Burj Binghatti Jacob & Co Residences Construction Update - December 2025
December 2025 Inspection Records Burj Binghatti Jacob & Co Residences at 34.56% Construction Progress in Business Bay
Superstructure, MEP first fix, and early finishing packages now define site activity at the Business Bay hypertower, verified at 34.56 percent in the December 2025 RERA inspection.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Burj Binghatti Jacob & Co Residences Construction Snapshot
An 11.52 point rise over the previous recorded reading puts this tower in the superstructure band, the stage where the building gains height fastest and where the register carries no date against that earlier figure, only its value.
Burj Binghatti Jacob & Co Residences
2480
Active
34.56%
22 December 2025
01 October 2022
325 residences
105,253.21 sq m
Q2 2027
Data source: RERA inspection conducted on 22 December 2025, tracked against DLD inspection records for project 2480. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: August 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Burj Binghatti Jacob & Co Residences Construction Progress Summary
The 22 December 2025 inspection recorded 34.56%, against a previous register entry of 23.04% that carries no inspection date of its own. The 11.52 point difference is therefore documented in size but not in duration, and it lands on a build that has finished its substructure and is now climbing: seven basement levels, podium, and mechanical floors sit below a tower still gaining floors.
- Site mobilization on plot 106 in Business Bay
- Enabling and foundation works
- Substructure across the seven basement levels
- Superstructure rising through the tower floor sequence
- MEP works: mechanical, electrical, and plumbing installation
- Internal and external finishing on completed levels
- Main contract recorded as progressing at inspection
- Remaining superstructure to the mechanical floors and crown
- Facade installation across the full tower height
- Building completion certificate procedures
- Handover from the Q2 2027 window
Payment Linked Progress
What 34.56% Progress Means for Burj Binghatti Buyers
This tower is unusual among Business Bay off plan projects: its published schedule is tied to calendar dates rather than to construction milestones, so a reading of 34.56% does not release an installment by itself. It tells you something more useful instead: how much building stands behind the dates already fixed in your contract, which as of December 2025 is a little over a third of it. Four actions follow from that.
Verify the escrow account
Money moving on fixed dates rather than certified milestones needs exactly the same protection, and here the first of those dates is September 2026. Project 2480 holds its trust account with Sharjah Islamic Bank per the December 2025 monitoring report, and no funds should reach the developer outside it. Burj Binghatti Jacob & Co Residences escrow account verification sets out the check, which takes about two minutes against the official DLD project record.
Read your schedule against the build
The published plan starts monthly installments in September 2026, at a point when the tower will still be in superstructure and facade work rather than finishing. Not sure how your payment dates line up with this reading? Send me your payment schedule and I will map it against the recorded construction position cycle by cycle.
Confirm Oqood interim registration
An off plan purchase is recorded in the DLD interim property register, and that registration is what evidences your interest in the unit long before a title deed exists. Ask for written confirmation that it has been filed against project 2480 rather than assuming it happened at booking.
Track the remaining cycles
With 65.44 points still to record, several inspection cycles remain before completion certification. Burj Binghatti Jacob & Co Residences construction updates hub keeps every reading in one timeline.
General framework, not legal advice: installment dates, registration obligations, and fee responsibilities are set by your individual sale and purchase agreement and the DLD record, and both should be read directly.
Buying at 34.56%?
Entering mid superstructure is a different proposition to entering at launch: the foundation risk is already behind the project, the tower is visibly above ground, and the first monthly installment does not fall due until September 2026. Every payment goes to the DLD-registered escrow account for project 2480, released against certified construction progress.
- Substructure and seven basement levels already certified complete
- Roughly eighteen months to the stated Q2 2027 window
- Monthly installments begin September 2026, not on signing
- Construction risk carried from excavation through to handover
- Two to four years of waiting is the usual delivery horizon
- Longer installment runway, priced at launch levels
More than twenty residences listed available with the developer as of this update; availability shifts between cycles.
About the Development
Burj Binghatti Jacob & Co Residences Project Details

With substructure certified and the superstructure climbing, this is a mid build hypertower of 325 residences, sized from quarter floor villas up to full floor sky penthouses across 105,253.21 sq m of built area. Starting prices: AED 8.20M ≈ USD 2.23M.
Entering at this stage means the ground risk is already recorded as complete, while the remaining 65.44 points and the Q2 2027 window still sit ahead of you rather than behind.
Site Context This Cycle
Explore Burj Binghatti Jacob & Co Residences Location on Dubai Map
Plot 106 sits on the Downtown facing side of Business Bay, a compact urban parcel hemmed in by existing towers and live road network, which is exactly why this cycle's progress reads the way it does: on a constrained site the only direction available is up, so almost all recorded movement between readings comes from floor plate cycles rather than from spreading works across a wide plot.
That density cuts both ways for buyers watching the December 2025 position. Business Bay already has its roads, canal promenade, metro connection, and utilities in place, so nothing external is waiting to be built before this tower can be occupied, and the remaining 65.44 points are almost entirely a question of the building itself. See the tower's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Burj Binghatti During Superstructure Progress
The superstructure band is where payment protection and residency planning matter most, because the money starts moving well before the building is finished. Each resource below is matched to where this tower stands right now.

Burj Binghatti Construction Updates
This page: the verified December 2025 inspection record for Burj Binghatti, from mobilization to rising superstructure.

Burj Binghatti Jacob & Co Residences Golden Visa at Every Level
From the 2 bedroom Emerald Villa, every released tier of Burj Binghatti Jacob & Co Residences in Business Bay qualifies alone.
Read Burj Binghatti Golden Visa Guide
Burj Binghatti Jacob & Co Residences: The Hypertower's Escrow Account
Sharjah Islamic Bank keeps Burj Binghatti Jacob & Co Residences escrow, DLD project 2480, 325 units, 34.56% certified December 2025.
Verify Burj Binghatti Escrow AccountUpdate Timeline
Other Burj Binghatti Jacob & Co Residences Construction Updates
This is the first inspection record published for the tower on this cluster. Every cycle after it joins the same timeline, so the run from 34.56% to certification stays readable in one place.
Where This Update Fits
The Wider Picture
Reading one inspection cycle in isolation tells you less than reading it against its surroundings: the district holding plot 106, the developer's other Dubai towers, and the resale stock any future exit would compete with.

Business Bay Properties for Sale
Browse canal-front apartments, penthouses and branded residences for sale across Business Bay.
See Business Bay Properties for Sale
Business Bay Community Overview
Read the Business Bay guide: canal-front towers, offices and residences minutes from Downtown, with prices and rental demand covered.
Explore the Business Bay Community
Binghatti: Record Construction Speed and Branded Towers With Bugatti and Mercedes-Benz
Binghatti has delivered more than 60 projects since 2008, with 27 under development and two master communities across Dubai.
View the Binghatti Developer ProfileFAQs
Burj Binghatti Jacob & Co Residences Construction Progress in December 2025: Frequently Asked Questions
As of the RERA inspection conducted on 22 December 2025, Burj Binghatti Jacob & Co Residences stands at 34.56% construction progress in the DLD project register for project 2480.
The register moved the project from 23.04% to 34.56%, a gain of 11.52 points. The 23.04% entry is published without an inspection date of its own, so the record documents the size of the gain but not the period it covers.
The 22 December 2025 inspection recorded mobilization complete and enabling, foundation, and substructure works finished, with superstructure, finishing, and MEP works all running concurrently. Progress status was logged as main contract progressing.
The December 2025 record leaves 65.44 percentage points between the 22 December 2025 reading and full certification, roughly eighteen months ahead of the stated Q2 2027 window, and shows no revision to that window as of this update. How inspection cycles run across a full build is covered on the Burj Binghatti Jacob & Co Residences construction updates hub.
Yes. Handover expectations for project 2480 are revised between inspection cycles when the register is updated. What is printed here is the position carried in the record at the December 2025 reading, and a later cycle would carry any change.
The 22 December 2025 independent progress monitoring report names Sharjah Islamic Bank as the trust account bank for project 2480, developer number 1051. The account details themselves should be read directly from the project 2480 record before any transfer is made.
The published schedule for this tower is calendar linked rather than milestone linked. After the booking stage, 30% falls due at 6% per month from September 2026 and 20% at 5% per month from February 2027, which means those dates arrive while superstructure and facade packages are still running rather than after a certified percentage is reached.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the December 2025 inspection record for Burj Binghatti Jacob & Co Residences correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.