DAMAC · Business Bay · Construction Update
Canal Heights Construction Update - April 2026
April 2026 Inspection Records Canal Heights at 31.22% Construction Progress in Business Bay
Structure work is advancing while envelope, MEP, and finishing packages open at Canal Heights, verified at 31.22 percent in the RERA cycle inspected on 22 April 2026.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Canal Heights Construction Snapshot
A 7.61 point rise from the previous recorded reading of 23.61% puts Canal Heights at 31.22%, inside the superstructure band where a tower is still being built rather than fitted out. The register holds that earlier figure without an inspection date, so the gain is stated here without being tied to a month.
Canal Heights by DAMAC
2602
Active
31.22%
22 April 2026
25 May 2023
411 residential units
28,767.36 sq m
Q2 2027
Data source: RERA inspection conducted on 22 April 2026, tracked against DLD inspection records for project 2602. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: August 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Canal Heights Construction Progress Summary
The 22 April 2026 inspection puts Canal Heights at 31.22%, 7.61 points above the previous recorded figure of 23.61%, which the register carries without a date of its own. The inspection notes place the concrete frame at an advanced stage while envelope, internal, finishing, and MEP packages have all opened but remain early, which is the signature of a tower still gaining height rather than one being completed.
- Enabling works on the Business Bay canal front plot
- Piling across the three basement footprint
- Foundation works beneath the residential tower
- Structure works recorded at an advanced stage
- Envelope packages at an early stage of installation
- Internal works and finishes at an early stage
- Mechanical, electrical, and plumbing works opened on site
- Remaining frame to the mechanical level and roof
- Envelope, finishes, and MEP scaled across every floor
- Further RERA inspection cycles toward 100%
- Building completion certificate and Q2 2027 handover
Payment Linked Progress
What 31.22% Progress Means for Canal Heights Buyers
On this project the registered schedule counts installments in months from the sale date rather than against individual construction milestones, so a reading of 31.22% does not by itself trigger a payment. What it does tell you is whether the build is keeping pace with money you are already committed to. Four checks matter at this point in the schedule.
Verify the escrow account
Every installment ahead of handover should reach only the DLD regulated escrow account registered for project 2602, named in the April 2026 record as an Emirates NBD trust account. Canal Heights escrow account verification confirms the account details you are about to transfer into, and the check runs in about two minutes against the official DLD project record.
Map your installment dates against the build
Read how your sale and purchase agreement sequences the quarterly installments and where the completion payment sits, then set those dates beside the Q2 2027 window rather than beside a percentage. Not sure which installments are still ahead of you? Send me your SPA schedule and I will map it against the certified inspection record.
Confirm your Oqood registration
Interim registration records an off plan purchase against project 2602 in the DLD system years before a title deed exists. Ask for the Oqood certificate and check that the unit reference, floor, and buyer details match the sale and purchase agreement exactly.
Track the readings to Q2 2027
Several inspection cycles separate 31.22% from a finished building, and the spacing between those readings is the earliest signal that a timeline is moving. The Canal Heights construction updates hub keeps every published reading dated and in one place.
General framework, not legal advice: installment dates, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 31.22%?
Entering roughly a third of the way through trades delivery certainty for runway: foundations and structure are certified rather than promised, while most of the purchase price still sits ahead of you across the remaining schedule. Every payment goes to the DLD-registered escrow account for project 2602, released against certified construction progress.
- Enabling, piling, and foundation works already certified complete
- Structure recorded at an advanced stage in April 2026
- Roughly a year of building ahead to the Q2 2027 window
- 20% of the price falls due only on completion
- Construction risk carried from excavation onward
- No published inspection history to read before committing
- Two to four years between booking and keys is the usual horizon
3 units listed available on the project page as of this update; availability shifts between cycles.
About the Development
Canal Heights Project Details

The inspection record describes project 2602 as a residential building of three basements, ground, three podium levels, 42 floors, and a mechanical level, with retail at street level and 411 residences above. Starting prices: AED 1.255M ≈ USD 342K.
A buyer joining now inherits what is left of the build rather than all of it, keeps the original schedule, and waits on the Q2 2027 window with the final fifth of the price still unpaid.
Site Context This Cycle
Explore Canal Heights Location on Dubai Map
Canal Heights occupies plot 358 on the Business Bay canal front, a waterfront parcel whose shape governs the order of works in this cycle: three basement levels had to be piled and cast before any height could be gained, which is why the record shows foundations closed out while the frame is still climbing. Envelope and finishing packages are opening on a footprint bounded by the promenade on one side and the district road network on the other.
Business Bay around the site is already finished, with the canal promenade, retail, and utilities long in service, so a buyer here is weighing the delivery of one building rather than the maturity of a district, and that distinction is what the stretch between this reading and the Q2 2027 window is really about. Place the tower against the rest of the city on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Canal Heights While the Structure Rises
In the superstructure band, payment protection and residency planning carry more weight than delivery preparation. Each resource below is matched to where Canal Heights stands right now.

Canal Heights Construction Updates
This page: what the April 2026 RERA reading records at Canal Heights, and why it matters.

Canal Heights Golden Visa: Only the Two Bedroom Tier Qualifies
At DAMAC's Canal Heights only the 2 bedroom apartment clears AED 2M alone; studio and 1 bedroom buyers need combining.
Read the Canal Heights Golden Visa Guide
Canal Heights Escrow: DAMAC's Twin Canal Towers at Emirates NBD
Canal Heights, DAMAC's twin Business Bay towers, holds escrow at Emirates NBD under DLD project 2602, certified 31.22% in April 2026.
Verify the Canal Heights Escrow AccountUpdate Timeline
Other Canal Heights Construction Updates
April 2026 opens the published record for this tower. Every later reading joins the same timeline, so the pace between cycles stays visible rather than being recalled from memory.
Where This Update Fits
Explore Canal Heights Structure
This reading is one node in a wider record: the district holding the plot, the developer building on it, and the stock competing with it for a buyer.

Business Bay Properties for Sale
Browse canal-front apartments, penthouses and branded residences for sale across Business Bay.
See Business Bay Properties for Sale
Business Bay Community Overview
Read the Business Bay guide: canal-front towers, offices and residences minutes from Downtown, with prices and rental demand covered.
Explore the Business Bay Community
DAMAC Properties: Lagoon Communities, Golf Villas and Branded Collaborations
Founded in 2002, DAMAC has delivered 48,000 homes and is known for large-scale master communities, luxury residential projects and branded collaborations.
View the DAMAC Developer ProfileFAQs
Canal Heights Construction Progress in April 2026: Frequently Asked Questions
The DLD project register records 31.22% construction progress for project 2602, taken from the RERA inspection carried out on 22 April 2026.
The register moves from a previous recorded reading of 23.61% to 31.22% on 22 April 2026, a gain of 7.61 points. That earlier reading is held in the register without an inspection date, so the gain is reported here without being attributed to a specific month or interval.
Handover is expected within the Q2 2027 window. With 68.78 percentage points still separating the 22 April 2026 reading from a completed building, the pace across the next few readings is what tells you whether that window is holding. Each cycle is dated and published on the Canal Heights construction updates hub.
The 22 April 2026 inspection notes record enabling, piling, and foundation works as complete, structure work progressing at an advanced stage, and internal, envelope, finishing, and MEP works all opened but progressing at early stages, with site mobilization still ongoing.
The April 2026 inspection record lists Vesta Real Estate Development L.L.C, developer number 1552, as the registered developer of project 2602 on plot 358 in Business Bay. Canal Heights is marketed under the DAMAC name and was designed in collaboration with the Geneva jeweller de GRISOGONO.
The April 2026 inspection record names Emirates NBD Bank (P.J.S.C) as the trust account bank for project 2602. Installments on an off plan purchase are paid into that DLD regulated account rather than to the developer directly, and the account number should be checked against the DLD project record before every transfer.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the April 2026 inspection record for Canal Heights correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.