Autograph Collection recorded 9.41% construction at its 06 June 2026 RERA inspection, an early-stage reading that establishes the baseline for these 50 DAMAC Hills villas.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Autograph Collection by DAMAC at DAMAC Hills at a Glance
Autograph Collection is DAMAC's 50-villa release inside the delivered DAMAC Hills master community, registered with the Dubai Land Department as project 3035 on plot 5055 in Al Hebiah Third. Construction started on 03 July 2024, and the reading published against that start so far is 9.41%, dated 06 June 2026. Because the 50 plots are scattered through existing clusters instead of forming one continuous site, that single percentage covers villas standing at visibly different stages, which is the first thing to understand about every figure on this page.
3035
Active
03 July 2024
50 villas
Q2 2027
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Autograph Collection by DAMAC at DAMAC Hills Construction Update Timeline
This record currently holds one dated inspection: 9.41% on 06 June 2026, a little over 23 months after the 03 July 2024 construction start. The same register entry references a previous reading of 3.77% with no inspection date published against it, so that figure is noted here for context only and is deliberately kept out of the track and the table below, where every plotted point has to carry its own date.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| June 2026 | 9.41% | 06 June 2026 | View the June 2026 update |
Pace Analysis
How Fast Autograph Collection by DAMAC at DAMAC Hills Has Been Built
Pace is normally read between two dated inspections. This project has one, so the two rates below are derived from the construction start and the registered completion date rather than measured between readings:
- 03 Jul 2024 start to the 06 Jun 2026 inspection, 0% to 9.41%About 0.4 points per month, derived
- 06 Jun 2026 to the 30 May 2027 registered completion, 9.41% to 100%About 7.7 points per month, schedule-implied
The distance between those two numbers is the whole story of this record right now. Twenty-three months producing 9.41% does not describe a stalled site: registration, mobilization, enabling works, substructure and community infrastructure all absorb calendar time without moving a percentage far, and villa construction books most of its progress later, once structures rise and finishing runs in parallel across dozens of plots at once. What the second rate says is that the remaining schedule leaves almost no room for a repeat of the first. For a buyer holding a villa here, and equally for an investor weighing an entry at this stage, the practical consequence is that the next published cycle carries more information than any later one will: a second dated reading turns this arithmetic into evidence. The undated 3.77% in the register confirms 5.64 points of movement into June 2026, but without a date attached it cannot become a rate, and it is not treated as one anywhere on this page.
Get the Next Inspection Figure First
Tell me you are tracking Autograph Collection by DAMAC at DAMAC Hills and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Autograph Collection by DAMAC at DAMAC Hills
A percentage only means something next to what it is delivering. The project guide covers what buyers on this page are tracking toward:

Autograph Collection by DAMAC at DAMAC Hills: 50 Signature Villas
Autograph Collection by DAMAC at DAMAC Hills holds 50 villas only, across 14 typologies from 4 to 7 ensuite bedrooms.
View the Autograph Collection by DAMAC at DAMAC Hills Project GuideConsidering an Early-Stage Entry?
Availability shifts between inspection cycles, and a 50-villa release drawn across 14 typologies runs out of specific prototypes and clusters long before it runs out of villas. If this record is what brought you here, the current list is worth checking now.
Ask About Remaining Availability on WhatsAppStage Record
Autograph Collection by DAMAC at DAMAC Hills Build Stages, Mapped to the Inspections
Each stage below is tied to the window it occupies in this project's own record, so the two stages already documented are separated clearly from the three that no published inspection has reached yet.
Registration and Construction Start
Project 3035 entered the DLD register on 25 June 2024 with an escrow account held at First Abu Dhabi Bank, and the main contract recorded its start on 03 July 2024.
Enabling, Foundations and Early Structure
The 06 June 2026 inspection found mobilization continuing, enabling and substructure work at differing stages plot by plot, first superstructure underway, and community infrastructure already advanced.
Superstructure Across 14 Typologies
The B+G+2, G+2 and G+1 villa forms rising to full height across all 50 plots. This is the phase where a villa project converts calendar time into recorded percentage points fastest.
Envelope, Services and Fit-Out
External finishes, mechanical, electrical and plumbing installation, and the marble, timber and metal interior specification that separates one Autograph typology from the next.
Landscaping, Commissioning and Handover
Private pools, gardens and driveways completed villa by villa, systems commissioned, and final certification against the 30 May 2027 completion date on the register.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Autograph Collection by DAMAC at DAMAC Hills's own record.
Buyer Position
Tracking Your Position at Autograph Collection by DAMAC at DAMAC Hills
This page is one of four project resources that together cover a Autograph Collection by DAMAC at DAMAC Hills purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Autograph Collection by DAMAC at DAMAC Hills Construction Updates
This page: the published inspection record for Autograph Collection, from the July 2024 construction start onward.

Autograph Collection by DAMAC at DAMAC Hills Golden Visa: Every Series Qualifies
Autograph Collection by DAMAC at DAMAC Hills is a freehold villa enclave where every series, 4 to 7 bedrooms, qualifies individually.
Read the Autograph Collection by DAMAC at DAMAC Hills Golden Visa Guide
Autograph Collection by DAMAC at DAMAC Hills: Signature Villa Escrow
Autograph Collection by DAMAC at DAMAC Hills, DLD project 3035, escrows with First Abu Dhabi Bank, 9.41% certified June 2026.
Verify the Autograph Collection by DAMAC at DAMAC Hills Escrow AccountApproaching Handover
Between 9.41% and Handover: What Autograph Collection by DAMAC at DAMAC Hills Buyers Should Do Now
At this point in a build there is no villa to walk through and nothing physical to verify, so the work that protects a position here is documentary. It is also time-sensitive in a way the site is not: registration and escrow obligations attach to payments as they fall due, and a gap left open now travels with the purchase all the way to handover.
First, read your installment dates against the account the regulator monitors, so every transfer lands where it should; the Autograph Collection escrow account page sets out how the check is done against project 3035.
Second, follow the record rather than the launch material. Each new figure is published here and covered in full in the June 2026 inspection report, which is where the pace between readings starts to become visible.
Third, if residency forms part of the reason for buying, settle eligibility while the build is early, since the Autograph Collection Golden Visa eligibility guide explains how the timing works against title deed issuance on an off-plan villa.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore DAMAC Hills Structure
A build record reads differently when the community around it was finished years earlier. These three pages cover the ground the villas are going into, the homes already trading there, and the developer building them:

DAMAC Hills Properties for Sale
Browse villas and townhouses for sale across DAMAC Hills, including golf-course residences and branded collections.
See DAMAC Hills Properties for Sale
DAMAC Hills: Villas, Townhouses and Apartments Around Trump International Golf Club
DAMAC Hills is a Dubailand community wrapping villas, townhouses and apartments around a championship golf course, with an active resale market.
Explore the DAMAC Hills Community
DAMAC Properties: Lagoon Communities, Golf Villas and Branded Collaborations
Founded in 2002, DAMAC has delivered 48,000 homes and is known for large-scale master communities, luxury residential projects and branded collaborations.
View the DAMAC Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Autograph Collection by DAMAC at DAMAC Hills Construction Updates Frequently Asked Questions
Autograph Collection holds active status on the DLD register as project 3035, and its most recent published reading is 9.41%, taken at the inspection of 06 June 2026, with enabling, foundation and substructure work running at differing stages from villa to villa. The record sits in the timeline above.
The 06 June 2026 inspection recorded 9.41%, which the register presents as a rise of 5.64 points on an earlier reading of 3.77%. That earlier figure carries no published inspection date, so the size of the movement is on the record while the period behind it is not. The write-up for the cycle is the June 2026 construction update.
The expected handover window is Q2 2027, consistent with the 30 May 2027 completion date carried against project 3035 on the DLD record. Measured from 9.41% on 06 June 2026, 90.59 percentage points remain, so the next few published readings are what will test that date.
Fifty independently designed villas make up the collection, spread across 14 typologies running from four to seven bedrooms, with the 4BR, 5BR, 6BR and 7BR series each drawn as separate prototypes. Layouts and prototype areas sit in the Autograph Collection project guide.
Project 3035 was entered on the register on 25 June 2024, and construction started on 03 July 2024. The first published inspection reading, 9.41% dated 06 June 2026, therefore falls a little over 23 months into the build.
Only one dated reading exists so far, so no measured rate between inspections can be quoted. Spread across the 23 months from the 03 July 2024 start to the 06 June 2026 inspection, 9.41% works out at roughly 0.4 points per month, a derived average rather than an observed velocity. Holding the registered completion date implies close to 7.7 points per month from here, and both figures are set out in the pace analysis above.
Plot 5055 in Al Hebiah Third carries the registration, while the villas themselves take individual positions inside DAMAC Hills clusters whose roads, retail and golf course are long finished. That is why the June 2026 inspection could describe community infrastructure as advanced while the villas stood at 9.41%. The wider masterplan is covered in the DAMAC Hills community guide.
At this stage the useful work is documentary rather than physical: matching the installment dates in the sale agreement against the escrow account registered for project 3035, confirming the Oqood interim registration that records a specific villa in the buyer name, and resolving residency questions well before a title deed exists. The mechanics are covered on the Autograph Collection escrow account guide and the Autograph Collection Golden Visa guide.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Autograph Collection by DAMAC at DAMAC Hills construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.