Emaar Properties · Dubai Creek Harbour
Cedar at Dubai Creek Harbour Construction Updates
Four Creek Beach Buildings, One Shared Register, Recorded Complete
Cedar at Dubai Creek Harbour recorded 100% at the 04 November 2025 RERA inspection of its joint register, leaving four park-side Creek Beach buildings Ready for handover.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Cedar at Dubai Creek Harbour at a Glance
Cedar is Emaar Properties' 272-apartment, four-building community in the Creek Beach district of Dubai Creek Harbour, and it does not hold a DLD registration of its own. It is registered jointly with its neighbours Savanna and Mangrove under project 2551, Creek Beach - Savanna-Cedar-Mangrove, so every progress reading on this page describes that combined registration. Between the 27 May 2023 construction start and the 100% recorded on 04 November 2025, the register ran just under two and a half years, and it now reads Finished.
2551, Creek Beach - Savanna-Cedar-Mangrove (joint)
Finished (DLD), handover Ready
27 May 2023
272 apartments (Cedar); 595 units on joint register 2551
336,531.98 sq m (joint register 2551: Savanna, Cedar and Mangrove)
31 July 2026 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Cedar at Dubai Creek Harbour Construction Update Timeline
Cedar's record is short and ends at the finish line. Construction on joint register 2551 started on 27 May 2023, and the only dated inspection, on 04 November 2025, recorded 100%, with a previous reading of 92.73% listed beside it without a date. The single dot on the track below is that November reading, and the table row links the full monthly update with the inspection notes behind it.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| November 2025 | 100% | 04 November 2025 | View the November 2025 update |
Reading the dates: the DLD-registered completion date for project 2551, Creek Beach - Savanna-Cedar-Mangrove, is 31 July 2026, and that date has now passed. Here it is not a delay marker: the joint register Cedar shares with Savanna and Mangrove had already recorded 100% at the 04 November 2025 inspection, 269 days before it, and now reads Finished, while Cedar's handover status is Ready. The registered date remains an administrative anchor from registration.
Pace Analysis
How Fast Cedar at Dubai Creek Harbour Has Been Built
Cedar's record holds one dated reading, so there is no inspection-to-inspection velocity to compute. What the register does support is the arithmetic below:
- May 2023 to Nov 2025: whole build, 27 May 2023 start to 100% on 04 November 2025 (arithmetic average)About 3.4 points per month
- Undated previous reading to Nov 2025: 92.73% to 100%, no date to divide by7.27 points, undated step
- From 04 November 2025: distance left to 100% on joint register 25510 points remaining
Spread evenly, 100 points across the 29.3 months between the 27 May 2023 start and the 04 November 2025 inspection works out at about 3.4 points per month. Treat that as an average for the whole joint registration, not a measured pace: it cannot show whether Cedar's four buildings rose faster or slower than Savanna and Mangrove on the same register, and the 7.27-point step from the undated 92.73% cannot become a monthly rate because the earlier reading has no date. The dated evidence that does exist all points the same way. Civil defence approval on 26 August 2025, LPG approval on 16 September 2025 and the Dubai Development Authority completion certificate on 23 October 2025 all landed before the 100% inspection, and that inspection came 269 days ahead of the registered 31 July 2026 date. For an end user, zero points remaining moves every question from construction to the condition of the apartment; for an investor, a register that closed well inside its own deadline is the delivery signal to weigh against the missing curve.
Get the Next Inspection Figure First
Tell me you are tracking Cedar at Dubai Creek Harbour and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Cedar at Dubai Creek Harbour
A 100% reading is a number; the project guide shows what that number delivered. Everything a buyer is tracking toward on this page is set out there:

Cedar at Dubai Creek Harbour, a Park-View Creek Beach Community
Cedar at Dubai Creek Harbour is Emaar's four-building community in Creek Beach, 272 apartments around a central plaza with park views.
View the Cedar at Dubai Creek Harbour Project GuideConsidering a Ready Entry at Cedar?
Cedar is finished and sold as Ready, so what is left to buy is whatever remains unsold, and that list changes as units are taken. If the record on this page is what brought you here, ask me for current availability before settling on a layout.
Ask About Remaining Availability on WhatsAppStage Record
Cedar at Dubai Creek Harbour Build Stages, Mapped to the Inspections
With one dated reading on file, each stage below is anchored to the register dates and the approvals listed in the 04 November 2025 report rather than to a generic sequence, so the windows show where Cedar's four buildings sit in the joint record.
Registration and Site Start
Project 2551 was registered on 01 March 2023 and construction started on 27 May 2023 on plot 169 in Al Khairan First; no inspection reading from this window is on the record.
Four-Building Structure
Cedar's concrete-and-block frames rose to G+M+9 for Buildings 1 and 3 and G+M+7 for Buildings 2 and 4; the supplied record dates no reading inside this window.
Finishes and Building Services
Internal and external finishes follow the structure in the report's project description; the previous listed reading of 92.73% carries no date, so this window cannot be pinned to a month.
Authority Approvals
Civil defence approval received on 26 August 2025, LPG approval from civil defence on 16 September 2025, and the Dubai Development Authority completion certificate dated 23 October 2025.
Completion, Snagging, and Handover
The 04 November 2025 inspection recorded 100%, with construction activity complete across the register, water and electricity meters connected and snagging works still running; handover status is Ready.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Cedar at Dubai Creek Harbour's own record.
Buyer Position
Tracking Your Position at Cedar at Dubai Creek Harbour
This page is one of four project resources that together cover a Cedar at Dubai Creek Harbour purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Cedar at Dubai Creek Harbour Construction Updates
This page: the joint register 2551 record for Cedar, from the May 2023 start to 100%.

Cedar at Dubai Creek Harbour Golden Visa: Four Buildings Around a Plaza
Cedar at Dubai Creek Harbour, 272 Emaar apartments at Creek Beach on title deed, qualifies at 2 and 3 bedroom layouts.
Read the Cedar at Dubai Creek Harbour Golden Visa Guide
Cedar at Dubai Creek Harbour Escrow: A Finished Creek Release's Account
Cedar at Dubai Creek Harbour, a finished Emaar Creek release, held every buyer instalment in one Dubai Islamic Bank escrow account.
Verify the Cedar at Dubai Creek Harbour Escrow Account
Cedar at Dubai Creek Harbour Snagging Before You Accept a Finished Apartment
Cedar at Dubai Creek Harbour is an Emaar Properties community of 272 apartments across four buildings in the Creek Beach district.
Book Cedar at Dubai Creek Harbour SnaggingApproaching Handover
Between 100% and Handover: What Cedar at Dubai Creek Harbour Buyers Should Do Now
Cedar has no construction gap left to close: its joint register reached 100% on 04 November 2025, and the work that remains sits on the buyer's side of the handover. With the building already sold as Ready, there is no construction runway left to prepare in, so the three steps below belong before you sign acceptance of a unit, not after.
First, have an independent inspection record any defects in your finished apartment before you accept it; the Cedar snagging inspection page sets out what gets checked in a completed Cedar unit.
Second, reconcile what you have paid against the escrow record on the Cedar escrow account page, which explains how the account served joint register 2551 during construction and what applies on a ready purchase.
Third, if residency is part of the plan, confirm eligibility through the Cedar Golden Visa guide; on a ready Cedar purchase the application follows the title deed issued on transfer.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore Dubai Creek Harbour Structure
A finished register is only part of the picture; the rest is what surrounds it. These three pages put Cedar's completed buildings in their market, master community, and developer context:

Dubai Creek Harbour Properties for Sale
Browse waterfront apartments, branded residences and penthouses for sale in Dubai Creek Harbour.
See Dubai Creek Harbour Properties for Sale
Dubai Creek Harbour: Emaar's Waterfront City With a Marina and Urban Beach
Dubai Creek Harbour is Emaar's waterfront city between Downtown Dubai and the Creek, planned for 48,500 homes with skyline views.
Explore the Dubai Creek Harbour Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Cedar at Dubai Creek Harbour Construction Updates Frequently Asked Questions
Cedar at Dubai Creek Harbour is complete: DLD project 2551, Creek Beach - Savanna-Cedar-Mangrove, which Cedar shares with Savanna and Mangrove, reads Finished after recording 100% at the RERA inspection of 04 November 2025, and the handover status is Ready. That figure was 323 days old when this page was updated in September 2026; the full record is in the Cedar inspection timeline above.
The 04 November 2025 inspection of joint register 2551 recorded 100% construction progress, 7.27 points above the 92.73% shown as the previous inspection, a reading with no date attached. Its notes and the approvals behind them are set out in the November 2025 construction update for Cedar.
The DLD-registered completion date for project 2551 is 31 July 2026, and it passed after delivery rather than before it: the joint register had already recorded 100% on 04 November 2025, 269 days earlier, and reads Finished, with Cedar's handover status Ready. The date stays on the record as the administrative anchor set when the project was registered on 01 March 2023, and this page's record is updated if the register changes.
Cedar at Dubai Creek Harbour comprises 272 apartments across four buildings: Buildings 1 and 3 rise to ground, mezzanine and nine floors, Buildings 2 and 4 to ground, mezzanine and seven. The unit and area totals on DLD register 2551 also include Savanna and Mangrove, so no Cedar-only built-up area figure is published on this page.
Averaged across the whole build, the joint register moved 100 points in about 29.3 months, from the 27 May 2023 construction start to 100% on 04 November 2025, or about 3.4 points per month. That figure is arithmetic rather than a measured inspection-to-inspection pace; the reasoning is in the Cedar pace analysis above.
With the joint register at 100% since 04 November 2025 and Cedar sold as Ready, buyers should have independent snagging at Cedar done before accepting a unit, reconcile payments on the Cedar at Dubai Creek Harbour escrow account page, and confirm residency eligibility through the Cedar at Dubai Creek Harbour Golden Visa guide before the title deed is issued on transfer.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Cedar at Dubai Creek Harbour construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.