July 2026 DLD Register Reading Lifts Cavalli Tower to 85.08% Construction Progress in Dubai Media City
External works have joined the envelope, MEP and interior finishing packages at Cavalli Tower, recorded at 85.08 percent in the DLD register on 15 July 2026.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Cavalli Tower Construction Snapshot
An 11.59 point rise in 113 days since the 24 March 2026 reading takes Cavalli Tower past 85%, and for the first time in this series two dated readings allow the pace to be measured: about 3.08 points a month, arithmetic, not a forecast.
Cavalli Tower by DAMAC
2283
Active
85.08%
15 July 2026
30 November 2021
438 residential units
78,976.92 sq m
Q2 2027
Data source: DLD project register reading dated 15 July 2026 for project 2283, registered as Cavalli Casa Tower, read with the RERA Independent Progress Monitoring Report of the same date. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. The header image is a project rendering of the planned tower, not a site photograph. Last updated: September 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Cavalli Tower Construction Progress Summary
Between the 24 March and 15 July 2026 inspections, the DLD register moved Cavalli Tower from 73.49% to 85.08%. The July RERA report records the enabling, foundation and structure works as substantially completed and, new in this cycle's notes, lists external works progressing on site, so the work now reaches from the ground around the tower to the apartment interiors.
- Enabling and foundation packages, substantially completed per the July report
- Concrete structure of the 70-storey tower, substantially completed
- Structure of the six parking levels beneath the residences
- External envelope at an advanced stage
- Mechanical, electrical and plumbing installations
- Internal works and internal finishes across the 438 residences
- External works, newly listed as progressing on site
- Further RERA inspection cycles across the last 14.92 points
- Close-out of the envelope, services and interior packages
- Handover expected in Q2 2027
Payment Linked Progress
What 85.08% Progress Means for Cavalli Tower Buyers
With 14.92 points left before 100%, the Cavalli Tower 60/40 plan is moving toward its largest payment: the 40% due on handover, expected in Q2 2027. Which of the four 10% construction instalments are still open is set by your SPA, not by this reading. At this stage, four actions matter most.
Recheck the escrow account
If any construction instalment is still ahead of you, pay it only into the DLD regulated escrow account registered for project 2283. Cavalli Tower escrow account verification takes about two minutes against the official DLD project record, so repeat it before each transfer rather than relying on an earlier check.
Reread your SPA milestone schedule
Find the clauses in your sale and purchase agreement that set the handover notice period and the timing of the 40% handover payment, and confirm with DAMAC which instalments remain before Q2 2027. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Book the snagging window
At 85.08% and with handover expected in Q2 2027, less than a year after this reading, Cavalli Tower sits inside the booking window for a pre handover inspection. Cavalli Tower snagging inspection guide covers what to schedule before acceptance.
Track the remaining cycles
14.92 points remained after the 15 July 2026 reading. Each new register reading is logged on the Cavalli Tower construction updates hub, so a change in pace or in the Q2 2027 expectation shows up there first.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 85.08%?
Entering Cavalli Tower at 85.08% means buying into a tower whose structure the July 2026 RERA report records as substantially completed, with the remaining work concentrated inside and around the building and handover expected in Q2 2027. Every payment goes to the DLD-registered escrow account for project 2283, released against verified construction progress.
- Structure substantially completed per the 15 July 2026 RERA report
- Handover expected in Q2 2027
- 40% of the 60/40 plan payable on handover
- Construction risk carried from the first excavation
- Handover usually several years after reservation
- Instalments spread across the whole build at launch-era pricing
08 Units Available on the project page as of this update; availability shifts between cycles.
About the Development
Cavalli Tower Project Details

Recorded at 85.08% on 15 July 2026, Cavalli Tower is a 70-storey DAMAC tower of 438 residences on the Al Sufouh coast, from 1 bedroom apartments to duplex residences and penthouses, now in its final finishing stretch. Starting prices: AED 1.75M ≈ USD 475K.
A buyer entering at this reading gives up most of the construction-period instalment runway in exchange for a short wait, with the 40% handover payment and the Q2 2027 handover close behind.
Cavalli Tower by DAMAC Project GuideSite Context This Cycle
Explore Cavalli Tower Location on Dubai Map
Cavalli Tower stands on plot 91 on the Al Sufouh coast, looking across the water toward Palm Jumeirah. With the structure substantially completed, the July 2026 record adds external works progressing on site, the stage where attention moves from the height of a 70-storey tower to its ground level and the approach residents will use every day.
Al Sufouh stretches about 7 square kilometres toward Dubai Marina, with Sheikh Zayed Road running through it and Dubai Internet City and Dubai Media City already operating alongside, so buyers planning to occupy or lease after the Q2 2027 handover are looking at an established corridor rather than a district still being built. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Cavalli Tower as Handover Approaches
At 85.08%, the questions move from whether the tower will be built to what to verify, pay and inspect before Q2 2027. Each resource below matches where Cavalli Tower stood in July 2026.

Cavalli Tower Construction Updates
This page: the 15 July 2026 register reading for Cavalli Tower, with external works on site.

Cavalli Tower Golden Visa, Decided Unit by Unit
DAMAC's 70-storey Cavalli Tower in Dubai Media City qualifies from 2 bedrooms; a 1 bedroom only at the threshold or more.
Read Cavalli Tower Golden Visa Guide
Cavalli Tower Escrow: DAMAC's Media City Account at Emirates NBD
Emirates NBD holds Cavalli Tower escrow for DAMAC, DLD project 2283, 441 units, certified 85.08% in July 2026.
Verify Cavalli Tower Escrow Account
Cavalli Tower Snagging on the Al Sufouh Coast
Cavalli Tower is DAMAC's 70-storey branded tower in Dubai Media City, facing Palm Jumeirah, with 438 residential units.
Book Cavalli Tower Snagging InspectionUpdate Timeline
Other Cavalli Tower Construction Updates
Project renderings show Cavalli Tower as designed; this timeline shows it as recorded, from the March 2026 reading to this one and on to the next.
Where This Update Fits
Explore Cavalli Tower Structure
The July 2026 reading is one data point in a wider record: the Dubai Media City market the tower will compete in, the district around it, and DAMAC as the developer delivering it.

Dubai Media City Properties for Sale
Browse apartments and branded residences for sale in Dubai Media City, with prices and payment plans.
See Dubai Media City Properties for Sale
Dubai Media City: The Creative District Between Palm Jumeirah and Dubai Marina
Dubai Media City is home to more than 4,000 companies, with a limited residential market of branded residences and serviced homes.
Explore the Dubai Media City Community
DAMAC Properties: Lagoon Communities, Golf Villas and Branded Collaborations
Founded in 2002, DAMAC has delivered 48,000 homes and is known for large-scale master communities, luxury residential projects and branded collaborations.
View the DAMAC Developer ProfileFAQs
Cavalli Tower Construction Progress in July 2026: Frequently Asked Questions
Cavalli Tower (DLD project 2283) was recorded at 85.08% construction progress in the DLD project register on 15 July 2026. The RERA Independent Progress Monitoring Report for that inspection gives the progress status as Main Contract - Progressing, and the register still lists the project as Active.
The register reading rose from 73.49% on 24 March 2026 to 85.08% on 15 July 2026, a gain of 11.59 points over 113 days. On a 30-day month that is about 3.08 points a month, simple arithmetic from two dated readings rather than a forecast; the full reading history is kept on the Cavalli Tower construction updates hub.
The RERA report dated 15 July 2026 groups the enabling, foundation and structure works together and records them as substantially completed. In construction reporting that term normally describes a package that is essentially finished with at most minor items outstanding; the report does not list any remaining structural items. The same report places the weight of the programme on internal works, the external envelope, MEP and internal finishes, all progressing at advanced stages.
Yes. The RERA report of 15 July 2026 notes external works progressing on site, a line that does not appear in the March 2026 report notes. The report does not break the package down; on a residential tower, external works usually cover the ground around the building, such as hardscape, landscaping, drainage and access, and they run alongside the envelope work on the facade.
The DLD app lists 9 inspection photographs for the 15 July 2026 visit. The four printed in the RERA report show an open-plan floor with marble flooring, floor-to-ceiling glazing and workers on site, a fitted kitchen with a gas hob and built-in oven, a bathroom with marble-effect wall cladding, and the tower exterior with its facade cut-out. They belong to the official record and are not reproduced here; the header image on this page is a project rendering, not one of them.
Three checks follow from the July 2026 reading. Confirm with DAMAC which of the four 10% construction instalments are still open and when the 40% handover payment falls due under your SPA; verify the escrow account registered for DLD project 2283 before any further transfer; and plan an independent pre handover inspection so defects are documented before you accept the unit.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the July 2026 inspection record for Cavalli Tower correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.