Cavalli Tower Construction Update - March 2026

March 2026 DLD Register Reading Places Cavalli Tower at 73.49% Construction Progress in Dubai Media City

Envelope, MEP, internal and finishing works are progressing at advanced stages at Cavalli Tower, with the DLD register recording 73.49 percent after the 24 March 2026 inspection.

Direct advisor access. Every message answered personally, never by a call center.

73.49%DLD Register Progress
24 March 2026Inspection Date
Q2 2027Expected Handover
2283DLD Project Number

Verified DLD Inspection Data

Cavalli Tower Construction Snapshot

A 7.99 point rise since the previous inspection carries Cavalli Tower past the 70% mark and into the finishing band, where the record stops describing how the tower is built and starts describing how it is completed.

Project Name

Cavalli Tower by DAMAC

Project Number

2283

Project Status

Active

Construction Progress

73.49%

Inspection Date

24 March 2026

Construction Start

30 November 2021

Total Units

438 residential units

Total Built Area

78,976.92 sq m

Expected Completion

Q2 2027

Data source: DLD project register reading dated 24 March 2026 for project 2283, registered as Cavalli Casa Tower, read with the RERA Independent Progress Monitoring Report of the same date. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. The header image is project imagery of the sky pool, not a site photograph. Last updated: September 2026.

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

This Inspection Cycle

Cavalli Tower Construction Progress Summary

The DLD register moved Cavalli Tower from 65.5% at the previous, undated inspection to 73.49% on 24 March 2026, a gain of 7.99 points. The RERA report of the same date records the concrete structure of the 70-storey tower and its six parking floors as complete, so everything left to do sits in the envelope, the building services and the apartment interiors.

Completed
  • Enabling and foundation works, recorded as completed
  • Structure works on the 70-storey residential tower
  • Structure of the six parking floors below the residences
In Progress at 73.49%
  • Building envelope works at an advanced stage
  • MEP systems: mechanical, electrical, and plumbing installations
  • Internal works and finishes across the 438 residential units
  • Ongoing site mobilization supporting the finishing trades
Ahead of Handover
  • Remaining RERA inspection cycles toward 100%
  • Completion of the envelope, services and interior packages
  • Handover expected in Q2 2027
Next inspectionThe next reading after 24 March 2026 is covered in the July 2026 Cavalli Tower update on this cluster.
Completion targetHandover expected in Q2 2027; the DLD register lists a registered completion date of 30 September 2025.
Remaining distance26.51 percentage points separate the March 2026 reading from 100%.

Payment Linked Progress

What 73.49% Progress Means for Cavalli Tower Buyers

The Cavalli Tower 60/40 plan spreads four 10% instalments across construction and leaves 40% for handover, so a register reading of 73.49% shows how much of the building stands behind the money already paid, and how much remains before the largest single payment. At this stage, four actions matter most.

Before Remaining Instalments

Verify the escrow account

Any instalment still ahead of handover should go only to the DLD regulated escrow account registered for project 2283. Cavalli Tower escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.

Before the Handover Notice

Reread your SPA milestone schedule

Check how your sale and purchase agreement defines the four construction instalments, the 40% due on handover, and the handover notice period, then map those clauses against the Q2 2027 handover. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.

Window Open Now

Plan the snagging inspection

Past 70% on the March 2026 reading, Cavalli Tower has entered the planning window for a pre handover inspection, well before the Q2 2027 handover. Cavalli Tower snagging inspection guide covers the booking window before acceptance.

Every Cycle

Track the remaining cycles

26.51 points stood between the March 2026 reading and 100%, and each new register reading lands on the Cavalli Tower construction updates hub, keeping the path to handover in view.

General framework, not legal advice: instalment definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.

Buying at 73.49%?

Entering Cavalli Tower at this stage trades a long launch-era instalment runway for a structure already recorded as complete, with handover expected in Q2 2027 and the largest single payment, 40% on handover, still ahead. Every payment goes to the DLD-registered escrow account for project 2283, released against verified construction progress.

Entering Now at 73.49%
  • Structure recorded as completed in the 24 March 2026 RERA report
  • Handover expected in Q2 2027
  • 40% of the 60/40 plan held back until handover
Typical Launch Entry
  • Structural risk carried from foundations to handover
  • A delivery horizon usually measured in years, not quarters
  • Longer instalment runway at launch-era pricing
AED 1.75M ≈ USD 475KStarting Price
60/40 Plan40% Due on Handover
Q2 2027Expected Handover
Ask What Is Available at Cavalli Tower

08 Units Available on the project page as of this update; availability shifts between cycles.

About the Development

Cavalli Tower Project Details

Cavalli Tower by DAMAC modern exterior architecture with curved balconies and glass facade in Dubai skyline - Presented by Tohid Fetrat
Dubai Media City · DAMAC

With its structure recorded as complete in March 2026, Cavalli Tower is a finishing stage DAMAC tower of 438 residences, from 1 bedroom apartments to duplex residences and penthouses, on the Al Sufouh coast. Starting prices: AED 1.75M ≈ USD 475K.

For buyers entering at 73.49%, the trade off is a shorter wait against a heavier share of the price falling due on handover, which is expected in Q2 2027.

Cavalli Tower by DAMAC Project Guide

Site Context This Cycle

Explore Cavalli Tower Location on Dubai Map

Cavalli Tower rises on plot 91 on the Al Sufouh coast, facing Palm Jumeirah across open water. On an exposed waterfront site the envelope is the package that closes a 70-storey tower against sea air and summer heat, and the March 2026 record places it at an advanced stage together with the MEP and interior works.

Al Sufouh is bordered by Dubai Internet City, Dubai Media City and Dubai Knowledge Park, an established business corridor, so Cavalli Tower is finishing into working districts rather than an emerging master plan, which matters for buyers weighing occupancy or rental plans against the Q2 2027 handover. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Cavalli Tower by DAMAC on Dubai Map

Buyer Resources for This Project

Investing in Cavalli Tower During Its Finishing Stage

At 73.49%, residency planning, payment protection, and handover preparation begin to overlap for Cavalli Tower buyers. Each resource below matches where the tower stood in March 2026.

Cavalli Tower by DAMAC construction updates skyline rendering showing the tower within Dubai skyline - Presented by Tohid Fetrat
You Are Here

Cavalli Tower Construction Updates

This page: the 24 March 2026 register reading for Cavalli Tower, with structure recorded complete.

Cavalli Tower by DAMAC Golden Visa eligibility concept with luxury development and UAE Golden Visa card in Dubai - Presented by Tohid Fetrat

Cavalli Tower Golden Visa, Decided Unit by Unit

DAMAC's 70-storey Cavalli Tower in Dubai Media City qualifies from 2 bedrooms; a 1 bedroom only at the threshold or more.

Read Cavalli Tower Golden Visa Guide
Cavalli Tower by DAMAC Escrow Account security concept with protection shield lock icon and luxury tower in Dubai - Presented by Tohid Fetrat

Cavalli Tower Escrow: DAMAC's Media City Account at Emirates NBD

Emirates NBD holds Cavalli Tower escrow for DAMAC, DLD project 2283, 441 units, certified 85.08% in July 2026.

Verify Cavalli Tower Escrow Account
Cavalli Tower by DAMAC snagging inspection showing a luxury bedroom interior with ensuite bathroom, Presented by Tohid Fetrat

Cavalli Tower Snagging on the Al Sufouh Coast

Cavalli Tower is DAMAC's 70-storey branded tower in Dubai Media City, facing Palm Jumeirah, with 438 residential units.

Book Cavalli Tower Snagging Inspection

Update Timeline

Other Cavalli Tower Construction Updates

This March 2026 page is the earliest monthly record in the Cavalli Tower series; the July 2026 update picks up the history from here, reading by reading.

All Cavalli Tower Construction Updates

FAQs

Cavalli Tower Construction Progress in March 2026: Frequently Asked Questions

As of the DLD project register reading dated 24 March 2026, Cavalli Tower (DLD project 2283) stands at 73.49% construction progress. The RERA inspection report of the same date lists the progress status as Main Contract - Progressing.

The register moved from 65.5% at the previous inspection to 73.49% on 24 March 2026, a rise of 7.99 points. The previous inspection carries no date in the register, so this pair supports a delta only, not a monthly pace; the dated reading history is kept on the Cavalli Tower construction updates hub.

Yes. The RERA inspection report dated 24 March 2026 records the enabling, foundation and structure works as completed for the residential tower and its six parking floors. Mobilization was still ongoing on site, and the envelope, MEP, internal works and finishes were progressing at advanced stages.

On 24 March 2026, 26.51 percentage points separated the 73.49% reading from 100%. The open packages named in the RERA report were the building envelope, mechanical, electrical and plumbing systems, and the internal works and finishes, followed by the remaining inspection cycles ahead of the expected Q2 2027 handover.

The DLD app lists 10 inspection photographs for the 24 March 2026 visit. Those printed in the RERA report show an apartment interior with an open kitchen and a ceiling air conditioning grille, a cove-lit ceiling detail, and two apartment corridors, one with finished doors and flooring and one with ceiling services still exposed. The photographs belong to the official record and are not reproduced on this page.

The header image is project imagery of the sky pool, an amenity the developer's brochure places on level 58 beside a sky garden with live cooking stations. It illustrates the planned amenity and is not a photograph of site progress; progress for March 2026 is documented by the DLD register reading and the RERA inspection report.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the March 2026 inspection record for Cavalli Tower correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts