Emaar · Emaar South
Fairway Villas 3 by Emaar at Emaar South Construction Updates
The Verified Build Record Along the Emaar South Golf Frontage
Fairway Villas 3 reached 48.52% construction at its 07 July 2026 RERA inspection, the first dated reading published for this 72-villa golf-frontage release in Emaar South.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Fairway Villas 3 by Emaar at Emaar South at a Glance
Fairway Villas 3 is Emaar's 72-villa release on plot 4880 in Madinat Al Mataar, set out as two curving rows that follow the Emaar South championship course. Certified construction started on 29 July 2024, and the DLD register holds exactly one dated reading against that start so far: 48.52% on 07 July 2026. A single dated entry on a project already past its own halfway line is the unusual feature of this record, and every anchor below comes from the registration and monitoring documents behind it.
2963
Active
29 July 2024
72 villas
31,356.37 sq m
Q1 2028
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Fairway Villas 3 by Emaar at Emaar South Construction Update Timeline
One dated reading anchors this record: 48.52%, recorded on 07 July 2026, roughly twenty-three months after the 29 July 2024 construction start. The register also carries an earlier figure of 37.86% with nothing printed beside it in the date column, so it is neither plotted on the track nor given a row in the table below, and the 10.66 point difference between the two entries stays in prose where its limits can be stated. The single row links the full July 2026 update.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| July 2026 | 48.52% | 07 July 2026 | View the July 2026 update |
Pace Analysis
How Fast Fairway Villas 3 by Emaar at Emaar South Has Been Built
With one dated inspection on file, this record cannot yet produce a measured velocity between two site visits. What it can produce is a derived average across the build so far, and one movement that carries no rate at all:
- Jul 2024 start to the Jul 2026 reading: 0% to 48.52% across about 23 monthsAbout 2.1 points per month, derived
- Undated 37.86% register entry to the 48.52% reading of 07 July 202610.66 points, no rate
Those two lines have to be read differently. The 2.1 points per month is arithmetic spread over the entire period since construction start, not something anyone observed between visits, and villa communities almost never move at a flat rate: enabling works and foundations across 72 plots absorb months while producing little certified percentage, then structure and envelope on a G+2 villa row convert into recorded progress quickly once the rows are running. The July 2026 monitoring notes place this project at precisely that turn: the shells are largely standing, while the trades that follow them have started on some rows and not on others. For anyone holding a milestone-linked payment plan, that matters more than the average figure: 48.52% sits past the 40% completion trigger and short of the 60% one, so the next published reading is the one that moves money.
Get the Next Inspection Figure First
Tell me you are tracking Fairway Villas 3 by Emaar at Emaar South and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Fairway Villas 3 by Emaar at Emaar South at Emaar South Dubai
A percentage only means something next to what it is building toward. The project guide covers the homes behind the 48.52% reading tracked on this page:

Fairway Villas 3 by Emaar at Emaar South, Along the Fairway
Fairway Villas 3 by Emaar at Emaar South is the smallest Fairway release, 72 villas along the golf course edge.
View the Fairway Villas 3 by Emaar at Emaar South Project GuideConsidering a Mid-Construction Entry?
Availability at Fairway Villas 3 is listed as limited on the project page, and what remains shifts between inspection cycles. If the record on this page is what brought you here, ask me what is available before the next reading publishes.
Ask About Remaining Availability on WhatsAppStage Record
Fairway Villas 3 by Emaar at Emaar South Build Stages, Mapped to the Inspections
Rather than a generic construction sequence, each stage below is tied to what the registration and monitoring documents actually record for this project, so you can see where the 48.52% figure sits inside the work.
Registration and Site Activation
Project 2963 entered the DLD register on 27 February 2024, five months ahead of the certified construction start recorded on plot 4880 in Madinat Al Mataar.
Enabling Works and Foundations
The July 2026 monitoring report logs enabling works as closed and foundation works among the packages that carried the build from that start date to its first dated reading.
Villa Structures at Advanced Stages
The dated inspection puts structure and foundation works at advanced stages along both curving villa runs, with the concrete-and-block G+2 method applied across all 72 homes.
Envelope, MEP, and Internal Finishes
These packages are logged as open at staggered points rather than as one uniform sweep, which is why a single site-wide percentage flattens quite different states of completion between one row and the next.
External Works, Certification, and Handover
Site-wide services and the external works fronting the fairway run in parallel with the homes themselves, leaving completion certification and a further 51.48 points of certified progress ahead of this record.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Fairway Villas 3 by Emaar at Emaar South's own record.
Buyer Position
Tracking Your Position at Fairway Villas 3 by Emaar at Emaar South
This page is one of four project resources that together cover a Fairway Villas 3 by Emaar at Emaar South purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Fairway Villas 3 by Emaar at Emaar South Construction Updates
The verified inspection record for Fairway Villas 3, tracked here from the July 2024 start onward.

Fairway Villas 3 by Emaar at Emaar South Golden Visa: Both Formats
Both formats at Fairway Villas 3 by Emaar at Emaar South, the 4 bedroom semi-detached and 5 bedroom standalone, qualify individually.
Read the Fairway Villas 3 by Emaar at Emaar South Golden Visa Guide
Fairway Villas 3 by Emaar at Emaar South: Its Mashreq Escrow
Fairway Villas 3 by Emaar at Emaar South is DLD project 2963, 72 villas escrowed with Mashreq, 48.52% certified July 2026.
Verify the Fairway Villas 3 by Emaar at Emaar South Escrow AccountApproaching Handover
Between 48.52% and Handover: What Fairway Villas 3 by Emaar at Emaar South Buyers Should Do Now
At this distance from handover the buyer work is administrative rather than physical. Nothing here involves walking a finished home; everything involves keeping paperwork aligned with a percentage that decides when money moves. Emaar tied five of this project's ten installments to certified completion at 20%, 40%, 60%, 80%, and 100%, which leaves the 48.52% reading sitting between two triggers rather than on one, and the register rather than the calendar decides when the next one lands.
First, keep the payment route confirmed before the next trigger arrives. The Fairway Villas 3 escrow account page sets out the account registered against project 2963 and what a compliant transfer looks like.
Second, read your own sale and purchase agreement against the register rather than against a date. The 60% completion trigger is the next construction-linked payment ahead, and only your agreement states how much notice you get once that reading is published.
Third, if residency is part of the plan, settle eligibility now rather than near title issuance. The Fairway Villas 3 Golden Visa eligibility guide covers how an off-plan purchase is assessed while the project is still under construction.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore Emaar South Dubai Structure
A build record is only half the picture; the other half is what is rising around it. These three pages put the 48.52% reading in its community, market, and developer context:

Emaar South Dubai Properties for Sale
Browse apartments, townhouses and villas for sale in Emaar South, with prices, payment plans and availability.
See Emaar South Dubai Properties for Sale
Emaar South Dubai Community Overview
Read the Emaar South guide: a golf community of apartments, townhouses and villas beside Al Maktoum International Airport.
Explore the Emaar South Dubai Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Fairway Villas 3 by Emaar at Emaar South Construction Updates Frequently Asked Questions
Fairway Villas 3 is an active DLD-registered project, number 2963, recorded at 48.52% construction progress at the RERA inspection of 07 July 2026. The monitoring report carrying that date closes out the enabling package, places the villa structures and foundations in their advanced band, and shows the envelope, MEP, and finishing trades opened at uneven points across the 72 plots. The record behind the figure is set out in the inspection timeline above.
The 07 July 2026 inspection recorded 48.52%, sitting 10.66 points above the 37.86% entry that precedes it in the register. Because the register prints no date against that earlier entry, those 10.66 points measure the distance between two records rather than a speed. The site report behind the current figure is published in the July 2026 Fairway Villas 3 construction update.
The handover window stated for Fairway Villas 3 is Q1 2028. Measured from the 07 July 2026 reading of 48.52%, that leaves 51.48 points of certified progress and several inspection cycles still to run before completion certification. Handover windows shift, and this page is rewritten each time a new figure enters the DLD register for project 2963.
DLD registration records show 72 villas, split between four-bedroom semi-detached homes and five-bedroom standalone homes, with a total built-up area of 31,356.37 sq m. The July 2026 monitoring report describes them as G+2 structures built in concrete and block with internal and external finishes.
Only one dated inspection sits in this record, so no velocity between two site visits can be measured. Averaged from the certified construction start of 29 July 2024 to the 48.52% reading of 07 July 2026, the derived pace works out at about 2.1 percentage points per month over roughly twenty-three months. That number is an estimate across the whole period rather than an observed rate, and the reasoning sits in the pace analysis above.
The DLD register records the certified construction start as 29 July 2024, five months after project 2963 was registered on 27 February 2024. The first dated inspection reading published against that start is the 48.52% figure of 07 July 2026, which puts roughly twenty-three months of work behind the current record.
The release divides into four-bedroom semi-detached villas and five-bedroom standalone villas, each arranged over three levels with a roof terrace, and the villas are offered in two facade colours. Layouts, plot ranges, and the wider case are covered in the Fairway Villas 3 by Emaar project guide.
The project occupies plot 4880 in Madinat Al Mataar inside the Emaar South masterplan, set out as two arcs of homes that bend with the 18-hole championship course. A single controlled entry serves both arcs, a buggy route threads between them, and exercise-equipped parkland backs the inner one. This is the third Fairway Villas phase to be registered in the community, after Fairway Villas and Fairway Villas 2.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Fairway Villas 3 by Emaar at Emaar South construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.