Emaar · Dubai Creek Harbour
Creek Palace at Dubai Creek Harbour Construction Updates
The Completed Build Record of a Palace-Branded Tower on Creek Island
Creek Palace reached 100% at the 15 November 2024 inspection, a reading 677 days old at build, closing the single-tower Creek Promenade record begun in January 2020.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Creek Palace at Dubai Creek Harbour at a Glance
Creek Palace is Emaar's 337-unit single tower on Creek Promenade, registered with the Dubai Land Department as project 2191 on 16 January 2020, the same day its construction start was recorded. The register closed it at 100% on 15 November 2024 and now lists it as Finished, so the six anchors below describe a delivered building rather than a moving target. One detail sets this record apart: the two-level waterfront villas at the foot of the tower were never a separate phase, so one completion reading speaks for the apartments above and the villas below alike.
2191
Finished
16 January 2020
337 residential units
33,102.32 sq m
31 March 2026 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Creek Palace at Dubai Creek Harbour Construction Update Timeline
The published record for Creek Palace comes down to one dated reading: 100% on 15 November 2024, taken nine days after the building completion certificate of 6 November 2024. The register's earlier figure of 92.15% carries no inspection date, so it appears in the pace analysis below as the previous inspection but not as a dot or a row, and the single table row links the full November 2024 update. At this page's 23 September 2026 build that closing reading is 677 days, about twenty-two months, old.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| November 2024 | 100% | 15 November 2024 | View the November 2024 update |
Reading the dates: the DLD-registered completion date for project 2191 is 31 March 2026, and it has now passed. At Creek Palace the work finished first: the 15 November 2024 inspection recorded 100% about sixteen and a half months before that date, and the register now shows the project as Finished. The registered date is an administrative anchor set at registration; handover is confirmed by Emaar, and the handover status on this page is Ready.
Pace Analysis
How Fast Creek Palace at Dubai Creek Harbour Has Been Built
The Creek Palace record offers two measurable spans rather than a curve of dated inspections, and each one has to be read on its own terms:
- Jan 2020 to Nov 2024: whole build, groundbreaking to 100% on 15 November 2024 (derived whole-build average)About 1.7 points per month
- Undated previous inspection to 15 November 2024: final stretch, 92.15% to 100%Up 7.85 points, no monthly rate
Because the 92.15% reading has no date in the register, no velocity can be computed for the final stretch, and this page does not estimate one. The 1.7 figure spreads 100 points evenly across the roughly 58 months from the 16 January 2020 start, so it is a derived whole-build average, not a speed measured between two Creek Palace inspections. What the dates do show is sequence: the Dubai Civil Defence completion on 27 September 2024, the building completion certificate forty days later on 6 November 2024, and the 100% reading nine days after that. For an end user, that order means the tower's approvals were in place before its construction record closed; for an investor, it means Creek Palace finished about sixteen and a half months inside its 31 March 2026 registered date, a stronger delivery signal here than any monthly rate could be.
Get the Next Inspection Figure First
Tell me you are tracking Creek Palace at Dubai Creek Harbour and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Creek Palace at Dubai Creek Harbour
A 100% reading only matters next to what it describes. The project guide sets out what the completed tower actually delivers to its owners:

Creek Palace at Dubai Creek Harbour, Beside the Palace Hotel
Creek Palace at Dubai Creek Harbour is an Emaar tower of 337 apartments and waterfront villas on Creek Promenade.
View the Creek Palace at Dubai Creek Harbour Project GuideConsidering a Completed-Building Entry?
Creek Palace is finished and listed with limited units available, so the choice now is between specific units rather than a construction wait. If this completion record is what brought you here, ask me what remains before the ready inventory narrows further.
Ask About Remaining Availability on WhatsAppStage Record
Creek Palace at Dubai Creek Harbour Build Stages, Mapped to the Inspections
Only the start and the finish of the Creek Palace build carry dates in the public record, so each stage below is anchored to what the register and the 15 November 2024 report actually show, and a stage without a dated reading says so rather than borrowing a window.
Registration and Groundbreaking
Project 2191 entered the DLD register on 16 January 2020, with construction logged as starting that same day on plot 139 in Al Khairan First.
Basements and Single-Tower Structure
The finished frame of 3 basements, ground, 33 floors and roof, as the 15 November 2024 report describes it, rose in this stage; the register publishes no dated percentage for it.
Fit-Out, Villas, and Finishes
The last reading before completion held Creek Palace at 92.15%, a figure shown without a date, with 7.85 points still to close across the tower apartments and the villas at its base.
Civil Defence and Completion Certificates
The 15 November 2024 report lists the Dubai Civil Defence completion of 27 September 2024 and the building completion certificate of 6 November 2024, forty days apart, plus lift safety certificates.
Completion Recorded and Handover
The 15 November 2024 inspection found all site construction complete, service rooms and meters connected, and the pool, gym, parking and lobbies ready; the register lists project 2191 as Finished.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Creek Palace at Dubai Creek Harbour's own record.
Buyer Position
Tracking Your Position at Creek Palace at Dubai Creek Harbour
This page is one of four project resources that together cover a Creek Palace at Dubai Creek Harbour purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Creek Palace at Dubai Creek Harbour Construction Updates
This page: the Creek Palace build record, from January 2020 groundbreaking to 100% in November 2024.

Creek Palace at Dubai Creek Harbour Golden Visa on Creek Island
Creek Palace at Dubai Creek Harbour, 337 Emaar homes, qualifies at 2 and 3 bedroom apartments and waterfront villas.
Read the Creek Palace at Dubai Creek Harbour Golden Visa Guide
Creek Palace at Dubai Creek Harbour: An Escrow Certified at 100%
Emirates NBD held Creek Palace at Dubai Creek Harbour escrow for 337 units, DLD project 2191, 100% certified November 2024.
Verify the Creek Palace at Dubai Creek Harbour Escrow Account
Creek Palace at Dubai Creek Harbour Snagging for Canal-Facing Waterfront Villas
Creek Palace at Dubai Creek Harbour is a single Emaar tower of 337 residences beside the Palace hotel on Creek Promenade.
Book Creek Palace at Dubai Creek Harbour SnaggingApproaching Handover
Between 100% and Handover: What Creek Palace at Dubai Creek Harbour Buyers Should Do Now
The construction question at Creek Palace closed with the 100% reading of 15 November 2024, and the handover status is Ready, so what separates a sound purchase from a rushed one is now the unit and its paperwork. A ready-unit transfer can move quickly once terms are agreed, so the three checks below belong before you sign, not after.
First, have the specific unit inspected independently before you accept it; defect cover runs from building completion, not from your move-in date, and the Creek Palace snagging inspection page sets out what is checked.
Second, if any payment is still due to the developer, confirm it goes only to the project 2191 escrow account with Emirates NBD; the Creek Palace escrow account page shows how to verify it against the DLD record.
Third, if residency is part of the plan, match the unit type to the threshold before you commit: the 1 bedroom apartments, from AED 1.75M ≈ USD 477K, sit below the AED 2M ≈ USD 545K line, and the Creek Palace Golden Visa page sets out the route for the larger homes.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore Dubai Creek Harbour Structure
A finished tower is judged against what surrounds it. These three pages put the Creek Palace completion record in its market, masterplan, and developer context:

Dubai Creek Harbour Properties for Sale
Browse waterfront apartments, branded residences and penthouses for sale in Dubai Creek Harbour.
See Dubai Creek Harbour Properties for Sale
Dubai Creek Harbour: Emaar's Waterfront City With a Marina and Urban Beach
Dubai Creek Harbour is Emaar's waterfront city between Downtown Dubai and the Creek, planned for 48,500 homes with skyline views.
Explore the Dubai Creek Harbour Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Creek Palace at Dubai Creek Harbour Construction Updates Frequently Asked Questions
Creek Palace is complete: the DLD project register lists project 2191 as Finished, with construction progress at 100% as of the inspection on 15 November 2024. That reading is 677 days old at this page's 23 September 2026 build, and the handover status is Ready. The full record is in the Creek Palace inspection timeline above.
The 15 November 2024 inspection took Creek Palace to 100%, up 7.85 points from a previous inspection reading of 92.15% that the DLD register shows without a date. The progress monitoring report from that visit found all site construction complete, and the Creek Palace November 2024 construction update covers the visit in full.
Creek Palace was recorded at 100% on 15 November 2024, nine days after its building completion certificate of 6 November 2024. Its DLD-registered completion date, 31 March 2026, has since passed, but the tower had finished about sixteen and a half months before it; handover is confirmed by Emaar, the handover status is Ready, and this page's record changes only if the register does.
The DLD register records 337 units at Creek Palace, spread across 1, 2 and 3 bedroom apartments and 3 bedroom waterfront villas. The progress monitoring report of 15 November 2024 describes the building as a single tower of 3 basements, ground, 33 floors and roof, with the two-level villas set at its canal-facing base.
Construction at Creek Palace started on 16 January 2020 and reached 100% on 15 November 2024, a span of about 58 months. Spread evenly, that is a derived whole-build average of about 1.7 percentage points per month; it is not a pace measured between inspections, because the only earlier reading, 92.15%, has no date in the register. The Creek Palace pace analysis explains the difference.
The DLD register pairs the 15 November 2024 reading of 100% with a previous inspection of 92.15% but gives no date for the earlier figure, and no other dated reading for project 2191 is published. This page therefore carries a single dated row and a single track dot, with the 92.15% shown as undated, instead of assigning it a month the record does not support.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Creek Palace at Dubai Creek Harbour construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.