Creek Gate at Dubai Creek Harbour by Emaar Properties project rendering used for the November 2021 construction update showing waterfront residential towers and a close-up tower facade in Dubai - Presented by Tohid Fetrat

Emaar · Dubai Creek Harbour · Construction Update

Creek Gate Construction Update - November 2021

November 2021 Inspection Records Creek Gate at 100% on Its Registered Completion Date in Dubai Creek Harbour

Snagging and deep cleaning were still progressing, with DEWA meters installed and connected, when the DLD register logged Creek Gate at 100 percent on 18 November 2021.

Direct advisor access. Every message answered personally, never by a call center.

100%Construction Progress
18 November 2021Inspection Date
ReadyHandover Status
1813DLD Project Number

Verified DLD Inspection Data

Creek Gate Construction Snapshot

A 2.51 point rise from the previous 97.49% reading took Creek Gate to 100% on 18 November 2021, the registered completion date itself, so this record sits at the handover end of the scale: for a buyer, the open questions are now the title and condition of a finished apartment, not delivery.

Project Name

Creek Gate

Project Number

1813

Project Status

Finished

Construction Progress

100%

Inspection Date

18 November 2021

Construction Start

06 March 2017

Total Units

498 residential units

Total Built Area

55,836.00 sq m

Expected Completion

18 November 2021

Data source: DLD project register (Dubai REST) for project 1813, inspection dated 18 November 2021; the inspection notes and tower configuration quoted on this page come from the Independent Progress Monitoring Report of the same date. This reading was 1,770 days old when this page was built, about four years and ten months, so re-verify project 1813 on Dubai REST before relying on it. The image at the top of this page is a project rendering, not a site photograph. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: September 2026.

Want to hear if the Creek Gate record ever changes? Message me on WhatsApp and I will send it to you directly: one message only if the record moves, nothing else. Message me on WhatsApp

This Inspection Cycle

Creek Gate Construction Progress Summary

The independent monitor who visited on 18 November 2021 found all building construction activities substantially completed on both towers, which the report lists as Tower 1 at G+1M+35F and Tower 2 at G+1M+28F over a shared 2B+G basement. The approvals that turn a structure into a finished building were already in hand two months earlier: per the same report, DCD was received on 14 September 2021 and the BCC from DDA on 30 September 2021.

Completed
  • All building construction activities, substantially completed
  • DCD received on 14 September 2021
  • BCC from DDA received on 30 September 2021
  • DEWA meters installed and connected
In Progress at 100%
  • Snagging works progressing at site
  • Deep cleaning works progressing at site
Where the Record Stands
  • DLD register status now Finished for project 1813
  • No inspection reading on record after 18 November 2021
  • Handover status Ready for the 498 residences
Next inspectionNone on record: 18 November 2021 is the latest reading in the register, which now lists project 1813 as Finished.
Registered completion18 November 2021, met on the same day the 100% reading was recorded.
Remaining distanceZero points: the record closed 2.51 points above the previous 97.49% reading.

Payment Linked Progress

What 100% Progress Means for Creek Gate Buyers

Off plan payment plans link instalments to construction milestones, and with 100% recorded and the register reading Finished, every one of those milestones is behind Creek Gate. A purchase today is a completed-home transaction, from developer stock or on resale, so the checks move from progress to record, contract, condition and title. Four actions matter most.

Before Any Transfer

Re-check project 1813 first

The 18 November 2021 reading is 1,770 days old, so confirm the status before anything else: the lookup takes about two minutes against the official DLD project record on Dubai REST. The Creek Gate escrow account record shows how buyer payments were held in the DLD regulated escrow account while the towers were built.

Before You Sign

Read the contract for a completed unit

Check how your sale agreement sets the transfer date, who pays the 4% DLD registration fee and the condition the apartment must be in at handover, then set those terms against the completion recorded on 18 November 2021. Not sure how your contract terms map to this record? Send me your SPA schedule and I will map it against the recorded milestones.

Before Acceptance

Inspect the apartment itself

The November 2021 notes list snagging and deep cleaning as the work still progressing at site, the developer's own close-out before handover; they say nothing about the condition of any single apartment today. The Creek Gate snagging inspection guide covers documenting a ready or resale unit before you accept it.

If the Record Changes

Keep the full record to hand

The Creek Gate construction updates hub holds the dated record for both towers from the 06 March 2017 start, and is where any later change to the register would be added.

General framework, not legal advice: transfer terms, fee responsibilities and the condition due at handover are set by your individual contract and the DLD record, and both should be read directly.

Buying at 100%?

Buying after completion trades an instalment runway for certainty: the towers are finished, the register reads Finished, and the remaining choice is between specific apartments on the market. While Creek Gate was being built, buyer payments went to the DLD-registered escrow account for project 1813, released against construction progress recorded at each inspection.

Entering Now at 100%
  • Completed towers: the 18 November 2021 record above is the build picture
  • Handover status Ready, with no construction wait ahead
  • No off-plan schedule on record: the balance settles at transfer
Typical Launch Entry
  • Construction risk carried from ground works to completion
  • A delivery horizon usually measured in years, not weeks
  • A longer instalment runway at launch pricing
AED 1.56M ≈ USD 425KStarting Price
Ready PurchaseNo Off-Plan Schedule
18 November 2021Registered Completion Met
Ask What Is Available at Creek Gate

03 units listed available on the Creek Gate project page as of this update; availability shifts over time and is confirmed unit by unit.

About the Development

Creek Gate Project Details

Creek Gate at Dubai Creek Harbour by Emaar Properties aerial night view of twin residential towers with landscaped podium, swimming pools and surrounding waterfront in Dubai - Presented by Tohid Fetrat
Dubai Creek Harbour · Emaar

With both towers recorded at 100% on 18 November 2021 and the register now showing Finished, Creek Gate is a completed Emaar building of 498 one to four bedroom apartments on Creek Island. Starting prices: AED 1.56M ≈ USD 425K.

For buyers entering now, the trade off runs the other way from a launch: no instalment runway, but a finished apartment that can be inspected before transfer, with the handover status already Ready.

Creek Gate at Dubai Creek Harbour Project Guide

Site Context This Cycle

Explore Creek Gate Location on Dubai Map

Creek Gate stands on plot 129, recorded as Al Khairan First in the inspection file, on Creek Island along the northern edge of Dubai Creek Harbour Central Park, reached from the island's circular boulevard. The monitor's photographs from 18 November 2021 show both glass towers finished down to street level, with young landscaping already planted around their base.

The same photographs show a neighbouring tower still under construction, so in November 2021 the finished pair sat inside a district that was still filling in. For a completed address the brochure distances are what count: Central Park about 2 minutes on foot, Creek Marina and Vida Creek Harbour about 5 minutes, Downtown Dubai about a 10 minute drive and Dubai International Airport about 15 minutes. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Creek Gate at Dubai Creek Harbour by Emaar on Dubai Map

Buyer Resources for This Project

Buying Into Creek Gate After Construction Completion

At completion, three checks remain for a Creek Gate buyer: residency eligibility, the payment record from the build, and the condition of the specific apartment. Each resource below is matched to that stage.

Creek Gate at Dubai Creek Harbour by Emaar Properties construction updates cover image featuring project renderings of twin residential towers with landscaped podiums and waterfront surroundings in Dubai - Presented by Tohid Fetrat
You Are Here

Creek Gate Construction Updates

This page: the 18 November 2021 inspection that closed Creek Gate's record at 100 percent completion.

Creek Gate at Dubai Creek Harbour by Emaar Properties Golden Visa card graphic above a balcony overlooking residential towers and the Dubai skyline in Dubai - Presented by Tohid Fetrat

Creek Gate at Dubai Creek Harbour Golden Visa on Finished Creek Island

Creek Gate at Dubai Creek Harbour, 498 Emaar residences on Creek Island, qualifies at its 2, 3 and 4 bedroom tiers.

Read Creek Gate Golden Visa Guide
Creek Gate at Dubai Creek Harbour by Emaar Properties escrow account protection concept with shield and padlock icons above a residential entrance and landscaped arrival area in Dubai - Presented by Tohid Fetrat

Creek Gate at Dubai Creek Harbour Escrow: A Finished Creek Account

Creek Gate at Dubai Creek Harbour read 100% certified November 2021; DLD project 1813 escrowed 498 units at Dubai Islamic Bank.

Verify Creek Gate Escrow Account
Creek Gate at Dubai Creek Harbour by Emaar Properties snagging inspection cover image featuring an apartment kitchen with dining area and fitted cabinetry in Dubai - Presented by Tohid Fetrat

Creek Gate at Dubai Creek Harbour Snagging on Creek Island

Creek Gate at Dubai Creek Harbour pairs two Emaar towers along Central Park, 498 freehold residences of 1 to 4 bedrooms.

Book Creek Gate Snagging

Update Timeline

Other Creek Gate Construction Updates

This November 2021 reading is the closing entry in Creek Gate's dated record; the construction updates hub keeps the full history for both towers in one place.

All Creek Gate Construction Updates

FAQs

Creek Gate Construction Progress in November 2021: Frequently Asked Questions

The DLD project register recorded Creek Gate, project 1813, at 100% construction progress at the inspection dated 18 November 2021, up from a previous reading of 97.49%: a gain of 2.51 points. The register shows that earlier reading without a date, and the project's status now reads Finished.

Yes. The registered completion date for project 1813 is 18 November 2021, and the 100% reading carries that same date, so completion was recorded on the registered date itself rather than before or after it. With the register now showing Finished, the date is part of the historical record rather than a target that could still move; how the dated record for both towers fits together is kept on the Creek Gate construction updates hub.

The Independent Progress Monitoring Report dated 18 November 2021 found all building construction activities substantially completed. DEWA meters were installed and connected, DCD had been received on 14 September 2021 and the BCC from DDA on 30 September 2021, and the only work the report still describes as progressing at site was snagging and deep cleaning.

Not on its own. The 100% figure measures construction progress for the project as a whole, not the handover of individual apartments: on 18 November 2021 the monitoring report still listed snagging and deep cleaning in progress, although the completion approvals had been received in September 2021. Today the handover status is Ready and the DLD register reads Finished, while handover dates for individual units are not part of the inspection record.

No. The large image at the top of this page is a project rendering of Creek Gate, not a photograph taken at the 18 November 2021 inspection. The monitoring report for that date carries its own site photographs, showing both glass towers complete at street level with young landscaping around them, and those remain part of the official record rather than this page.

Open the project record for number 1813, Creek Gate, in the Dubai REST app and compare the status, the 100% figure and the 18 November 2021 completion date with this page. The reading shown here was 1,770 days old in September 2026, about four years and ten months, so the live record should be checked before any purchase decision relies on it.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the November 2021 inspection record for Creek Gate at Dubai Creek Harbour correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts