Kore by Imtiaz Construction Updates

The Dubailand Build Record, Opened Before the First Site Works

Kore by Imtiaz holds a 0% DLD register reading from 11 August 2026, the baseline for every later inspection of its Dubai Land Residence Complex building.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

0%Construction Progress
11 August 2026Latest RERA Inspection
351 residential unitsTotal Units
Project 4549DLD Registration

Construction Snapshot

Kore by Imtiaz at a Glance

Kore by Imtiaz is a single residential building of 351 apartments in Dubai Land Residence Complex, entered in the Dubai Land Department register as project 4549 on 2 September 2026. Its record runs in an unusual order: the only inspection on file, dated 11 August 2026 and logged at 0%, came 22 days before that registration, and the registered construction start of 15 November 2026 was still ahead when this page was prepared on 26 October 2026. The cards below are the register anchors that every future reading will be set against.

DLD Project Number

4549

Project Status

Active

Construction Start

15 November 2026 (scheduled)

Total Units

351 residential units

Total Built-Up Area

18,355.05 sq m

Registered Completion Date

15 December 2028 (DLD)

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

Kore by Imtiaz Construction Update Timeline

One inspection makes up the Kore record so far: the RERA visit of 11 August 2026, which found that construction activities had not started and which the DLD register logs at 0%. That is why the track below carries a single dot at its starting edge and the table a single row, linked to the August 2026 update; further dots and rows are added as new readings are posted to the register for project 4549.

Inspection MonthConstruction ProgressInspection DateFull Update
August 20260%11 August 2026View the August 2026 update

Pace Analysis

How Fast Kore by Imtiaz Has Been Built

A points-per-month figure requires two dated readings with site works between them, and Kore has one: 0% on 11 August 2026. Until a second reading is posted, the pace of this build is framed by four dates already fixed in the register:

  • 11 Aug 2026: RERA inspection, no construction activities started at the time of the visit0% baseline
  • 2 Sep 2026: project 4549 registered with the DLD, 22 days after that inspectionRegistered
  • 15 Nov 2026: registered construction start date in the DLD registerScheduled
  • 15 Dec 2028: registered completion date, inside the quarter Imtiaz targets for handoverQ4 2028

What those dates describe is the size of the window, not the speed through it. Between the scheduled start and the registered completion the register allows 25 months for a basement, a ground floor, three podium levels, 13 residential floors and a roof level to move from 0% to handover readiness, with no site history yet to show how that window will be used. The first reading that shows movement from the August baseline, and the gap between it and the next, will be the earliest real evidence of Kore's delivery rhythm. For an end user, that leaves Q4 2028 as a developer target with no build record behind it so far; for an investor, it means a purchase today is priced on the plan rather than on progress.

Get the Next Inspection Figure First

Tell me you are tracking Kore by Imtiaz and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About Kore by Imtiaz at Dubai Land Residence Complex

A 0% reading says nothing about what the 351 apartments will be. The full project guide covers what this record is tracking toward:

Kore by Imtiaz in Dubai Land Residence Complex project rendering of residential towers and landscaped community grounds in Dubai - Presented by Tohid Fetrat

Kore by Imtiaz: Furnished Wellness Apartments in Dubailand

Kore by Imtiaz holds 351 furnished apartments in Dubai Land Residence Complex, planned around three pillars: Train, Nourish and Recover.

View the Kore by Imtiaz Project Guide

Considering a Pre-Construction Entry?

Kore is listed with limited units available while the building sits at its 0% baseline, and availability can shift as the scheduled start approaches. If the record on this page is what brought you here, ask me what is available now.

Ask About Remaining Availability on WhatsApp

Stage Record

Kore by Imtiaz Build Stages, Mapped to the Inspections

With a single reading on file, only the first two stages below carry dates that have already passed; the third carries the register's scheduled start, and the last two will be dated from the inspections that record them, so you can see exactly how far the Kore record reaches today.

11 Aug 2026 at 0%

Baseline Inspection

The RERA visit of 11 August 2026 found that no construction activities had started on the plot, and the DLD register logged it at 0%.

Current Phase2 Sep 2026 to 15 Nov 2026

Registration and Pre-Start Window

Project 4549 was registered on 2 September 2026 with a First Abu Dhabi Bank trust account; the August baseline was still the latest reading on 26 October 2026.

From 15 Nov 2026, scheduled

Basement and Ground Level

The registered construction start of 15 November 2026 opens this stage; the readings posted after it are the first that can show movement from 0%.

Not yet recorded

Podium and 13 Residential Floors

The three podium levels and the 13 residential floors above them have no inspection window yet; this stage is dated once readings record it.

Toward 15 Dec 2028

Roof Level, Furnishing, and Handover

The roof level, the fit-out of the furnished apartments and handover close the record: Q4 2028 per Imtiaz, 15 December 2028 in the register.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Kore by Imtiaz's own record.

Buyer Position

Tracking Your Position at Kore by Imtiaz

This page is one of four project resources that together cover a Kore by Imtiaz purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Kore by Imtiaz in Dubai Land Residence Complex construction updates cover image featuring a project rendering of residential towers and landscaped community surroundings in Dubai - Presented by Tohid Fetrat
You Are Here

Kore by Imtiaz Construction Updates

This page: the register record for Kore by Imtiaz, opened at 0% on 11 August 2026.

Kore by Imtiaz in Dubai Land Residence Complex Golden Visa concept graphic with a gold card beside a rendering of residential towers in Dubai - Presented by Tohid Fetrat

Kore by Imtiaz Golden Visa: Every Apartment Against the AED 2M Line

Kore by Imtiaz, 351 residences in Dubai Land Residence Complex, has no studio, 1 or 2 bedroom that clears the threshold.

Read the Kore by Imtiaz Golden Visa Guide
Kore by Imtiaz in Dubai Land Residence Complex escrow account concept graphic featuring a shield and padlock alongside a rendered residential building in Dubai - Presented by Tohid Fetrat

Kore by Imtiaz Escrow: A First Abu Dhabi Bank Account, Newly Opened

Kore by Imtiaz is DLD project 4549, its 351 units paying First Abu Dhabi Bank escrow, 0% certified August 2026.

Verify the Kore by Imtiaz Escrow Account

Approaching Handover

Between 0% and Handover: What Kore by Imtiaz Buyers Should Do Now

At 0% there is nothing on the Kore plot to inspect for quality yet, so the useful work for a buyer is on paper: where the money goes, what residency it can or cannot support, and what exactly the contract describes. Under both the 50/50 and the 60/40 post-handover plans only the 20% booking payment has fallen due so far, and the first dated instalment, 5% on 15 February 2027 in Imtiaz's indicative calendar, is the point by which the three steps below should already be settled.

First, make sure every payment goes to the project 4549 trust account at First Abu Dhabi Bank; the Kore by Imtiaz escrow account page shows how to check it against the DLD record before any money moves.

Second, if residency is part of the plan, read the Kore by Imtiaz Golden Visa guide before you commit, since no single Kore apartment reaches the AED 2M ≈ USD 545K property threshold at current prices.

Third, match your sale and purchase agreement against the unit type, size and plan set out on the Kore by Imtiaz project page, including whether 40% of the price falls after handover under the 60/40 option.

Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore Dubai Land Residence Complex Structure

A pre-construction record is mostly context. These three pages show the community Kore is planned for, the homes it competes with, and the developer whose other projects stand in for a build history that does not exist yet:

Dubailand Residence Complex properties for sale in Dubai showing a modern residential building with balconies and landscaped surroundings, Presented by Tohid Fetrat

Dubai Land Residence Complex: Nine Imtiaz Apartment Projects in Dubailand

Dubai Land Residence Complex, Dubai Holding's freehold community, lists nine Imtiaz apartment projects with 50/50, 60/40 and post-handover plans.

See Dubai Land Residence Complex Properties for Sale
Street view of Dubailand Residence Complex community in Dubai showing modern residential buildings, landscaped roads and pedestrian areas, Presented by Tohid Fetrat

Dubai Land Residence Complex: Dubailand's Established Apartment Community

Dubai Land Residence Complex has 49 occupied buildings, 140 open retail outlets and four community parks, with new towers rising.

Explore the Dubai Land Residence Complex Community
Exterior view of INARA by Imtiaz featuring a contemporary luxury residential tower with elegant balconies, refined façade design, and landscaped surroundings in Dubai, Presented by Tohid Fetrat

Imtiaz Developments: Fully Furnished Residences in Dubai Islands, JVC and Meydan

Imtiaz Developments, founded in 2011, has completed and under-construction design led residential projects in Meydan, JVC and Dubai Islands.

View the Imtiaz Developments Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

Kore by Imtiaz Construction Updates Frequently Asked Questions

Kore by Imtiaz is an active, off-plan project in the Dubai Land Department register (number 4549) at the pre-construction stage, with a 0% reading dated 11 August 2026 and a registered construction start scheduled for 15 November 2026. The full record is in the inspection timeline above.

The latest reading for Kore by Imtiaz is 0%, from the inspection of 11 August 2026, and it is also the first one on record, so there is no earlier figure to measure a change against. The site report for that visit is in the Kore by Imtiaz August 2026 construction update.

No built progress is on record for Kore by Imtiaz: the only inspection, on 11 August 2026, found that construction activities had not started, and the DLD register logged it at 0%. Every image of the building published on this page is a developer rendering of the planned design.

The DLD register carries a registered completion date of 15 December 2028 for project 4549, which falls inside Q4 2028, the handover quarter Imtiaz states for Kore, so the two dates agree as of 26 October 2026. With the record still at the 0% reading of 11 August 2026, either date can be revised, and this page's record is updated whenever the register changes.

Kore by Imtiaz is registered with 351 residential units, made up of studio, one-bedroom and two-bedroom apartments in one building, a count the DLD register showed alongside the 0% reading of 11 August 2026. The register does not give a figure split by unit type.

B+G+3P+13+R is the register description of Kore by Imtiaz: one basement, a ground floor, three podium levels, 13 residential floors and a roof level, all in a single residential building. That full height is still ahead of the record, which stood at 0% on 11 August 2026; the stage record above shows which levels have dated readings.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the Kore by Imtiaz construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.