Creek Palace at Dubai Creek Harbour by Emaar Properties project rendering used for the November 2024 construction update showing planned waterfront towers, landscaped promenade, marina areas, and creek surroundings in Dubai - Presented by Tohid Fetrat

Emaar Properties · Dubai Creek Harbour · Construction Update

Creek Palace Construction Update - November 2024

November 2024 Inspection Records Creek Palace at 100% Construction Progress in Dubai Creek Harbour

All construction at Creek Palace was recorded complete on 15 November 2024, with services connected, the building completion certificate issued, and pool, gym, and lobbies ready.

Direct advisor access. Every message answered personally, never by a call center.

100%Construction Progress
15 November 2024Inspection Date
ReadyHandover Status
2191DLD Project Number

Verified DLD Inspection Data

Creek Palace Construction Snapshot

A 7.85 point rise from the previous inspection's 92.15% brought Creek Palace to 100% on 15 November 2024, the final band of the record, where construction questions give way to handover and title. This reading is 677 days old at this page's September 2026 build.

Project Name

Creek Palace at Dubai Creek Harbour

Project Number

2191

Project Status

Finished

Construction Progress

100%

Inspection Date

15 November 2024

Construction Start

16 January 2020

Total Units

337 units

Total Built Area

33,102.32 sq m

Expected Completion

31 March 2026

Data source: DLD project register reading of 15 November 2024 for project 2191, with the RERA-inspected progress monitoring report of the same date for the tower configuration and completion notes. The reading is 677 days old at this page's 23 September 2026 build; re-check project 2191 in the live DLD record before relying on it. The image at the top of this page is a project rendering, not a site photograph. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: September 2026.

Want the next Creek Palace update the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per published update, nothing else. Message me on WhatsApp

This Inspection Cycle

Creek Palace Construction Progress Summary

The previous inspection held Creek Palace at 92.15%, a figure the register carries without a date, and the 15 November 2024 reading closed the remaining 7.85 points. By then, according to the inspection report, the DCD completion of 27 September 2024 and the building completion certificate of 6 November 2024 were already on file, so this reading confirms a finished single tower rather than a push toward one.

Completed
  • Single tower structure: 3 basements, ground, 33 floors and roof
  • All construction at site, per the 15 November 2024 inspection report
  • DCD completion on 27 September 2024 and BCC on 6 November 2024
Confirmed at 100%
  • Service rooms and areas completed, fixed and connected
  • Main and sub-meters in place and connected
  • Lift safety certificates received
  • Pool area, gym, parking areas and lobbies ready
After This Reading
  • Register status shown as Finished for project 2191
  • Registered completion date of 31 March 2026 in the DLD record
  • Handover status Ready as of this page's September 2026 build
Next inspectionThe register lists project 2191 as Finished, so this 100% reading closes the construction record; any later change would appear there first.
Registered completion31 March 2026 in the DLD record, a date the 15 November 2024 reading preceded by more than sixteen months.
Remaining distanceZero percentage points: the 15 November 2024 reading is 100%.
Reading age677 days, about twenty-two months, at this page's 23 September 2026 build.

Payment Linked Progress

What 100% Progress Means for Creek Palace Buyers

Creek Palace's launch plan of record tied its final 30% to 100% construction completion, so the 15 November 2024 reading is the milestone that plan pointed to. For anyone buying into the finished tower now, the questions change from progress to verification, and four checks matter most.

Before Any Transfer

Verify the escrow account

Any payment still due to the developer on a Creek Palace unit belongs only in the DLD regulated escrow account registered for project 2191 with Emirates NBD. Creek Palace escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.

Before the Final Payment

Reread your SPA completion clauses

Check how your sale and purchase agreement ties the final 30% of the launch structure to construction completion and to the handover notice, and read those clauses against the 15 November 2024 reading. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.

Before You Accept a Unit

Inspect the unit before acceptance

With the tower recorded complete, an independent inspection documents the condition of the specific unit you are taking over, and defect rectification windows run from building completion, not from move in. Creek Palace snagging inspection guide explains that timing.

Before Relying on This Reading

Re-check the live register

This reading predates the September 2026 build by about twenty-two months, so confirm the current status of project 2191 before acting on it. Creek Palace construction updates hub holds the full completion record from registration to Finished.

General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.

Buying at 100%?

Entering Creek Palace at 100% trades the long instalment runway of a launch purchase for certainty: the tower is recorded complete, the handover status is Ready, and the remaining choice is between the units still available. Launch payments went to the DLD-registered escrow account for project 2191, released against RERA-inspected construction progress.

Entering Now at 100%
  • Construction complete on record: 100% on 15 November 2024
  • Building completion certificate dated 6 November 2024
  • Handover status Ready, with pool, gym and lobbies recorded ready
Typical Launch Entry
  • Construction risk carried from excavation to handover
  • Two to four years of waiting is the usual delivery horizon
  • Longer instalment runway, priced at launch levels
AED 1.75M ≈ USD 477KStarting Price
70/30 Launch Plan30% Was Due on Completion
ReadyHandover Status
Ask What Is Available at Creek Palace

Limited units available on the project page as of this page's September 2026 build; availability shifts between cycles.

About the Development

Creek Palace Project Details

Creek Palace at Dubai Creek Harbour by Emaar Properties waterfront apartment towers with promenade, palm landscaping, and community skyline view in Dubai Presented by Tohid Fetrat
Dubai Creek Harbour · Emaar Properties

Recorded complete on 15 November 2024, Creek Palace is a finished Palace-branded single tower of 337 units on Creek Promenade: 1, 2 and 3 bedroom apartments, plus 3 bedroom waterfront villas at its base. Starting prices: AED 1.75M ≈ USD 477K.

For buyers entering at this stage, the trade off is paying completed-building prices in exchange for no construction wait and a unit you can inspect before committing, with handover status Ready as of this page's September 2026 build.

Creek Palace at Dubai Creek Harbour Project Guide

Site Context This Cycle

Explore Creek Palace Location on Dubai Map

Creek Palace stands on plot 139 in the Al Khairan First register area, on Creek Promenade beside the Palace hotel, with its two-level waterfront villas at the base facing the Creek Canal and a retail promenade running below them. That compact waterfront footprint is why this cycle's completion notes read as a closed list: service rooms, meters, lifts, pool, gym, parking and lobbies all sit within the one tower.

The district around the finished tower is still filling in: the developer brochure places Central Park about a 5-minute walk away and Creek Marina about 10 minutes on foot, and shows four planned metro stations for Dubai Creek Harbour, planned rather than operating, which matters for buyers weighing a car-light routine from a completed home. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Creek Palace at Dubai Creek Harbour on Dubai Map

Buyer Resources for This Project

Investing in Creek Palace After Construction Completion

With the construction record closed at 100%, residency eligibility, payment verification, and unit condition are the questions that remain. Each resource below answers one of them for Creek Palace.

Creek Palace at Dubai Creek Harbour by Emaar Properties construction updates cover image featuring a project rendering of a residential balcony and living spaces overlooking the waterfront and distant city skyline in Dubai - Presented by Tohid Fetrat
You Are Here

Creek Palace Construction Updates

This page: the November 2024 RERA-inspected record showing Creek Palace at 100% and finished.

Creek Palace at Dubai Creek Harbour by Emaar Properties Golden Visa concept with a gold visa card above a landscaped residential promenade with fountains and towers in Dubai - Presented by Tohid Fetrat

Creek Palace at Dubai Creek Harbour Golden Visa on Creek Island

Creek Palace at Dubai Creek Harbour, 337 Emaar homes, qualifies at 2 and 3 bedroom apartments and waterfront villas.

Read the Creek Palace Golden Visa Guide
Creek Palace at Dubai Creek Harbour by Emaar Properties escrow account protection concept with shield and padlock icons above waterfront residential towers and promenade in Dubai - Presented by Tohid Fetrat

Creek Palace at Dubai Creek Harbour: An Escrow Certified at 100%

Emirates NBD held Creek Palace at Dubai Creek Harbour escrow for 337 units, DLD project 2191, 100% certified November 2024.

Verify the Creek Palace Escrow Account
Creek Palace at Dubai Creek Harbour by Emaar Properties snagging inspection concept featuring a furnished living room with balcony and city view in Dubai - Presented by Tohid Fetrat

Creek Palace at Dubai Creek Harbour Snagging for Canal-Facing Waterfront Villas

Creek Palace at Dubai Creek Harbour is a single Emaar tower of 337 residences beside the Palace hotel on Creek Promenade.

Book a Creek Palace Snagging Inspection

Update Timeline

Other Creek Palace Construction Updates

November 2024 is the only monthly reading published for Creek Palace; the hub carries the whole record, from registration in January 2020 to the Finished status.

All Creek Palace Construction Updates

FAQs

Creek Palace Construction Progress in November 2024: Frequently Asked Questions

The DLD project register records Creek Palace, project 2191, at 100% as of the inspection on 15 November 2024, up 7.85 points from a previous inspection reading of 92.15% that the register shows without a date, so no pace between the two readings can be stated. The reading is 677 days old at this page's 23 September 2026 build, and the register now lists the project as Finished.

Yes. The 100% reading of 15 November 2024 came more than sixteen months before the registered completion date of 31 March 2026, and the inspection report notes a building completion certificate dated 6 November 2024. Registered dates can be revised in the DLD record, but with construction recorded complete the date is now a record entry rather than a target the tower still has to meet; the full completion timeline is kept on the Creek Palace construction updates hub.

The RERA-inspected progress report of 15 November 2024 lists a building completion certificate (BCC) dated 6 November 2024, a DCD completion dated 27 September 2024, and lift safety certificates. DCD refers to Dubai Civil Defence, whose fire and life safety sign-off normally comes before the building completion certificate, which matches the order of the two dates here.

The 15 November 2024 inspection report records the pool area, gym, parking areas and lobbies as ready, with all service rooms and the main and sub-meters completed, fixed and connected. The developer brochure also describes a kids' play area and pool and a dedicated yoga room, which the inspection note does not list by name.

The reading dates from 15 November 2024, which is 677 days, or about twenty-two months, before this page's build on 23 September 2026. Nothing in it is carried forward as a current figure: the live record for project 2191 on the Dubai REST service of the Dubai Land Department is the source to check before any decision, and it is where any later status change would first appear.

Creek Palace launched on a 70/30 structure: 10% on booking, six instalments of 10%, and a final 30% due on 100% construction completion. The 15 November 2024 reading records that completion point, so under the launch structure the final 30% became the payment tied to it; how and when it was called for any individual buyer was set by that buyer's sale and purchase agreement and the developer's completion notice, not by the register reading alone.

The report describes a single tower of 3 basements, ground, 33 floors and roof on plot 139 in Al Khairan First, holding 337 units in the DLD register. The two-level waterfront villas sit at the base of that tower rather than in a separate block, so the one completion record covers every Creek Palace home.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the November 2024 inspection record for Creek Palace at Dubai Creek Harbour correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.