DAMAC · DAMAC Lagoons
Ibiza at DAMAC Lagoons Construction Updates
The DLD Register Record for 823 Balearic-Themed Townhouses off Hessa Street
Ibiza at DAMAC Lagoons read 78.88% on the DLD register on 30 September 2026, leaving envelope, services and finishes to close across 823 townhouses before handover.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Ibiza at DAMAC Lagoons at a Glance
Ibiza at DAMAC Lagoons by DAMAC is the Balearic-themed cluster of 823 townhouses inside DAMAC Lagoons, entered on the Dubai Land Department register as project 2486 and read at 78.88% on 30 September 2026. The register lists its construction start, 12 February 2022, ahead of its registration date, 21 October 2022, and the cards below show both as recorded. Because the cluster is built as hundreds of separate two and three floor homes rather than one block, that single register figure is an average across many buildings at slightly different points, matching RERA's report of the same date, which lists the finishing packages as progressing at different stages.
2486
Active
12 February 2022
823 townhouses
139,628.62 sq m
31 December 2025
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Ibiza at DAMAC Lagoons Construction Update Timeline
The Ibiza record holds one dated reading so far: 78.88% on 30 September 2026, preceded on the register by a 74.86% reading that carries no date, 4.02 points lower. Around those two figures sit three register dates, construction start on 12 February 2022, DLD registration on 21 October 2022 and a registered completion date of 31 December 2025. The track below plots both readings; the undated one has no month label, and the table lists only the dated inspection, linked to its full monthly update.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| September 2026 | 78.88% | 30 September 2026 | View the September 2026 update |
Reading the dates: the DLD register lists 31 December 2025 as the registered completion date for project 2486, and that date has passed; the latest register reading, taken on 30 September 2026, is 78.88%. The handover estimate Ibiza buyers are working to is Q2 2027. The register date is an administrative entry, so confirm the current completion date with DAMAC in writing and on Dubai REST before any payment decision.
Pace Analysis
How Fast Ibiza at DAMAC Lagoons Has Been Built
With a single dated reading on the register, the Ibiza pace can only be read as arithmetic, across the whole build and toward the stated handover quarter, rather than as a measured curve between inspections:
- Feb 2022 to Sep 2026: whole-build average, from the 12 February 2022 start to 78.88% on 30 September 2026 (1,691 days)About 1.40 points per month
- Sep 2026 to Jun 2027: arithmetic from 78.88% to 100% by 30 June 2027, the end of Q2 2027 (273 days)About 2.32 points per month
Both figures are arithmetic on a 30-day month, not a forecast, and they answer different questions. The first spreads 78.88 points evenly over 1,691 days, yet a cluster of 823 low-rise townhouses never climbs evenly: enabling works and foundations move the register in a different rhythm from the envelope, MEP, finishes and external works that RERA's 30 September 2026 report lists as progressing at different stages. The second is simply the remaining 21.12 points divided by the 273 days left in the Q2 2027 handover quarter. The undated 74.86% reading sits 4.02 points below the latest one, but without a date it cannot become a monthly rate, so the recent shape of the Ibiza curve stays unread until the next dated reading posts. For an end user planning a move, that next dated reading is what turns these averages into a measured pace; for an investor timing a resale or a first tenancy, the handover date DAMAC confirms in writing matters more than either average.
Get the Next Inspection Figure First
Tell me you are tracking Ibiza at DAMAC Lagoons and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Ibiza at DAMAC Lagoons
The register percentage measures how far 823 townhouses have moved; the project guide covers what those homes are and what buyers are tracking toward on this page:

Ibiza at DAMAC Lagoons: Balearic-Themed Townhouses
Ibiza at DAMAC Lagoons is a DAMAC cluster of 823 four and five bedroom townhouses, pairing wood with white finishes.
View the Ibiza at DAMAC Lagoons Project GuideConsidering a Late-Stage Entry?
With the superstructure reported substantially completed on 30 September 2026, the remaining Ibiza townhouses are offered against a handover estimated for Q2 2027, and availability shifts as that date approaches. If the record on this page is what brought you here, ask me what is currently available before the remaining choice narrows.
Ask About Remaining Availability on WhatsAppStage Record
Ibiza at DAMAC Lagoons Build Stages, Mapped to the Inspections
Ibiza's register carries one dated reading, so the stages below are anchored to the dates the record does hold (start, registration and the 30 September 2026 inspection) and to what RERA's report of that day says each package of the 823 townhouses had reached.
Construction Start and DLD Registration
The register dates construction start to 12 February 2022 and the project's DLD registration to 21 October 2022, both shown here exactly as recorded.
Enabling Works, Foundations and Substructure
Substantially completed per RERA's 30 September 2026 report; the register carries no dated reading from this stage, so its exact window is not on record.
Superstructure of the 823 Townhouses
The same report records the superstructure as substantially completed across a project it describes as G+2, built as a concrete structure with block walls.
Envelope, MEP, Finishes and External Works
At 78.88% on 30 September 2026, up from an undated 74.86%, internal works and infrastructure were advanced while envelope, MEP, finishes and external works progressed at different stages.
Completion, Commissioning and Handover
The last 21.12 points on the register, then DAMAC's completion notice, the 20% due on completion and handover of the townhouses, estimated for Q2 2027.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Ibiza at DAMAC Lagoons's own record.
Buyer Position
Tracking Your Position at Ibiza at DAMAC Lagoons
This page is one of four project resources that together cover a Ibiza at DAMAC Lagoons purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Ibiza at DAMAC Lagoons Construction Updates
This page: each DLD register reading for Ibiza's 823 townhouses, from the 2022 start to handover.

Ibiza at DAMAC Lagoons Golden Visa: 823 Townhouses, Both Types
Ibiza at DAMAC Lagoons, DAMAC's cluster of 823 townhouses, qualifies at both the 4 and 5 bedroom types, under Oqood now.
Read the Ibiza at DAMAC Lagoons Golden Visa Guide
Ibiza at DAMAC Lagoons Escrow: An 823-Unit Emirates NBD Account
Ibiza at DAMAC Lagoons is DLD project 2486, 823 units escrowed at Emirates NBD and 78.88% certified in September 2026.
Verify the Ibiza at DAMAC Lagoons Escrow Account
Ibiza at DAMAC Lagoons Snagging for a Balearic-Themed Cluster
Ibiza at DAMAC Lagoons is DAMAC's cluster of 823 townhouses, offered as 4 and 5 bedroom homes inside the master community.
Book Ibiza at DAMAC Lagoons SnaggingApproaching Handover
Between 78.88% and Handover: What Ibiza at DAMAC Lagoons Buyers Should Do Now
On the register, 21.12 points separate the 30 September 2026 reading from 100%, and RERA's report of that day shows the distance is made up of envelope, MEP, finishes and external works rather than new structure, so for an Ibiza owner the preparation window is already open. A handover notice usually leaves only a short period to complete the appointment and the completion payment, which is why the three steps below belong before the notice arrives, not after it.
First, arrange independent snagging so that defects across every level of your home, from roof terraces and stairs to party walls, are recorded before you accept it; the Ibiza at DAMAC Lagoons snagging page sets out the timing and the checks.
Second, set your remaining 80%, 90% and completion instalments under DAMAC's 80/20 Payment Plan against DLD-verified progress on the Ibiza at DAMAC Lagoons escrow account page, so each payment follows the register rather than a request.
Third, if residency is part of the plan, work through the Ibiza at DAMAC Lagoons Golden Visa eligibility guide before handover, because the move from Oqood to title deed shapes when and how the application is made.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore DAMAC Lagoons Structure
A register reading for one cluster says little about the community taking shape around it. These three pages set the Ibiza record in its listings, community and developer context:

DAMAC Lagoons: Mediterranean-Themed Villas, Townhouses, Apartments and Offices
DAMAC Lagoons sits opposite DAMAC Hills in Dubailand, with 11 themed clusters and 3 projects of villas, townhouses, apartments and offices.
See DAMAC Lagoons Properties for Sale
DAMAC Lagoons Community Overview
Read the DAMAC Lagoons guide: Mediterranean-themed clusters and crystal lagoons across a 45 million sq ft waterfront masterplan.
Explore the DAMAC Lagoons Community
DAMAC Properties: Lagoon Communities, Golf Villas and Branded Collaborations
Founded in 2002, DAMAC has delivered 48,000 homes and is known for large-scale master communities, luxury residential projects and branded collaborations.
View the DAMAC Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Ibiza at DAMAC Lagoons Construction Updates Frequently Asked Questions
Ibiza at DAMAC Lagoons is in its envelope, services and finishing stage: the DLD register placed project 2486 at 78.88% on 30 September 2026, and RERA's report of the same day describes the structure of its 823 townhouses as substantially completed. The register still lists the project as Active, and the stage-by-stage view is in the Ibiza stage record above.
The latest inspection, dated 30 September 2026, put Ibiza at DAMAC Lagoons at 78.88% on the DLD register, 4.02 points above the previous reading of 74.86%. The register gives no date for that earlier reading, so the step between the two cannot be expressed as a monthly figure. The full write-up of the inspection is in the Ibiza at DAMAC Lagoons September 2026 construction update.
The DLD register lists 31 December 2025 as the registered completion date for Ibiza at DAMAC Lagoons, and that date has passed with the project recorded at 78.88% on 30 September 2026. The handover estimate given to buyers is Q2 2027. The two dates come from different sources: one is a register entry for project 2486, the other is the estimate for handing over the homes. No revised registered date appears in the record reviewed for this page, so the current completion date is best confirmed with DAMAC in writing and on Dubai REST.
Ibiza at DAMAC Lagoons comprises 823 townhouses in two types. DAMAC's floor plans give the 4 bedroom home two levels, ground and first, and add a second-floor level for the 5 bedroom home, while RERA's report of 30 September 2026 describes the project as a concrete structure with block walls and internal and external finishes. Sizes and the design theme are covered in the Ibiza at DAMAC Lagoons project guide.
The DLD register records construction at Ibiza at DAMAC Lagoons as starting on 12 February 2022 and the project's registration as 21 October 2022, 251 days later. This page prints both dates exactly as the register shows them, and the dated reading it tracks from there is the 78.88% of 30 September 2026.
Averaged over the whole build, Ibiza at DAMAC Lagoons has moved about 1.40 points per month: 78.88 points in the 1,691 days from the 12 February 2022 start to the 30 September 2026 reading, on a 30-day month. Reaching 100% by 30 June 2027, the last day of the Q2 2027 handover quarter, works out at about 2.32 points per month over the remaining 273 days. Both figures are arithmetic, not a forecast, and the working is set out in the Ibiza pace analysis above.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Ibiza at DAMAC Lagoons construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.