Berkeley Tower Construction Updates

The Register Record of an Office Tower on Sheikh Zayed Road

Berkeley Tower entered the DLD register at 0% after the 1 October 2026 RERA inspection, the baseline every later reading for this office tower builds on.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

0%Construction Progress
1 October 2026Latest RERA Inspection
109 officesTotal Units
Project 4417DLD Registration

Construction Snapshot

Berkeley Tower at a Glance

Berkeley Tower is Ellington Properties' office tower on Sheikh Zayed Road in Business Bay, planned as 109 offices across ground plus 60 floors in the developer's configuration. Its register entries sit within a few weeks of one another: construction start recorded as 28 September 2026, the 0% reading from the RERA inspection of 1 October 2026, and registration on 13 October 2026. Against a handover scheduled for Q4 2031, roughly five years out, the record is still measured in days, and the amenity floors 32 to 35 and robotic parking system are among what later readings will have to account for.

DLD Project Number

4417

Project Status

Active

Construction Start

28 September 2026

Total Units

109 offices

Total Built-Up Area

53,854.13 sq m

Registered Completion Date

31 December 2031 (DLD)

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

Berkeley Tower Construction Update Timeline

One dated reading makes up the Berkeley Tower record so far: 0% on the Dubai Land Department register after the RERA inspection of 1 October 2026, whose report found no construction activity on site and showed a progress status of N/A. The track below therefore carries a single dot with no earlier reading behind it, and the table holds one row; the October 2026 update it links is illustrated with a developer rendering of the planned tower, not a site photograph.

Inspection MonthConstruction ProgressInspection DateFull Update
October 20260%1 October 2026View the October 2026 update

Pace Analysis

How Fast Berkeley Tower Has Been Built

Pace needs two dated readings, and the Berkeley Tower record holds one: 0% on 1 October 2026. A measured velocity starts with the next register entry; until then the only figure available is arithmetic against the registered completion date:

  • Measured pace: one dated reading so far, 0% on 1 Oct 2026, so no inspection pair exists yetNot yet measurable
  • 1 Oct 2026 to 31 Dec 2031: 0% to 100% over 1,917 days to the registered date, arithmetic, not a forecastAbout 1.56 points per month

With one entry there is no curve to read, and a 0% figure taken at the opening of the record says where Berkeley Tower begins, not how quickly the ground plus 60 floor tower will rise. What gives the arithmetic line its use is the 70/30 payment plan sitting on top of it: the first of six construction-linked 5% instalments falls due on completion of 20% of the project construction, so the readings between the 1 October 2026 baseline and that 20% mark will matter more to a buyer here than any average. For an owner-occupier planning a move into their own floor, the first reading above zero is the one to watch. For an investor, the useful comparison arrives once two dated readings exist and a measured pace can be set against the 1.56-point line to 31 December 2031; until then, the record says only that the project is at its starting point.

Get the Next Inspection Figure First

Tell me you are tracking Berkeley Tower and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About Berkeley Tower at Business Bay

A register reading only matters in the context of what is being delivered. The full project guide covers the offices buyers are tracking toward on this page:

Berkeley Tower by Ellington Properties in Business Bay project rendering of a slender commercial tower among high rise buildings and a canal side skyline in Dubai - Presented by Tohid Fetrat

Berkeley Tower by Ellington: Freehold Offices on Sheikh Zayed Road

Berkeley Tower is an Ellington office tower of ground plus 60 floors, with 109 freehold offices up to full floors.

View the Berkeley Tower Project Guide

Considering a Pre-Construction Entry?

Availability at Berkeley Tower moves as each office format is taken up, and the choice of floors is widest at this pre-construction stage. If the record on this page is what brought you here, ask me for current availability before that choice narrows.

Ask About Remaining Availability on WhatsApp

Stage Record

Berkeley Tower Build Stages, Mapped to the Inspections

Only the first of the five stages below has a dated entry in the Berkeley Tower record so far; the rest are mapped to the payment-plan milestones and the Q4 2031 handover they lead to, and each will gain its inspection dates as register readings arrive.

Current PhaseSep to Oct 2026, 0% on 1 Oct 2026

Register Entry and Pre-Construction

Construction start recorded as 28 September 2026, the RERA inspection of 1 October 2026 finding no construction activity on site at a 0% register reading, and project 4417 registered on 13 October 2026.

First reading above 0%

Site Works Begin

No date is on record yet: the first Berkeley Tower register reading above the 0% of 1 October 2026 will mark when works on the ground plus 60 floor tower show up in the record.

20% to 70% of construction

Rising Through the Milestone Band

Six construction-linked 5% instalments fall due on completion of 20%, 30%, 40%, 50%, 60% and 70% of the project construction, so this is the band where readings and payments move together.

Above 70%

Enclosure, Amenity Floors and Fit-Out

The pleated, louvered facade closes in, the amenity floors 32 to 35 take shape and offices are fitted out; no Berkeley Tower reading sits in this band yet.

Toward Q4 2031

Commissioning and Handover

Double-deck lifts, robotic parking and building systems are commissioned before the Q4 2031 handover, against a registered completion date of 31 December 2031 and the final 30% due on completion.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Berkeley Tower's own record.

Buyer Position

Tracking Your Position at Berkeley Tower

This page is one of four project resources that together cover a Berkeley Tower purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Berkeley Tower by Ellington Properties in Business Bay construction updates cover image featuring a project rendering of the tower beside nearby buildings at twilight in Dubai - Presented by Tohid Fetrat
You Are Here

Berkeley Tower Construction Updates

This page: every Berkeley Tower register reading for project 4417, tracked from 0% toward Q4 2031.

Berkeley Tower by Ellington Properties in Business Bay Golden Visa concept graphic showing a gold visa card over a nighttime rendering of the commercial tower in Dubai - Presented by Tohid Fetrat

Berkeley Tower Golden Visa: Three Office Tiers, One Rule to Confirm

Berkeley Tower, Ellington Properties' 109 Business Bay offices, sits above the threshold at every tier, subject to the ICP's rules.

Read the Berkeley Tower Golden Visa Guide
Berkeley Tower by Ellington Properties in Business Bay escrow account concept graphic featuring a shield and padlock beside a rendered commercial tower in Dubai - Presented by Tohid Fetrat

Berkeley Tower Escrow: Ellington's Business Bay Account at Commercial Bank of Dubai

Ellington Properties' Berkeley Tower is DLD project 4417, 109 units in Commercial Bank of Dubai escrow, 0% certified October 2026.

Verify the Berkeley Tower Escrow Account

Approaching Handover

Between 0% and Handover: What Berkeley Tower Buyers Should Do Now

At the 1 October 2026 reading of 0%, none of the six construction-linked instalments on the Berkeley Tower 70/30 plan has been triggered, and the next movement in the record will come from site works rather than paperwork. The time-linked side of the plan does not wait for the site: 5% instalments fall due 90, 180, 240 and 360 days after each buyer's own reservation date, so the three steps below belong before you commit, not after the first reading above zero.

First, confirm that every instalment goes to the trust account for project 4417 held with Commercial Bank of Dubai (PSC); the Berkeley Tower escrow account page shows how to check the account against the register.

Second, if a Golden Visa is part of the reason for buying, read the Berkeley Tower Golden Visa eligibility guide first: every office tier is priced above AED 2M, but whether a commercial office qualifies depends on the ICP's current rules.

Third, follow the record from its starting point: the Berkeley Tower October 2026 inspection update holds the baseline reading in full, and each new reading is added to the timeline on this page.

Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore Business Bay Structure

A register record is only half the picture; the other half is the district and developer around it. These three pages set the Berkeley Tower baseline of 1 October 2026 in its market, community and developer context:

Business Bay properties for sale featuring modern residential towers and premium Dubai skyline views Captured by Tohid Fetrat.

Business Bay Properties for Sale

Browse canal-front apartments, penthouses and branded residences for sale across Business Bay.

See Business Bay Properties for Sale
Business Bay skyline view featuring Opus Tower Bugatti Residences by Binghatti The Binary by Omniyat and Ahad Tower with modern high rise architecture and urban city streets captured by Tohid Fetrat.

Business Bay Community Overview

Read the Business Bay guide: canal-front towers, offices and residences minutes from Downtown, with prices and rental demand covered.

Explore the Business Bay Community
Exterior view of Ocean House by Ellington featuring sculptural architecture, curved balconies, lush landscaping, and luxury waterfront residences in Dubai. Presented by Tohid Fetrat.

Ellington Properties: Design-Led Boutique Residences With Curated Interiors

Ellington Properties, founded in 2014, is a design-led developer of apartments, villas and waterfront homes, with 30 developments launched and delivered.

View the Ellington Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

Berkeley Tower Construction Updates Frequently Asked Questions

Berkeley Tower is an active Dubai Land Department project, number 4417, at the pre-construction stage, with a register reading of 0% from the RERA inspection of 1 October 2026. The inspection report itself prints no percentage and shows a progress status of N/A. Every reading on record is listed in the Berkeley Tower inspection timeline above.

The RERA inspection of 1 October 2026 is the first and only one on record for Berkeley Tower, and the Dubai Land Department register shows 0% against it. With no earlier reading there is no point change to report; the inspector found that no construction activity had started on site that day. The full record for that cycle is in the October 2026 construction update for Berkeley Tower.

Handover of Berkeley Tower is scheduled for Q4 2031, and the Dubai Land Department register carries a registered completion date of 31 December 2031 for project 4417. That date has not passed: at the 0% reading of 1 October 2026 it was 1,917 days away. This page's record is updated as each new inspection is recorded against it.

Berkeley Tower comprises 109 offices, the unit count shown on the Dubai Land Department register for project 4417 at the 1 October 2026 reading of 0%. They are offered in three priced formats, Compact Office Suites, Half-Floor Offices and Full-Floor Offices, within a tower the developer configures as ground plus 60 floors. Format details are in the Berkeley Tower project overview.

The Dubai Land Department register records the Berkeley Tower construction start as 28 September 2026. The first tracked reading, 0%, comes from the RERA inspection of 1 October 2026, and the project's registration date is 13 October 2026; all three dates are shown exactly as the register records them.

Progress at Berkeley Tower is tracked through the Dubai Land Department project register for project 4417, which records a percentage after each RERA inspection; the inspection report of 1 October 2026 prints no percentage of its own, so the 0% shown here is the register reading. Each new dated reading adds a row to the timeline and a dot to the track on this page, and the method applied across every tracked project is set out in the Dubai Construction Updates methodology.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the Berkeley Tower construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

WhatsApp +971543443597
Get the Latest Status