Imtiaz · Dubai Land Residence Complex · Construction Update
Le Blanc by Imtiaz Construction Update - October 2026
October 2026 DLD Register Reading Places Le Blanc by Imtiaz at 5.95% in Dubai Land Residence Complex
Mobilization, enabling and piling works were ongoing as RERA inspected Le Blanc on 8 October 2026; the DLD register reads 5.95%, and the image is a rendering.
Direct advisor access. Every message answered personally, never by a call center.
DLD Register Inspection Data
Le Blanc by Imtiaz Construction Snapshot
A 2.54 point rise on the previous DLD register reading of 3.41%, a reading the register shows without a date, brings Le Blanc by Imtiaz to 5.95% on 8 October 2026 and places the tower in the enabling and foundations stage, where the record is most useful for checking where your instalments are held.
Le Blanc by Imtiaz
4174
Active
5.95%
8 October 2026
15 January 2026
323 residential units
21,013.13 sq m
Q2 2028
Data source: the Dubai Land Department project register (inspection report card dated 8 October 2026), read with the RERA Independent Progress Monitoring Report for the same inspection, which records site activity and prints no percentage. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. The hero image is a developer rendering of the project, not a site photograph. Last updated: October 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Le Blanc by Imtiaz Construction Progress Summary
RERA's Independent Progress Monitoring Report for the 8 October 2026 inspection records mobilization ongoing at Le Blanc, with enabling and piling works ongoing as well, and gives the progress status as Main Contract, Progressing. Those are site-setup and below-ground packages, and because the register weights work by stage they carry a small share of the total: 266 days after the 15 January 2026 construction start, the reading stands at 5.95%.
- DLD project registration on 15 December 2025, project 4174
- Registered construction start on 15 January 2026
- Escrow trust account with Ajman Bank named on the record
- Site mobilization, ongoing at the 8 October 2026 inspection
- Enabling works across the tower plot
- Piling works ongoing
- Main contract recorded as progressing
- Basement, ground floor and three podium parking levels
- 17 residential floors holding the 323 apartments
- Rooftop amenity floor with gym, clubhouse and pool
- Handover scheduled for Q2 2028
Payment Linked Progress
What 5.95% Progress Means for Le Blanc Buyers
Le Blanc's payment plan runs on calendar dates rather than construction milestones, so the register reading and the instalments move on separate tracks. Under the developer's published 60/40 plan, 30% of the price had been called by the 8 October 2026 reading, with the 10% instalment of 15 October 2026 seven days away, and by 26 October 2026 40% had fallen due. A further 20% falls due across three dated instalments to 15 November 2027, then 40% on completion. At 5.95%, four actions matter most.
Verify the escrow account
Every instalment ahead of handover should go only to the DLD regulated escrow account registered for project 4174 with Ajman Bank. Le Blanc by Imtiaz escrow account verification is the step before any transfer; the lookup takes about two minutes against the official DLD project record, where the register name is Le Blanc Residence By Imtiaz.
Reread your SPA payment schedule
Check how your sale and purchase agreement sets out the dated instalments, the completion payment and the handover notice period, and map those clauses against the Q2 2028 handover. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the register readings.
Confirm your Oqood registration
Off plan purchases in Dubai are recorded on the Dubai Land Department's interim register, known as Oqood, once the SPA is signed and the registration fee is settled. At this early stage, confirm that your Le Blanc unit is registered in your name under project 4174 and keep the Oqood record with your SPA: it ties every dated instalment to a specific unit.
Track each register reading
With 94.05 points still to be recorded, many inspection readings lie between this one and handover. Le Blanc by Imtiaz construction updates collects each dated reading as it is posted.
General framework, not legal advice: instalment dates, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 5.95%?
Entering Le Blanc at this stage means accepting a longer wait in exchange for developer starting prices and the remaining instalment runway: on site the work is enabling and piling, handover is under two years away in Q2 2028, and instalments whose dates have passed are settled at signing, per the developer's current terms. Every payment goes to the DLD-registered escrow account for project 4174, released against inspected construction progress.
- Developer starting prices, from AED 690K ≈ USD 188K
- Under two years to the Q2 2028 handover
- 20% in three dated instalments to November 2027, then 40% on completion
- Most construction risk retired before you commit
- Months rather than years to the keys
- Shorter instalment runway, priced by later releases or resale
Limited Units Available on the project page as of this update; availability shifts between cycles.
About the Development
Le Blanc by Imtiaz Project Details

With enabling and piling works ongoing at the 8 October 2026 inspection, Le Blanc by Imtiaz is a foundations-stage tower of 323 studio, 1, 2 and 3 bedroom apartments, configured by Imtiaz as 2B+G+3P+17+R. Starting prices: AED 690K ≈ USD 188K.
For buyers entering at this stage, the trade off is a wait of under two years against a schedule that places 60% before completion, with handover expected in Q2 2028.
Le Blanc by Imtiaz Project GuideSite Context This Cycle
Explore Le Blanc by Imtiaz Location on Dubai Map
Le Blanc by Imtiaz occupies a single tower plot inside Dubai Land Residence Complex, where the developer's location map places it at a junction of the community's internal roads among mid-rise apartment buildings. On a plot set within an existing street grid, the first packages are the ones the 8 October 2026 inspection recorded: mobilization, enabling works and piling, the below-ground work that comes before the basement and podium levels can rise.
The district's road links are in place: Dubai-Al Ain Road (E66) and Emirates Road (E611) adjoin the community, with Dubai Academic City and Dubai Outlet Mall beside it. For Le Blanc buyers at this stage, the location case can be judged on the ground today, while the building case rests on the register readings that follow until handover in Q2 2028. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Le Blanc by Imtiaz During Early Construction
The enabling and foundations stage is where payment protection, registration and residency planning are set up for the years ahead. Each resource below is matched to where Le Blanc stands at 5.95%.

Le Blanc by Imtiaz Construction Updates
This page: the October 2026 DLD register reading for Le Blanc, with recorded site works.

Le Blanc by Imtiaz Golden Visa: No Apartment Reaches the Line
Le Blanc, Imtiaz's 323-residence tower in Dubai Land Residence Complex, keeps every apartment, studio to 3 bedroom, below the threshold.
Read Le Blanc Golden Visa Guide
Le Blanc by Imtiaz Escrow: The Ajman Bank Account
Ajman Bank holds Le Blanc by Imtiaz escrow, DLD project 4174, 323 units, certified 5.95% in October 2026.
Verify Le Blanc Escrow AccountUpdate Timeline
Other Le Blanc by Imtiaz Construction Updates
October 2026 is the first monthly report for Le Blanc by Imtiaz; each later DLD register reading joins the record here as it is posted.
Where This Update Fits
Explore the Le Blanc by Imtiaz Wider Picture
Le Blanc's 5.95% reading sits inside a wider picture: what is listed for sale around it in Dubai Land Residence Complex, how that community works day to day, and the developer behind the tower.

Dubai Land Residence Complex: Nine Imtiaz Apartment Projects in Dubailand
Dubai Land Residence Complex, Dubai Holding's freehold community, lists nine Imtiaz apartment projects with 50/50, 60/40 and post-handover plans.
See Dubai Land Residence Complex Properties for Sale
Dubai Land Residence Complex: Dubailand's Established Apartment Community
Dubai Land Residence Complex has 49 occupied buildings, 140 open retail outlets and four community parks, with new towers rising.
Explore the Dubai Land Residence Complex Community
Imtiaz Developments: Fully Furnished Residences in Dubai Islands, JVC and Meydan
Imtiaz Developments, founded in 2011, has completed and under-construction design led residential projects in Meydan, JVC and Dubai Islands.
View the Imtiaz Developments Developer ProfileFAQs
Le Blanc by Imtiaz Construction Progress in October 2026: Frequently Asked Questions
The Dubai Land Department project register shows Le Blanc by Imtiaz, project 4174, at 5.95% on an inspection report card dated 8 October 2026, with 3.41% listed as the previous inspection. The RERA inspection report for the same date prints no percentage of its own, so 5.95% is a DLD register reading.
Handover is scheduled for Q2 2028 in the developer's documents, while the DLD register, as of the 8 October 2026 record, lists the later 15 October 2028 as the registered completion date, set at registration. Registered dates and developer schedules can differ, so confirm the current schedule with Imtiaz. Registered dates can be revised between inspection cycles, and any change would appear in a later monthly update; how readings lead up to completion is explained on the Le Blanc by Imtiaz construction updates page.
The register does not say. The 8 October 2026 report card lists 3.41% as the previous inspection but shows no date for it, so this page plots it as an undated dot and calculates no pace from the two readings. Only the 5.95% reading carries a date.
The RERA Independent Progress Monitoring Report for the 8 October 2026 inspection records mobilization ongoing at the time of inspection, with enabling and piling works ongoing as well, and gives the progress status as Main Contract, Progressing. The report also carries inspection photographs, which are kept as record documents rather than published here.
The DLD register lists the project as registered on 15 December 2025 and construction as started on 15 January 2026. Both dates precede the first dated instalment of the developer's 60/40 plan on 15 February 2026, and the 5.95% reading of 8 October 2026 was recorded 266 days after the start date.
No. It is a developer rendering of Le Blanc, supplied for this update, and it shows design intent rather than site progress. Progress on 8 October 2026 is described by the RERA inspection notes: mobilization, enabling works and piling.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the October 2025 inspection record for Le Blanc by Imtiaz correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.