City Walk Crestlane 5 Construction Update - October 2026
October 2026 Inspection Records City Walk Crestlane 5 at 0.01% in the DLD Register
No construction activity had started when RERA inspected City Walk Crestlane 5 on 06 October 2026; the image here is a developer rendering, not a site photograph.
Direct advisor access. Every message answered personally, never by a call center.
DLD Register and RERA Report Data
City Walk Crestlane 5 Construction Snapshot
Unchanged at 0.01% since the previous inspection, City Walk Crestlane 5 sits at the pre-construction stage, where the DLD register is read less for progress than for confirming site status before each payment.
City Walk Crestlane 5 by Meraas
4274
Active
0.01%
06 October 2026
25 February 2026
159 residential units
22,078.92 sq m
Q2 2030
Data source: the DLD project register reading dated 06 October 2026 and the RERA progress report of the same date, which records the status as Pre-Construction, On Hold. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: October 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
City Walk Crestlane 5 Construction Progress Summary
Both DLD register readings on record for City Walk Crestlane 5 are 0.01%: the previous inspection, whose date the register screen does not show, and the inspection of 06 October 2026, a change of 0.00 points. The RERA progress report of the same date records that no construction activities had started at the site, while the register lists construction as started on 25 February 2026; both entries stand as recorded.
- DLD registration of project 4274 on 10 December 2025
- Construction start entered in the register on 25 February 2026
- Escrow trust account bank on record: Abu Dhabi Commercial Bank (ADCB)
- Register reading of 0.01%, unchanged from the previous inspection
- RERA progress status Pre-Construction, On Hold, dated 06 October 2026
- No construction activities found started at the site on that date
- Shared basement and a ground level with two retail units
- Building A at G+12 and Building B at G+11
- Fit out of the 159 residences
- Handover expected in Q2 2030
Payments and the Register
What 0.01% Progress Means for City Walk Crestlane 5 Buyers
The City Walk Crestlane 5 payment plan runs on calendar dates in the developer's schedule rather than on construction stages, so a 0.01% reading does not move an instalment by itself: what it changes is how much checking each payment deserves. At this pre-construction stage, four actions matter most.
Verify the escrow account
Every instalment after booking should go only to the DLD-registered escrow account for project 4274. City Walk Crestlane 5 escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Read the SPA payment schedule
By the developer's launch schedule, 35% of the price (20% on booking, 10% in May 2026 and 5% in September 2026) was scheduled by September 2026, while the register read 0.01% on 06 October 2026: schedule arithmetic, not a judgment on progress. Both dates fall before this inspection, so Meraas confirms in the SPA the schedule that applies to a purchase now. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the recorded register readings.
Confirm your Oqood registration
Oqood is the DLD record that ties an off-plan unit to its buyer and to project 4274. Check that it is issued in your name and that the unit number and price match your SPA before the next dated instalment.
Watch the next readings
Before each dated instalment, check whether the register has moved from 0.01% and whether the RERA status still reads On Hold, and confirm the current site status with Meraas and on Dubai REST before paying. City Walk Crestlane 5 construction updates hub records each new reading as it publishes.
General framework, not legal advice: payment dates, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 0.01%?
Entering before construction activity is recorded trades certainty for runway: no structure is on record yet, the RERA status reads Pre-Construction, On Hold as of 06 October 2026, and almost the whole build lies ahead of the Q2 2030 handover. Every payment goes to the DLD-registered escrow account for project 4274, released against verified construction progress.
- No site activity recorded at the 06 October 2026 inspection
- Handover expected in Q2 2030, with 99.99 points of the build ahead
- 25% of the price held until handover under the 75/25 plan
- Structure and facade visible on site before you commit
- Months rather than years until the keys
- Most of the price due close to completion, at later pricing
Limited Units Available per the project page as of this update; availability shifts between cycles.
About the Development
City Walk Crestlane 5 Project Details

With no site activity recorded at the 06 October 2026 inspection, City Walk Crestlane 5 is a pre-construction release of 159 residences in two mid-rise buildings, Building A at G+12 and Building B at G+11. Starting prices: AED 2.80M ≈ USD 0.76M.
For buyers entering now, the trade off is the longest runway in the 75/25 plan against the longest wait for keys, with handover expected in Q2 2030.
City Walk Crestlane 5 by Meraas Project GuideSite Context This Cycle
Explore City Walk Crestlane 5 Location on Dubai Map
On the developer masterplan, City Walk Crestlane 5 sits inside a City Walk plot group framed by Al Wasl Road, Al Multaqa Street and 13th Street, with both buildings planned to face inward onto shared water features and park landscaping. Set back from the street edge, the plot shows no recorded construction activity as of the 06 October 2026 inspection, so the change buyers should watch for is in the register rather than on the skyline.
City Walk is an established Meraas district with finished retail streets, restaurants and hotels, and Sheikh Zayed Road about three minutes away by car, so City Walk Crestlane 5 is planned into a functioning neighborhood rather than an emerging one: for buyers at this stage, location carries little open risk and construction timing carries most of it. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in City Walk Crestlane 5 at the Pre-Construction Stage
Before the structure rises, the questions that matter are residency eligibility and where each payment is held. Each resource below is matched to where City Walk Crestlane 5 stands at the October 2026 reading.

City Walk Crestlane 5 Construction Updates
This page: the 06 October 2026 register reading and RERA status for City Walk Crestlane 5.

Crestlane 5 Golden Visa: Six Unit Types Meet the AED 2M Threshold
City Walk Crestlane 5 by Meraas in City Walk has all six unit types above the AED 2M Golden Visa threshold.
Read City Walk Crestlane 5 Golden Visa Guide
Crestlane 5 Escrow: Instalments Held at ADCB Until the Work Is Verified
City Walk Crestlane 5 routes payments for 159 units to ADCB under DLD project 4274, which read 0.01% in October 2026.
Verify City Walk Crestlane 5 Escrow AccountUpdate Timeline
Other City Walk Crestlane 5 Construction Updates
This October 2026 report is the first monthly page for City Walk Crestlane 5; the hub collects every reading as the project moves out of pre-construction.
Where This Update Fits
Explore City Walk Crestlane 5 Structure
This monthly report is one layer of a wider record: the City Walk market the project competes in, the district around the plot, and the developer delivering both.

City Walk: Crestlane Apartments in the Meraas Lifestyle District Facing Downtown Dubai
City Walk is the Meraas lifestyle district in Al Wasl facing Downtown Dubai, with Crestlane apartments on a 75/25 payment plan.
See City Walk Properties for Sale
City Walk: Meraas's Urban Quarter With Coca-Cola Arena and Central Park
City Walk is an urban district in Al Wasl with low and mid-rise residences, 236 retail outlets and Burj Khalifa views.
Explore the City Walk Community
Meraas: Lifestyle Destinations From City Walk to Port de La Mer
Meraas is the name behind City Walk, Bluewaters Island and Madinat Jumeirah Living, from beachfront communities to luxury mixed-use districts.
View the Meraas Developer ProfileFAQs
City Walk Crestlane 5 Construction Progress in October 2026: Frequently Asked Questions
The DLD project register shows City Walk Crestlane 5 (project 4274) at 0.01% for the inspection dated 06 October 2026, the same value as the previous inspection, whose date the register screen does not show. The RERA progress report of that date adds that no construction activities had started at the site.
Yes, it can. Handover is expected in Q2 2030, and as of 06 October 2026 the completion date held in the DLD register falls inside that quarter. Registered completion dates can be revised between inspection cycles, and with 99.99 percentage points of the build still ahead, any revision would show up in a later reading, each of which is logged on the City Walk Crestlane 5 construction updates hub.
It is the progress status recorded for City Walk Crestlane 5 in the RERA progress report dated 06 October 2026, next to an inspection note that no construction activities had started at the site. The report gives no cause and none is implied here. The DLD register still lists the project as Active, with construction entered as started on 25 February 2026 and a registered completion date of 25 April 2030, so the current site status is worth confirming with Meraas and on Dubai REST before any payment.
Both readings are 0.01%, a change of 0.00 points. Because the previous inspection carries no date on the register screen, the pair gives no monthly pace. The only measurable span runs from the registered construction start on 25 February 2026 to 06 October 2026: 0.01 points over 223 days, effectively zero at this pre-construction stage. That is arithmetic, not a forecast.
Almost the entire build: 99.99 percentage points separate the 06 October 2026 reading from 100%, covering the shared basement, Building A at G+12, Building B at G+11, two ground-floor retail units and the fit out of 159 residences. The 75/25 plan follows calendar dates rather than construction stages, so the instalment dates in each buyer's SPA, not this reading, set when payments fall due.
No date is announced. A new reading appears in the DLD project register after RERA's next site visit, and until then 0.01% at 06 October 2026 remains the most recent figure on record. Dubai REST shows the inspection date beside each reading, which is the quickest way to check whether a newer one has been published.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the October 2026 inspection record for City Walk Crestlane 5 correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.