXB)06 minutes
- Business Bay11 minutes
- Burj Khalifa and The Dubai Mall11 minutes
- Dubai Creek Harbour15 minutes
- Dubai International Financial Centre (DIFC)16 minutes
- Mall of the Emirates20 minutes
- Palm Jumeirah27 minutes

Interiors
Interior Design at Art Bay East
Ellington's specification for Art Bay East is built around light and storage: full-height windows and balconies, open kitchens fitted with a quartz worktop and a full set of integrated appliances including a gas cooktop, glass-fronted wardrobes lit from within, and porcelain tiled floors. The detail I would point a family or a long-stay tenant to is the dedicated laundry room in every layout, which takes washing out of the kitchen and bathrooms. The renders are styled; what you buy is the fitted specification, not the furniture.

Amenities

Interior Amenities
- Fitness studio with functional training zones and a climbing pegboard wall
- Hot yoga studio with infrared heating and aerial stretching hammocks
- Female and male wellness corners with steam and sauna
- The Theatre with a concealed projector screen and a billiards table
- Culture lounge with pantry and dining
- Youth Hub indoor kids' play area
- Lobby lounge with a co-working desk hub and an elevated library
- Concierge and security desk

Exterior Amenities
- Leisure and lounge pool with a Baja shelf
- Kids' pool
- Sun loungers area
- Barbecue deck
- Rooftop Arts Club with a rooftop bar and viewing deck
- Arts and performances stage with sunken seating
- EV charging station and bicycle parking
- Access to the waterside promenade
Gallery
Art Bay East by Ellington Image Gallery
Every image below is a developer rendering of Art Bay East: the creek-side exterior and promenade, the rooftop arts club, the amenity floor and the apartment interiors. They show the intended design rather than the site today, so read them alongside the dated progress on the construction updates page.
































Want the full render set and floor plans?
Get Renders & Floor Plans on WhatsAppFAQs
Art Bay East Frequently Asked Questions
Art Bay East is a residential building of 99 apartments, from studios to three bedrooms, in Al Jaddaf, Dubai. It is the East building of the Art Bay development, which the developer's brochure describes as developed by Ellington with Dutco under the Dutco Ellington brand. The building comprises a ground floor, two parking levels, eight residential floors and a rooftop arts club, and it is under construction.
Art Bay East sits on the Al Jaddaf Waterfront, which the developer places on the banks of Dubai Creek within Dubai Culture Village, with access to the waterside promenade from the ground floor. The developer's location guide gives approximate drives of 1 minute to Al Jaddaf Waterfront Park, 2 minutes to Al Jaddaf Metro Station and Jameel Arts Centre, 6 minutes to Dubai International Airport (DXB), 11 minutes to Business Bay and to Burj Khalifa and The Dubai Mall, and 16 minutes to DIFC.
There are four apartment types. Studio: from AED 913K ≈ USD 249K, 430 sq ft (40 sq m). 1 Bedroom Apartments: from AED 1.65M ≈ USD 449K, 862 to 959 sq ft (80 to 89 sq m). 2 Bedroom Apartments: from AED 2.75M ≈ USD 749K, 1,211 to 1,692 sq ft (113 to 157 sq m). 3 Bedroom Apartments: from AED 3.66M ≈ USD 995K, 2,135 to 2,147 sq ft (198 to 199 sq m). Per the developer, studios and 1 and 2 bedroom apartments come with one parking space, and 3 bedroom apartments with two.
The developer's amenity plans for the East building place a leisure and lounge pool with a Baja shelf, a kids' pool, a sun loungers area, a barbecue deck, a culture lounge with pantry and dining, The Theatre, a fitness studio, a hot yoga studio, female and male wellness corners with steam and sauna, and the Youth Hub indoor kids' play area on the podium amenity level. The rooftop Arts Club adds a rooftop bar, a workshop corner, an outdoor lounge and viewing deck, sunken seating and an arts and performances stage. The ground and parking levels include an EV charging station, bicycle parking and access to the promenade.
According to the developer's materials and finishes schedule, kitchens are open in layout with a manufactured quartz countertop and integrated appliances: electric oven, gas cooktop, dishwasher, microwave and warming drawer. Bedrooms have glass-fronted wardrobes with integrated LED lighting, bathrooms have mirrored medicine cabinets, floors are porcelain tiled, cooling is VRF air conditioning, and apartments are pre-wired for high-speed internet. Apartments have full-height windows and balconies, and every layout includes a laundry room.
Art Bay East was originally scheduled for handover in Q3 2026, and that date has passed. The most recent inspection record shows the building at an early stage of construction, so buyers should confirm the current expected handover date with Ellington and check the completion date written into their SPA before committing. Dated register readings and inspection notes are tracked in the Art Bay East construction updates guide.
The developer's published plan is 70/30: 70% is paid during construction and 30% on completion. It opens with 20% at the time of booking, followed by 10% at 30 days, 10% at 90 days, 5% at 150 days and 5% at 240 days after the reservation date, so half the price falls due within 240 days of each buyer's own reservation. Four further 5% instalments are tied by the developer to construction milestones, and the final 30% is due on completion. The schedule and dates that apply to a specific unit are confirmed in the SPA.
The main addition is the 4% DLD registration fee, which is paid to the Dubai Land Department rather than into the project escrow account; under the developer's booking steps it is settled with the down payment before the SPA copies are issued. Owners also pay an annual service charge once the building is operating. The developer publishes an anticipated service charge rate, and the current rate should be confirmed with Ellington before committing.
Yes. Art Bay East is freehold, so apartments can be bought and owned outright by buyers of any nationality, whether or not they live in the UAE, with the purchase registered with the Dubai Land Department.
It depends on the apartment type. The property route to the 10 year UAE Golden Visa uses an investment threshold of AED 2M ≈ USD 545K. At Art Bay East, the 2 Bedroom Apartments (from AED 2.75M ≈ USD 749K) and 3 Bedroom Apartments (from AED 3.66M ≈ USD 995K) are priced above that threshold, while the Studio (from AED 913K ≈ USD 249K) and 1 Bedroom Apartments (from AED 1.65M ≈ USD 449K) are priced below it. Approval rests with the UAE authorities and is never automatic; the Art Bay East Golden Visa guide covers the off-plan rules in detail.
Off-plan payments for Art Bay East are made into the project's DLD-registered escrow account with Commercial Bank of Dubai, and the developer can draw on those funds only against construction progress, a framework regulated by the Dubai Land Department. The Art Bay East escrow account guide explains how the account works and how to check it.
Yes. Reservation, SPA signing, payments into the escrow account and DLD registration can all be completed from abroad, and I manage the remote purchase end to end with Ellington on your behalf. Each stage of a remote purchase is documented in my Dubai real estate guide library.
Next Steps
What Happens After You Message Me
Message Me on WhatsApp
Tell me the collection, layout, or budget you have in mind.
Receive Availability & Pricing
I personally send the current unit list, floor plans, pricing, and the exact payment schedule.
Reserve Your Residence
Secure your unit with an EOI, every payment protected through the project's DLD-registered escrow account. The full sequence from reservation to registration is mapped in my step by step Dubai buying guide.

Your Advisor
Tohid Fetrat
Working with international and non-resident investors worldwide. Message or call me directly: you will always reach me personally, never a call center or sales team.