Binghatti · Al Jaddaf · Construction Update
Binghatti Moonlight Construction Update - June 2026
June 2026 Inspection Records Binghatti Moonlight at 19.24% in the DLD Register for Al Jaddaf
Structure, internal works, and MEP packages were progressing at Binghatti Moonlight when RERA inspected on 29 June 2026, with enabling and foundation works already completed.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Binghatti Moonlight Construction Snapshot
19.24% in the DLD register on 29 June 2026 places Binghatti Moonlight in the early build band, past its foundations and into the structure, the stage where registration and escrow checks carry more weight than handover planning.
Binghatti Moonlight by Binghatti
3722
Active
19.24%
29 June 2026
15 April 2025
236 residential units
25,746.46 sq m
Q2 2026
Data source: Dubai Land Department project register reading for project 3722 dated 29 June 2026, with inspection notes from RERA's Independent Progress Monitoring Report of the same date, which prints no percentage of its own. The image at the top of this page is a developer rendering of the planned tower, not a site photograph. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: October 2026, recording the 29 June 2026 reading; a newer reading may since have posted on Dubai REST.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Binghatti Moonlight Construction Progress Summary
The DLD register put Binghatti Moonlight at 19.24% on 29 June 2026, while the previous inspection field on the same record reads 0% with no date, so no dated monthly gain can be measured. Counted from the recorded construction start of 15 April 2025, the 440 days to this reading average about 1.31 points per month, arithmetic rather than a forecast.
- Enabling works across the Al Jaddaf site
- Foundation works, recorded as completed by RERA on 29 June 2026
- Structure for four basement levels, ground, three podium levels and 22 upper floors
- Internal works recorded as progressing at site
- MEP works: mechanical, electrical, and plumbing systems
- Remaining structure up to the mechanical floor and roof
- Glass facades and the illuminated open framework at the crown, per Binghatti's design
- Fit out of the 236 residences, the office floors, and the rooftop pool and gym
- Handover on a date still to be confirmed by Binghatti
Payment Linked Progress
What 19.24% Progress Means for Binghatti Moonlight Buyers
Binghatti Moonlight's plan is share based, 20% on booking, 50% during construction and 30% on handover, so a 19.24% reading falls inside the phase the construction share covers, and your SPA defines how that share is called. At this early stage of the tower, four actions matter most.
Verify the escrow account
Construction instalments should go only to the DLD regulated escrow account registered for project 3722 at Dubai Islamic Bank. Binghatti Moonlight escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Map the 50% construction share in your SPA
Check how your sale and purchase agreement calls the 50% construction share, and whether instalments already called would fall due at signing, then set them against the 19.24% reading. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Confirm your Oqood registration
An off plan purchase at Binghatti Moonlight is registered with the Dubai Land Department through Oqood under project 3722. Ask for your Oqood registration and check that your unit appears against the project before the construction share starts to be called.
Track each new reading
With 80.76 points left at the June 2026 reading and no confirmed completion date, each new register entry is the clearest timeline signal you have. The Binghatti Moonlight construction updates hub collects every reading as it posts.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 19.24%?
Entering while the tower is still rising trades certainty for runway: the 30% handover payment and any part of the construction share your SPA has not yet called still lie ahead, and the completion date needs confirming with Binghatti because the original Q2 2026 target has passed. Every payment goes to the DLD-registered escrow account for project 3722, released against recorded construction progress.
- Enabling and foundation works recorded as completed on 29 June 2026
- 30% of the 20/50/30 plan due on handover
- Handover date to be confirmed; the original Q2 2026 target has passed
- Construction risk carried from an empty plot
- The longest instalment runway, priced at launch levels
- A delivery date not yet tested by any site progress
6 units listed available on the project page as of this update; availability shifts between cycles.
About the Development
Binghatti Moonlight Project Details

With enabling and foundation works recorded as completed in June 2026, Binghatti Moonlight is an early stage mixed use tower in Al Jaddaf: 236 residences in 1, 2 and 3 bedroom layouts above office floors. Starting prices: AED 1.52M ≈ USD 414K.
The rendering shows Moonlight beside its sister building. Entering at 19.24% leaves the 30% handover payment and most of the build in front of you, and because the original Q2 2026 handover target has passed, the current completion date should be confirmed with Binghatti before you commit.
Binghatti Moonlight Project GuideSite Context This Cycle
Explore Binghatti Moonlight Location on Dubai Map
Binghatti Moonlight sits on a plot of 2,350.22 sq m (25,297.59 sq ft, per Binghatti's fact sheet) in Al Jaddaf, between historic Dubai Creek and Business Bay, and on a site of that size the four basement levels had to be excavated and founded before the tower could rise: the RERA notes of 29 June 2026 record that enabling and foundation stage as completed, with structural works progressing from there.
Al Jaddaf is an established creekside district close to Dubai Healthcare City and Zabeel Palace, and Binghatti's brochure places Business Bay and Dubai International Airport about 8 minutes away and Burj Khalifa about 10, so buyers following a 19.24% reading are watching one building take shape inside a working neighborhood rather than waiting on new infrastructure. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Binghatti Moonlight During Early Construction Progress
The early build band is where payment protection, registration, and residency planning are set up for the years of construction still to come. Each resource below is matched to where Binghatti Moonlight stands at 19.24%.

Binghatti Moonlight Construction Updates
This page: the 29 June 2026 DLD register reading and RERA inspection notes for Binghatti Moonlight.

Binghatti Moonlight Golden Visa: A Mixed-Use Tower in Al Jaddaf
Binghatti Moonlight, Binghatti's freehold Al Jaddaf tower, holds 236 residences over office and retail levels, under Oqood now.
Read Binghatti Moonlight Golden Visa Guide
Binghatti Moonlight Escrow: The Dubai Islamic Bank Account in Al Jaddaf
Binghatti Moonlight escrows 286 units at Dubai Islamic Bank, DLD project 3722, 19.24% certified at the June 2026 inspection.
Verify Binghatti Moonlight Escrow AccountUpdate Timeline
Other Binghatti Moonlight Construction Updates
This June 2026 page is the first monthly record for Binghatti Moonlight; later inspections will join it here, reading by reading, as the tower moves through each phase.
Where This Update Fits
Explore Binghatti Moonlight Structure
This monthly report is one node in the wider record: the Al Jaddaf community around the site, the developer building the tower, and the listings competing with it.

Al Jaddaf: Binghatti Wraith and Amazonia Apartments on the Creek
Al Jaddaf, the creekside district on the Bur Dubai bank, lists apartments in Binghatti Wraith and Amazonia on 60/40 payment plans.
See Al Jaddaf Properties for Sale
Al Jaddaf: A Creek-Side District With Two Green Line Metro Stations
Al Jaddaf sits on the Bur Dubai bank of the Creek, home to Jaddaf Waterfront and a growing branded-residence pipeline.
Explore the Al Jaddaf Community
Binghatti: Record Construction Speed and Branded Towers With Bugatti and Mercedes-Benz
Binghatti has delivered more than 60 projects since 2008, with 27 under development and two master communities across Dubai.
View the Binghatti Developer ProfileFAQs
Binghatti Moonlight Construction Progress in June 2026: Frequently Asked Questions
The Dubai Land Department project register recorded Binghatti Moonlight, project 3722, at 19.24% on 29 June 2026. RERA's Independent Progress Monitoring Report from the same visit prints no percentage of its own, so 19.24% is the register figure and the report supplies the inspection notes.
Yes. The registered completion date of 15 June 2026 had lapsed 14 days before the 29 June 2026 inspection, and the original Q2 2026 handover target ended one day after it, so both have passed with the register at 19.24%. Registered dates can be revised between cycles, but the DLD record used for this update shows no replacement date, so buyers should confirm the current expected completion date with Binghatti and on Dubai REST. How readings and completion dates are tracked over time is covered on the Binghatti Moonlight construction updates hub.
The RERA report of 29 June 2026 notes that enabling and foundation works were completed, and that structure, internal works and MEP works were progressing at site, with the progress status shown as Main Contract, Progressing. It describes the building as four basement levels, a ground floor, three podium levels and 22 upper floors, plus a mechanical floor and the roof.
It places Binghatti Moonlight in its early build stage: enabling and foundation works were complete and the tower structure was under way, with 80.76 points still to go before full completion on 29 June 2026. Under the 20/50/30 plan this falls inside the period covered by the 50% construction share, and how much of that share is called at this reading is set by each buyer's SPA.
The DLD inspection card dated 29 June 2026 lists 0% under Previous Inspection without a date, so the record does not show when that zero was logged. For that reason no month-on-month change is measured on this page; the only dated comparison is the recorded construction start of 15 April 2025, which gives a whole-build average of about 1.31 points per month to 29 June 2026, arithmetic rather than a forecast.
The DLD record lists construction as started on 15 April 2025 and the project as registered on 11 June 2025, so the recorded start precedes registration by 57 days. Both dates are printed here exactly as recorded, and 440 days separate the recorded start from the 29 June 2026 reading.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the June 2026 inspection record for Binghatti Moonlight correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.