City Walk Crestlane 5 Construction Updates
The Register Record for Two Mid-Rise Buildings Off Al Wasl Road
City Walk Crestlane 5 read 0.01% in the DLD register on 06 October 2026, the baseline for tracking Building A and Building B to handover.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
City Walk Crestlane 5 at a Glance
City Walk Crestlane 5 is a Meraas release of 159 residences in two mid-rise buildings, entered in the DLD register as project 4274 on 10 December 2025. The register dates its construction start to 25 February 2026, while the RERA progress report of 06 October 2026 records that no construction activities had started at the site; both entries stand as recorded, and the cards below hold the register anchors for this record. Unlike a record picked up halfway through a build, this one opens at the plot itself, so every figure that follows will be measured from a 0.01% starting line with a registered completion date of 25 April 2030.
4274
Active
25 February 2026
159 residential units
22,078.92 sq m
25 April 2030 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
City Walk Crestlane 5 Construction Update Timeline
So far the register holds two readings for City Walk Crestlane 5, and both are 0.01%: a previous inspection listed without a date, and the inspection of 06 October 2026. Because only the October figure carries a date, it is the single row in the table and the single labelled dot on the track below; the earlier 0.01% shares its position as an unlabelled marker. The row links the full October 2026 update, which sets the reading beside the RERA status of Pre-Construction, On Hold.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| October 2026 | 0.01% | 06 October 2026 | View the October 2026 update |
Pace Analysis
How Fast City Walk Crestlane 5 Has Been Built
A measured pace needs two dated inspections, and City Walk Crestlane 5 has one: 0.01% on 06 October 2026, preceded by an undated 0.01%. What can be computed around that single date is arithmetic, not a forecast:
- Previous inspection (undated) to 06 Oct 2026: 0.01% to 0.01%0.00 points, no pace measurable
- 25 Feb 2026 to 06 Oct 2026: registered start to the October reading, 223 daysEffectively zero, 0.01 points in total
- 06 Oct 2026 to 25 Apr 2030: 99.99 points to the registered completion date, 1,297 daysAbout 2.31 points per month
- 06 Oct 2026 to 30 Jun 2030: 99.99 points to the end of Q2 2030, 1,363 daysAbout 2.20 points per month
The curve for City Walk Crestlane 5 is, for now, a flat line resting on its starting point: 223 days separate the register's start entry from the October reading, and the RERA status for that date reads Pre-Construction, On Hold. The two lower figures describe the remaining distance, not a promise: 99.99 points spread over the 1,297 days to the registered completion date of 25 April 2030 average about 2.31 points per 30-day month, and over the 1,363 days to the end of Q2 2030 about 2.20. The figure that will change this analysis is the first dated reading above 0.01%, because its date and the October date together give the first measured pace for Building A and Building B. For an investor that first movement sets the holding timeline; for an end user planning around Q2 2030, it is the number to check before each dated instalment, alongside the current site status confirmed with Meraas and on Dubai REST.
Get the Next Inspection Figure First
Tell me you are tracking City Walk Crestlane 5 and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About City Walk Crestlane 5 at City Walk
A 0.01% reading only means something next to what is planned for the plot. The full project guide covers what buyers are tracking toward on this page:

City Walk Crestlane 5: Mid-Rise Waterside Living With Park Duplexes
City Walk Crestlane 5 is a Meraas release of 159 residences in City Walk, from 1 bedroom apartments to park duplexes.
View the City Walk Crestlane 5 Project GuideConsidering a Pre-Construction Entry?
City Walk Crestlane 5 currently has limited units available, and Meraas releases and prices that inventory, so the choice of layouts can narrow long before the first structural reading appears on this page. If the record here is what brought you, ask me what is still available before you decide.
Ask About Remaining Availability on WhatsAppStage Record
City Walk Crestlane 5 Build Stages, Mapped to the Inspections
Each window below is anchored to a date in this project's own record. With the registration, the start entry and one dated reading on file, two windows are filled and three remain ahead of the 06 October 2026 inspection, which is the plainest description of where City Walk Crestlane 5 stands.
Registration and Start Entry
Project 4274 entered the DLD register on 10 December 2025, and the register records construction as started on 25 February 2026, 77 days later.
Pre-Construction, On Hold
The 06 October 2026 RERA inspection found no construction activities started at the site and recorded this status, with the register at 0.01%.
Shared Basement and Ground Level
The basement shared by both buildings and the ground level with two retail units; no reading up to 06 October 2026 records work on either.
Building A and Building B Frames
Building A rising to G+12 and Building B to G+11; neither frame had started at the October 2026 inspection, so this stage sits wholly within the 99.99 points still open.
Fit Out, Landscape, and Handover
Fit out of the 159 residences, the water features and park landscaping both buildings face, and commissioning toward handover expected in Q2 2030.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on City Walk Crestlane 5's own record.
Buyer Position
Tracking Your Position at City Walk Crestlane 5
This page is one of four project resources that together cover a City Walk Crestlane 5 purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

City Walk Crestlane 5 Construction Updates
This page: the register record for City Walk Crestlane 5, from the 0.01% baseline to handover.

Crestlane 5 Golden Visa: Six Unit Types Meet the AED 2M Threshold
City Walk Crestlane 5 by Meraas in City Walk has all six unit types above the AED 2M Golden Visa threshold.
Read the City Walk Crestlane 5 Golden Visa Guide
Crestlane 5 Escrow: Instalments Held at ADCB Until the Work Is Verified
City Walk Crestlane 5 routes payments for 159 units to ADCB under DLD project 4274, which read 0.01% in October 2026.
Verify the City Walk Crestlane 5 Escrow AccountApproaching Handover
Between 0.01% and Handover: What City Walk Crestlane 5 Buyers Should Do Now
With the register at 0.01% and the RERA status reading Pre-Construction, On Hold on 06 October 2026, the record shows nothing built yet to inspect, so a buyer's checks belong on the paperwork and the register. The developer's launch schedule placed 35% of the price (20% on booking, 10% in May 2026 and 5% in September 2026) before that inspection date, schedule arithmetic rather than a judgment on progress, so the three steps below come before the next payment, not after it.
First, match every transfer to the City Walk Crestlane 5 escrow account page, so instalments paid while the register reads 0.01% go only to the account registered for project 4274.
Second, if residency is part of the plan, read the City Walk Crestlane 5 Golden Visa guide now: with every unit type priced above the threshold, the open question is timing against the Q2 2030 handover, not eligibility on price.
Third, before each dated instalment, compare the latest reading on this page with Dubai REST and confirm the current site status with Meraas; the City Walk Crestlane 5 October 2026 construction update shows what the current reading covers.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore City Walk Structure
The plot reads 0.01%, but the district around it already works as a place to shop, dine and live. These three pages put City Walk Crestlane 5 in its market, community and developer context:

City Walk: Crestlane Apartments in the Meraas Lifestyle District Facing Downtown Dubai
City Walk is the Meraas lifestyle district in Al Wasl facing Downtown Dubai, with Crestlane apartments on a 75/25 payment plan.
See City Walk Properties for Sale
City Walk: Meraas's Urban Quarter With Coca-Cola Arena and Central Park
City Walk is an urban district in Al Wasl with low and mid-rise residences, 236 retail outlets and Burj Khalifa views.
Explore the City Walk Community
Meraas: Lifestyle Destinations From City Walk to Port de La Mer
Meraas is the name behind City Walk, Bluewaters Island and Madinat Jumeirah Living, from beachfront communities to luxury mixed-use districts.
View the Meraas Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
City Walk Crestlane 5 Construction Updates Frequently Asked Questions
City Walk Crestlane 5 (DLD project 4274) is Active in the register at the pre-construction stage, with a DLD register reading of 0.01% dated 06 October 2026. The RERA progress report of the same date records the status as Pre-Construction, On Hold and notes that no construction activities had started at the site. The full record is in the inspection timeline above.
Two readings are on record for City Walk Crestlane 5, both 0.01%: the inspection of 06 October 2026 and a previous inspection that the register screen lists without a date, a change of 0.00 points. Only the October reading is dated, so it is the one row in the timeline; the full report for that date is on the City Walk Crestlane 5 October 2026 inspection page.
No measured pace exists for City Walk Crestlane 5 yet, because 06 October 2026 is its only dated reading. From the registered start on 25 February 2026 to that date, the register moved 0.01 points in 223 days, effectively zero. The 99.99 points that remain would average about 2.31 points per 30-day month over the 1,297 days to the registered completion date, or about 2.20 over the 1,363 days to the end of Q2 2030; that is arithmetic, not a forecast, and the working is in the pace analysis above.
The DLD register gives 25 April 2030 as the registered completion date for City Walk Crestlane 5, which falls inside the Q2 2030 quarter in which handover is expected, so the two agree as of 06 October 2026. The register reading on that date was 0.01%, and this page's record is updated as each new reading is recorded, including any revision to the registered date.
City Walk Crestlane 5 holds 159 residential units in two mid-rise buildings over a shared basement, with two retail units at ground level. Building A rises to G+12 and Building B to G+11; the RERA progress report of 06 October 2026 lists their configurations as 2B+G+12+R and 2B+G+11+R. Layouts and unit types are in the City Walk Crestlane 5 project guide.
The DLD register records construction at City Walk Crestlane 5 as started on 25 February 2026, 77 days after the project was registered on 10 December 2025. The first dated reading, 0.01% on 06 October 2026, came 223 days after that start entry, and the RERA progress report of the same date notes that no construction activities had started at the site; both entries stand as recorded.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the City Walk Crestlane 5 construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.