DAMAC Properties · DAMAC Islands 2 · Construction Update
Bahamas at DAMAC Islands 2 Construction Update - May 2026
DLD Register Moves Bahamas at DAMAC Islands 2 to 0.33% at the 14 May 2026 Inspection
Mobilization and early enabling works are under way on the Bahamas plot, and the DLD register reading moved from 0 to 0.33 percent on 14 May 2026.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Bahamas at DAMAC Islands 2 Construction Snapshot
A 0.33 point rise since the 24 November 2025 baseline takes Bahamas at DAMAC Islands 2 off zero for the first time, yet it remains at the very bottom of the enabling and foundations band, where the site is being prepared long before any home rises on it.
Bahamas at DAMAC Islands 2
4243
Active
0.33%
14 May 2026
02 May 2026
544 residential units
100,825.60 sq m
30 June 2030
Data source: Dubai Land Department project register, inspection dated 14 May 2026 showing 0.33% current progress against 0% at the previous inspection of 24 November 2025; the Independent Progress Monitoring Report of the same May date enters the Progress Status as Enabling Works - Progressing. Status, registration, construction start, and completion dates are shown as the register listed them in September 2026. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: September 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Bahamas at DAMAC Islands 2 Construction Progress Summary
Between the 24 November 2025 and 14 May 2026 inspections, 171 days apart, project 4243 moved from 0% to 0.33% in the DLD register. The monitoring report's Progress Status changed from N/A to Enabling Works - Progressing, and the register dates the construction start to 02 May 2026, twelve days before this visit, so the gain records a site being mobilized rather than any structure.
- Baseline inspection at 0% filed on 24 November 2025
- Project entry in the DLD register dated 27 November 2025
- Construction start recorded in the register for 02 May 2026
- Site mobilization, noted as ongoing at the 14 May 2026 visit
- Enabling works, described as progressing at an early stage
- Four inspection photographs filed with the May record
- Foundations and concrete structure for the G+1 and G+2 homes
- Blockwork across all 544 townhouses and villas
- Internal and external finishing packages
- Handover against the completion date registered for 30 June 2030
Payment Linked Progress
What 0.33% Progress Means for Bahamas at DAMAC Islands 2 Buyers
The Bahamas 1 launch plan counts its 47 instalments from each buyer's sale date, so the first recorded 0.33% moves no due date: the larger 3% instalments at months 8, 14, 20, and 26 arrive on the calendar however quickly enabling works advance. With the site now mobilized, four checks matter most.
Verify the escrow account
Now that work is on record at the site, each instalment should still reach only the DLD regulated escrow account for project 4243 held with First Abu Dhabi Bank P.J.S.C. Bahamas at DAMAC Islands 2 escrow account verification is the check before any transfer; the lookup takes about two minutes against the official DLD project record.
Match your SPA to the 3% months
Find the dates your sale and purchase agreement gives the four 3% instalments and how it words the 25% due on completion against 30 June 2030. Not sure how your instalment dates compare with a 0.33% reading? Send me your SPA schedule and I will map it against the dated register readings.
Keep a clean payment trail
File every receipt beside the escrow account details and your Oqood record for project 4243, so any later question about what was paid, when, and into which account can be settled from your own documents.
Measure the next reading against 0.33%
With two dated points on record, the size of the next step shows whether enabling works are gathering pace. Bahamas at DAMAC Islands 2 construction updates hub keeps each inspection side by side.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 0.33%?
Entering as enabling works begin keeps nearly the whole build, and the whole instalment runway, in front of you, with mobilization now on the record: 75% of the price falls due within 49 months of sale and 25% on completion. Every payment goes to the DLD-registered escrow account for project 4243, released against recorded construction progress.
- Mobilization and early enabling works noted at the 14 May 2026 inspection
- From AED 2.75M ≈ USD 749K, with 20% plus the 4% DLD registration fee at booking
- About four years and one month to the registered 30 June 2030 completion
- Structure and facades visible before you sign
- A wait for keys counted in months
- A shorter runway before the completion payment
15+ units listed available on the project page as of September 2026; availability shifts between cycles.
About the Development
Bahamas at DAMAC Islands 2 Project Details

By the May 2026 inspection, Bahamas at DAMAC Islands 2 had become an active site, with mobilization and early enabling works for 544 G+1 and G+2 homes: 4 and 5 bedroom townhouses and 6 bedroom luxury villas. Starting prices: AED 2.75M ≈ USD 749K.
For buyers entering at this stage, the trade off is a build that has only just begun against an instalment schedule that starts from your own sale date, with handover expected in June 2030 and completion registered for 30 June 2030 in the DLD record.
Bahamas at DAMAC Islands 2 Project GuideSite Context This Cycle
Explore Bahamas at DAMAC Islands 2 Location on Dubai Map
Plot 20208 in Al Yelayiss 1 carries the cluster numbered 01 on the DAMAC Islands 2 plan, and on 14 May 2026 the inspectors found mobilization under way there. On an open Dubailand plot of low rise homes, enabling works come before anything visible above ground, which helps explain how a site in active preparation can still read 0.33 percent in the register.
For buyers weighing end use or rental from 2030, the connections that matter are already in place: the Expo 2020 venue sits about 20 minutes away, Dubai Investment Park about 25 minutes, and Dubai International Airport about 40 minutes. What the registered 30 June 2030 date governs is the homes themselves. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Bahamas at DAMAC Islands 2 as Enabling Works Begin
With the first 0.33% on record, payment protection and residency planning still outweigh progress questions. Each resource below is matched to where the Bahamas cluster stood in May 2026.

Bahamas at DAMAC Islands 2 Construction Updates
This page: the 14 May 2026 register reading for Bahamas, moving from 0% to 0.33%.

Bahamas at DAMAC Islands 2 Golden Visa: Cluster 01, Three Tiers
Bahamas at DAMAC Islands 2, cluster 01 in Dubailand, qualifies at both townhouse tiers and the 6 bedroom luxury villa.
Read Bahamas at DAMAC Islands 2 Golden Visa Guide
Bahamas at DAMAC Islands 2 Escrow: 544 Units, One Account
Bahamas at DAMAC Islands 2, DLD project 4243, escrows 544 units at First Abu Dhabi Bank, certified 0.33% May 2026.
Verify Bahamas at DAMAC Islands 2 Escrow AccountUpdate Timeline
Other Bahamas at DAMAC Islands 2 Construction Updates
Two readings now make up the Bahamas record: the November 2025 baseline one step back and this May 2026 reading. Each later cycle joins them on the construction updates hub.
Where This Update Fits
Explore Bahamas at DAMAC Islands 2 Structure
This May 2026 reading sits inside a wider picture: the lagoon community around plot 20208, the developer behind it, and the competing homes buyers compare it with.

DAMAC Island 2 Properties for Sale
Explore DAMAC Islands 2 properties for sale: lagoon-front villas and townhouses with flexible payment plans and resort-style island living.
See DAMAC Island 2 Properties for Sale
DAMAC Island 2 Community Overview
Read the DAMAC Islands 2 guide: eight island-themed clusters of lagoon-front villas and townhouses, with masterplan and payment plans.
Explore the DAMAC Island 2 Community
DAMAC Properties: Lagoon Communities, Golf Villas and Branded Collaborations
Founded in 2002, DAMAC has delivered 48,000 homes and is known for large-scale master communities, luxury residential projects and branded collaborations.
View the DAMAC Developer ProfileFAQs
Bahamas at DAMAC Islands 2 Construction Progress in May 2026: Frequently Asked Questions
The Dubai Land Department project register shows 0.33% current progress for Bahamas at DAMAC Islands 2, project 4243, at the inspection dated 14 May 2026, against 0% at the previous inspection of 24 November 2025. That is a gain of 0.33 points and the first reading above zero for the cluster.
Not on the record so far. As listed in September 2026, the DLD register still shows expected completion for project 4243 on 30 June 2030, and the May 2026 reading was taken just twelve days after the registered construction start of 02 May 2026, too early for the pace of work to say much about the end date. Registered dates can be revised between cycles, and any change would be stated plainly in a later dated update; how completion dates are tracked over time is covered on the Bahamas at DAMAC Islands 2 construction updates hub.
The Progress Status moved from N/A on 24 November 2025 to Enabling Works - Progressing on 14 May 2026. The November note said no construction activity had started at site, while the May note records mobilization on going and enabling work progressing at an early stage, and the inspection photographs filed with the DLD record rose from two to four.
Twelve days. The DLD register dates the construction start for project 4243 to 02 May 2026 and the inspection to 14 May 2026, which helps explain why the reading sits at 0.33% even though the inspectors already noted mobilization and early enabling works on site.
The readings are 171 days apart, and 0.33 points over that span works out to roughly 0.06 points a month. That figure is simple arithmetic on two dated readings, not a forecast: most of the interval came before the registered construction start of 02 May 2026, so it says little about how fast enabling works will move from here.
Almost all of it. The monitoring report describes 544 G+1 and G+2 townhouses and villas with a concrete structure, blockwork, and internal and external finishes, and as of 14 May 2026 the site was at the enabling stage, with 99.67 percentage points still to be recorded before the registered completion of 30 June 2030, about four years and one month later.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the May 2026 inspection record for Bahamas at DAMAC Islands 2 correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.