Binghatti Starfall by Binghatti in Al Jaddaf construction updates cover image featuring a project rendering of the angular building beside a palm-lined street at sunset in Dubai - Presented by Tohid Fetrat

Binghatti · Al Jaddaf

Binghatti Starfall Construction Updates

A 19-Storey Al Jaddaf Tower, Tracked From Its First Register Reading

Binghatti Starfall stood at 0% on the DLD register at the 20 May 2026 inspection, the starting line for later readings of this 19-storey Al Jaddaf tower.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

0%Construction Progress
20 May 2026Latest RERA Inspection
754 residential unitsTotal Units
Project 4483DLD Registration

Construction Snapshot

Binghatti Starfall at a Glance

Binghatti Starfall is Binghatti's mixed-use tower of 754 residences above ground-floor retail in Al Jaddaf, entered on the Dubai Land Department register as project 4483 on 23 July 2026. Its record opens with a single 0% reading from the 20 May 2026 inspection, which comes before both that registration and the 01 July 2026 construction start the register lists; each date is shown here exactly as recorded. With a ground floor, four podium levels, 14 residential floors and a roof still to rise on the 5,630 sq m plot given in Binghatti's fact sheet, all 19 storeys lie between this baseline and handover.

DLD Project Number

4483

Project Status

Active

Construction Start

01 July 2026 (recorded on the register)

Total Units

754 residential units

Total Built-Up Area

38,059.03 sq m

Registered Completion Date

30 October 2027 (DLD)

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

Binghatti Starfall Construction Update Timeline

The Binghatti Starfall record holds one entry so far: 0% on the DLD register for the RERA inspection of 20 May 2026, when the report noted that no construction activities had been started. The register then lists a construction start of 01 July 2026 and registration on 23 July 2026, and gives 30 October 2027 as the registered completion date, while handover is expected in Q3 2028; those two dates come from different sources, so the contractual date is the one in your SPA. The single dot below marks that baseline, and the table row links the full May 2026 update.

Inspection MonthConstruction ProgressInspection DateFull Update
May 20260%20 May 2026View the May 2026 update

Pace Analysis

How Fast Binghatti Starfall Has Been Built

Pace is measured between two dated readings, and the Binghatti Starfall record so far holds exactly one. This is what that record supports today:

  • 20 May 2026: first and only DLD register reading0%
  • Dated reading pairs available for a pace figureNone yet

One reading cannot form a curve. With a single dated figure, 0% on 20 May 2026, this page publishes no points-per-month velocity for Binghatti Starfall and no arithmetic on the rate needed to reach the Q3 2028 expected handover. The first measured pace will come from the span between that baseline and the next dated reading on the register, which is also the first point at which the 01 July 2026 start recorded for project 4483 can be read against physical progress on the plot. Until then, the useful signal for an end user is simply whether the next reading moves off zero; for an investor holding through a 10/50/40 plan, it is how long the interval between 20 May 2026 and that next reading turns out to be.

Get the Next Inspection Figure First

Tell me you are tracking Binghatti Starfall and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About Binghatti Starfall at Al Jaddaf

A 0% reading says nothing about what is planned for the plot. The full project guide covers the 19-storey tower this record will follow from its baseline to handover:

Binghatti Starfall by Binghatti in Al Jaddaf project rendering of an illuminated angular residential building with palm trees and a landscaped street at night in Dubai - Presented by Tohid Fetrat

Binghatti Starfall: A 19-Storey Tower with Royal Suites

Binghatti Starfall is a tower in Al Jaddaf with 754 residences, studios to two bedroom Royal Suites, above 17 retail units.

View the Binghatti Starfall Project Guide

Considering a Pre-Construction Entry?

Availability at Binghatti Starfall shifts between releases, and buying at the 0% baseline means entering before any works appear on the record. If the record on this page is what brought you here, ask me for current availability before remaining inventory narrows further.

Ask About Remaining Availability on WhatsApp

Stage Record

Binghatti Starfall Build Stages, Mapped to the Inspections

With one reading on file, only the first stage below carries an inspection date; the other four follow the G + 4P + 14 residential floors + roof description in the 20 May 2026 RERA report and will be dated as Binghatti Starfall readings are posted.

Current Phase20 May 2026, 0% on the register

Registered Plot, Pre-Construction Baseline

The only inspection on record found no construction activities started and gave N/A as the RERA progress status, with project 4483 reading 0% on the register.

Start recorded 01 Jul 2026, no reading yet

Enabling Works and Foundations

The register records the construction start after the inspection; foundation work on the 5,630 sq m plot shows on this page only once a later reading is posted.

Awaiting dated readings

Ground Floor and Four Podium Levels

The double-height lobby, the retail frontage and four podium levels of parking and services form the base that every residential floor of the tower stands on.

Awaiting dated readings

14 Residential Floors, Roof and Facade

The floors that hold the 754 residences, the roof with its open-frame peak, and the gridded glass facade that encloses the 19-storey tower.

Toward the Q3 2028 expected handover

Fit-Out, Amenity Deck and Handover

Apartment finishing, the podium deck with its pools and observatory, and final inspections; the register lists 30 October 2027 as the registered completion date.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Binghatti Starfall's own record.

Buyer Position

Tracking Your Position at Binghatti Starfall

This page is one of four project resources that together cover a Binghatti Starfall purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Binghatti Starfall by Binghatti in Al Jaddaf construction updates cover image featuring a project rendering of the angular building beside a palm-lined street at sunset in Dubai - Presented by Tohid Fetrat
You Are Here

Binghatti Starfall Construction Updates

This page: the Starfall build record, reading by reading, opening at 0% on 20 May 2026.

Binghatti Starfall by Binghatti in Al Jaddaf Golden Visa concept graphic with a gold card over a rendering of an angular residential building and palm-lined street in Dubai - Presented by Tohid Fetrat

Binghatti Starfall Golden Visa: A Mixed-Use Al Jaddaf Tower

Binghatti Starfall is a freehold mixed-use Binghatti tower in Al Jaddaf, 754 residences rising over ground-floor retail, open to all nationalities.

Read the Binghatti Starfall Golden Visa Guide
Binghatti Starfall by Binghatti in Al Jaddaf escrow account concept graphic with a shield and padlock over a night rendering of a lit residential building in Dubai - Presented by Tohid Fetrat

Binghatti Starfall: The 771-Unit Escrow at United Arab Bank

United Arab Bank holds Binghatti Starfall escrow as DLD project 4483 for 771 units, certified 0% in May 2026.

Verify the Binghatti Starfall Escrow Account

Approaching Handover

Between 0% and Handover: What Binghatti Starfall Buyers Should Do Now

At 0% on 20 May 2026, nothing on the Binghatti Starfall plot can yet be measured, so the decisions that matter now concern where your money goes and what your unit can support rather than how the building is progressing. For anyone buying now, the 10% first payment is made before any reading has shown work on the plot, which is why the three steps below belong before money moves, not after the next update.

First, make sure every instalment, from that 10% through the 50% construction share, goes only into the escrow account registered for project 4483; the Binghatti Starfall escrow account page shows how to check the United Arab Bank account on Dubai REST.

Second, if residency is part of your plan, settle eligibility before you choose a tier: the Binghatti Starfall Golden Visa eligibility guide explains which units reach the AED 2M ≈ USD 545K property value and which do not.

Third, read the full Binghatti Starfall project guide for the four tiers and the 10/50/40 plan, so you know how much of the price falls due during the build this page tracks.

Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore Al Jaddaf Structure

A 0% record gains meaning from what already stands around the plot. These three pages set Binghatti Starfall against the Al Jaddaf market, its community, and the developer building it:

View of Al Jaddaf properties for sale in Dubai showing waterfront residences, palm lined walkways and canal side living, Presented by Tohid Fetrat

Al Jaddaf: Binghatti Wraith and Amazonia Apartments on the Creek

Al Jaddaf, the creekside district on the Bur Dubai bank, lists apartments in Binghatti Wraith and Amazonia on 60/40 payment plans.

See Al Jaddaf Properties for Sale
View of Al Jaddaf community in Dubai showing modern waterfront residences, landscaped walkways and canal side surroundings, Presented by Tohid Fetrat

Al Jaddaf: A Creek-Side District With Two Green Line Metro Stations

Al Jaddaf sits on the Bur Dubai bank of the Creek, home to Jaddaf Waterfront and a growing branded-residence pipeline.

Explore the Al Jaddaf Community
Binghatti luxury towers in Dubai – Bugatti Residences, Mercedes-Benz Places, and Skyblade by Binghatti, representing iconic branded architecture and innovation, presented by Tohid Fetrat.

Binghatti: Record Construction Speed and Branded Towers With Bugatti and Mercedes-Benz

Binghatti has delivered more than 60 projects since 2008, with 27 under development and two master communities across Dubai.

View the Binghatti Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

Binghatti Starfall Construction Updates Frequently Asked Questions

Binghatti Starfall is an active Dubai Land Department project, number 4483, at the pre-construction stage: the register shows 0% at the inspection of 20 May 2026, the only reading on record when this page was prepared on 24 October 2026. Every dated reading is listed in the inspection timeline above.

The Binghatti Starfall timeline holds one inspection, dated 20 May 2026 at 0% on the DLD register, with no earlier reading, so there is no point change to report. The register lists three further dates for project 4483: a construction start recorded on 01 July 2026, registration on 23 July 2026 and a registered completion date of 30 October 2027.

Binghatti Starfall progress is tracked from the Dubai Land Department project register for project 4483 on Dubai REST, read alongside each RERA Independent Progress Monitoring Report. The 20 May 2026 report gives N/A for RERA progress status, so the 0% figure on this page is the register reading. Each new dated reading is added here with its own monthly update, and the method used across the site is set out on the Dubai Construction Updates tracking method page.

A pace figure needs two dated readings, and Binghatti Starfall has one: 0% on 20 May 2026. With no second reading, this page publishes no points-per-month rate and no arithmetic on the rate needed to reach the Q3 2028 expected handover; the first measured pace will cover the span from that baseline to the next dated reading on the register, as set out in the pace analysis.

Two dates from different sources apply to Binghatti Starfall: handover is expected in Q3 2028, and the Dubai Land Department register lists 30 October 2027 as the registered completion date for project 4483, a date still in the future when this page was prepared on 24 October 2026. The contractual date for each unit is the one written into its Sale and Purchase Agreement.

Binghatti Starfall is planned as a 19-storey mixed-use tower holding 754 residences, arranged as a ground floor, four podium levels, 14 residential floors and a roof, the configuration the 20 May 2026 RERA report records as G + 4P + 14 residential floors + roof. The developer fact sheet separately lists 17 ground-floor retail units on a 5,630 sq m (60,602 sq ft) plot.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the Binghatti Starfall construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.