City Walk Crestlane 4 Construction Update - October 2026
October 2026 Inspection Records City Walk Crestlane 4 at 0.01% on the DLD Register, Still Pre-Construction in City Walk
No construction activity had started on site at the 06 October 2026 RERA inspection, leaving City Walk Crestlane 4 at 0.01 percent on the DLD register.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
City Walk Crestlane 4 Construction Snapshot
No change since the previous inspection, 0.01% then and 0.01% now, keeps City Walk Crestlane 4 at the pre-construction start of the enabling and foundations band, the stage where the register records a project before any structure rises.
City Walk Crestlane 4 by Meraas
4286
Active
0.01%
06 October 2026
25 February 2026
201 residential units
27,943.06 sq m
Q2 2030
Data source: RERA Independent Progress Monitoring Report for the inspection of 06 October 2026, which records the progress status as Pre-Construction, On Hold, and the Dubai Land Department project register, which shows the 0.01% reading and a previous inspection reading of 0.01% without a date. The hero image is a developer rendering of the planned entrance, not a site photograph. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: October 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
City Walk Crestlane 4 Construction Progress Summary
The RERA progress report for 06 October 2026 lists City Walk Crestlane 4 as Pre-Construction, On Hold, and notes that no construction activities had started at the site, while the DLD register gives 25 February 2026 as the construction start, 64 days after the project was registered on 23 December 2025. Both entries stand as recorded; the report states no cause for the status, and the current position is one to confirm with Meraas and on Dubai REST before paying.
- Project registration with the DLD on 23 December 2025
- Construction start entered on the register for 25 February 2026
- Trust account with First Abu Dhabi Bank P.J.S.C. named in the RERA report
- RERA progress status: Pre-Construction (On Hold), 06 October 2026
- Inspection notes: no construction activities had started at the site
- DLD register reading unchanged from the previous inspection
- Site works for the shared basement and ground level
- Superstructure of Building A (G+12) and Building B (G+10)
- Three ground floor retail units beside the main lobby
- Handover expected in Q2 2030 for the 201 residences
Payments and Progress
What 0.01% Progress Means for City Walk Crestlane 4 Buyers
The City Walk Crestlane 4 plan runs on calendar dates rather than construction milestones, so a 0.01% reading tells you how much of the build lies ahead while the dated schedule keeps running alongside it. Before construction starts, four actions matter most.
Verify the escrow account
Every instalment should go only to the DLD regulated escrow account registered for project 4286, which the RERA report places with First Abu Dhabi Bank P.J.S.C. City Walk Crestlane 4 escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA payment schedule
By the developer's dated schedule, 35% of the price (20% on booking, 10% in May 2026, 5% in September 2026) was scheduled by September 2026, while the register reads 0.01%: schedule arithmetic, not a delay claim. Check how your SPA sets the dates for a purchase made now and the handover notice against Q2 2030. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the DLD register readings.
Confirm your Oqood registration
An off plan unit is recorded on the DLD interim register, Oqood, against project 4286. Ask Meraas for your Oqood record after booking and check that the unit number and buyer names match your SPA before the next dated instalment.
Track the next readings
With the RERA status recorded as Pre-Construction, On Hold, the coming readings are the ones that will show site works starting. City Walk Crestlane 4 construction updates keeps every reading dated; confirm the current site status with Meraas and on Dubai REST before paying.
General framework, not legal advice: payment dates, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 0.01%?
Entering before construction starts trades certainty for runway: the buildings are still to rise, the dated plan stretches to a Q2 2030 handover, and the choice is among the units Meraas still holds. Every payment goes to the DLD-registered escrow account for project 4286, released against verified construction progress.
- Pre-construction entry: the RERA report records no site works yet
- Roughly three and a half years to the Q2 2030 handover
- 25% of the 75/25 plan due on handover
- Structure largely built and visible before you commit
- Months rather than years to the handover date
- Shorter runway, with more of the price due near completion
Limited units available per the project page as of this update; availability shifts between cycles.
About the Development
City Walk Crestlane 4 Project Details

Recorded as pre-construction in October 2026, City Walk Crestlane 4 is planned as 201 residences in two mid-rise buildings, Building A at G+12 and Building B at G+10, over a shared basement with three ground floor retail units. Starting prices: AED 2.70M ≈ USD 735K.
For buyers entering before site works begin, the trade off is the longest wait in exchange for the longest runway on the dated 75/25 plan, with handover expected in Q2 2030.
City Walk Crestlane 4 by Meraas Project GuideSite Context This Cycle
Explore City Walk Crestlane 4 Location on Dubai Map
City Walk Crestlane 4 sits on the Al Wasl Road side of City Walk, framed in the developer masterplan by Al Multaqa Street and 13th Street, with a second release planned beside it. Because the register describes one shared basement beneath both buildings, excavation for that level is the first package later readings would reflect; the RERA photographs of 06 October 2026 show an open, cleared plot.
City Walk is an established district whose roads, retail streets, restaurants and hotels already operate, so City Walk Crestlane 4 is being built into a working neighborhood rather than ahead of one, and for buyers the wait to Q2 2030 concerns the building, not the district around it. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in City Walk Crestlane 4 Before Construction Starts
Before site works begin, most of the payment plan and the whole build still lie ahead, so payment protection and residency planning carry the most weight. Each resource below is matched to where City Walk Crestlane 4 stands right now.

City Walk Crestlane 4 Construction Updates
This page: the October 2026 inspection record for City Walk Crestlane 4, still pre-construction at 0.01%.

Crestlane 4 Golden Visa: Every Apartment Type Above the Residency Line
City Walk Crestlane 4, a Meraas project in City Walk, clears the AED 2M Golden Visa threshold with every apartment type.
Read City Walk Crestlane 4 Golden Visa Guide
City Walk Crestlane 4 Escrow Account With First Abu Dhabi Bank
City Walk Crestlane 4, DLD project 4286, escrows 201 units at First Abu Dhabi Bank and read 0.01% in October 2026.
Verify City Walk Crestlane 4 Escrow AccountUpdate Timeline
Other City Walk Crestlane 4 Construction Updates
October 2026 opens the monthly series for City Walk Crestlane 4; each later inspection joins the record here as the build moves from pre-construction toward handover.
Where This Update Fits
Explore City Walk Crestlane 4 Structure
A pre-construction reading says little on its own; the City Walk market around the plot and the developer delivering it fill in the rest of the picture.

City Walk: Crestlane Apartments in the Meraas Lifestyle District Facing Downtown Dubai
City Walk is the Meraas lifestyle district in Al Wasl facing Downtown Dubai, with Crestlane apartments on a 75/25 payment plan.
See City Walk Properties for Sale
City Walk: Meraas's Urban Quarter With Coca-Cola Arena and Central Park
City Walk is an urban district in Al Wasl with low and mid-rise residences, 236 retail outlets and Burj Khalifa views.
Explore the City Walk Community
Meraas: Lifestyle Destinations From City Walk to Port de La Mer
Meraas is the name behind City Walk, Bluewaters Island and Madinat Jumeirah Living, from beachfront communities to luxury mixed-use districts.
View the Meraas Developer ProfileFAQs
City Walk Crestlane 4 Construction Progress in October 2026: Frequently Asked Questions
As of the RERA inspection on 06 October 2026, the Dubai Land Department project register shows City Walk Crestlane 4, project 4286, at 0.01%. The RERA progress report for that inspection prints no percentage of its own, so the 0.01% figure is the DLD register reading, dated 06 October 2026.
The DLD register shows 0.01% for the previous inspection and 0.01% for the inspection of 06 October 2026, a change of 0.00 points. The register gives no date for the previous inspection, so no pace or monthly rate can be calculated from the pair; the first measurable pace will come from two dated readings.
The RERA progress report of 06 October 2026 records the progress status as Pre-Construction, On Hold, and its inspection notes state that no construction activities had started at the site. The report gives no reason for the status. The DLD register separately lists 25 February 2026 as the construction start date; both entries stand as recorded, which is why the current site status is worth confirming with Meraas and on Dubai REST before any payment.
Handover is expected in Q2 2030, and the DLD record lists a registered completion date of 25 April 2030, which falls inside that quarter. Pre-construction comes before structural work, so a near-zero reading at this stage is not by itself a sign of delay. As arithmetic rather than a forecast, the 99.99 points remaining after 06 October 2026 average about 2.31 points per 30-day month to 25 April 2030. How readings build toward completion is covered on the City Walk Crestlane 4 construction updates hub.
The inspection notes of 06 October 2026 state that no construction activities had started at the site. The same report describes the planned development, a shared basement and ground level with three retail units beside the main lobby and two residential buildings above, but records no works on any part of it yet.
The DLD register does not announce inspection dates in advance. The next reading appears in the project record after the next RERA site visit following 06 October 2026, and it is the first that could show whether site works have begun since the Pre-Construction, On Hold status was recorded.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the October 2026 inspection record for City Walk Crestlane 4 correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.