Imtiaz · Dubai Land Residence Complex
Le Blanc by Imtiaz Construction Updates
The Dated Register Record of a Single Dubailand Tower, From Piling Works to Q2 2028
Le Blanc by Imtiaz read 5.95% in the DLD register on 8 October 2026, an opening dated figure, set during piling, that anchors every later Dubailand reading.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Le Blanc by Imtiaz at a Glance
A single 323-apartment tower in Dubai Land Residence Complex, Le Blanc by Imtiaz entered the DLD register as project 4174 on 15 December 2025, and construction started on 15 January 2026. Its record is young: 266 days separate that start from its only dated reading, 5.95% on 8 October 2026, and handover is scheduled for Q2 2028. Because the tower occupies a single plot among the community's existing mid-rise buildings rather than one phase of a larger masterplan, every figure on this page measures one building and nothing else.
4174
Active
15 January 2026
323 residential units
21,013.13 sq m
15 October 2028 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Le Blanc by Imtiaz Construction Update Timeline
So far the Le Blanc record holds one dated DLD register reading, 5.95% on 8 October 2026, plus an earlier 3.41% that the register lists as the previous inspection without giving its date. That leaves 2.54 points between the two figures, but an undated reading cannot be placed on a calendar, so it sits on the track below as an unlabelled dot and takes no row in the table. The October 2026 row opens the monthly update holding the RERA site notes for that inspection.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| October 2026 | 5.95% | 8 October 2026 | View the October 2026 update |
Pace Analysis
How Fast Le Blanc by Imtiaz Has Been Built
With a single dated reading, the Le Blanc pace can only be framed by calendar arithmetic for now. Three figures bracket it, all worked on 30-day months and all arithmetic, not a forecast:
- 15 Jan 2026 to 8 Oct 2026: average since the registered start, 5.95 points over 266 daysAbout 0.67 points per month
- 8 Oct 2026 to 30 Jun 2028: rate implied to reach 100% by the end of Q2 2028, the developer's handover target, 94.05 points over 631 daysAbout 4.47 points per month
- 8 Oct 2026 to 15 Oct 2028: rate implied to reach 100% by the registered completion date, 94.05 points over 738 daysAbout 3.82 points per month
There is no curve to read yet, only a starting slope. The register's undated 3.41% cannot be turned into a monthly rate, so none of the figures above is a measured pace between inspections. Read together, they say more about stage than about speed: the register weights work by package, and the mobilization, enabling and piling recorded at Le Blanc on 8 October 2026 carry a small share of a tower whose developer plans still hold basement and podium levels, seventeen apartment floors and a rooftop amenity deck above them. For an end user, the dated readings that follow the piling stage will show when those lower levels begin to register; for an investor, a run of dated readings is what will turn this arithmetic into a measured pace ahead of the Q2 2028 handover.
Get the Next Inspection Figure First
Tell me you are tracking Le Blanc by Imtiaz and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Le Blanc by Imtiaz at Dubai Land Residence Complex
A 5.95% reading only means something against what the register is counting toward. The project guide sets out the building this record follows:

Le Blanc by Imtiaz, a Dubailand Tower with a Rooftop Amenity Floor
Le Blanc by Imtiaz is one residential tower of 323 studio to three bedroom apartments over 17 floors in Dubailand.
View the Le Blanc by Imtiaz Project GuideConsidering an Early-Stage Entry?
Le Blanc is listed with limited units available, and early-stage inventory can move between one register reading and the next. If the 5.95% record is what brought you here, ask me what is open today and how the instalments that have fallen due would be settled at signing under the developer's current terms.
Ask About Remaining Availability on WhatsAppStage Record
Le Blanc by Imtiaz Build Stages, Mapped to the Inspections
Each stage below is tied to the dates Le Blanc actually holds: registration in December 2025, a January 2026 start, the 5.95% reading of 8 October 2026 and a registered completion date of 15 October 2028. Stages with no reading against them yet are marked as ahead, so the record never runs past the evidence.
Registration and Start
DLD project 4174 was registered on 15 December 2025, with Ajman Bank named as trust account bank, and construction started on 15 January 2026.
Mobilization, Enabling and Piling
RERA's report of 8 October 2026 found mobilization, enabling works and piling all in progress, main contract progressing, against a register reading of 5.95%.
Basement and Podium Levels
The basement levels, ground floor and three parking podiums in the developer's 2B+G+3P+17+R configuration have no register reading against them yet.
Residential Floors and Rooftop
Seventeen residential floors holding the 323 apartments, with the rooftop floor above them planned for the gym, clubhouse and pool.
Finishing, Commissioning and Handover
Apartment finishing and building systems ahead of the Q2 2028 handover the developer targets, with the DLD register recording the later 15 October 2028 as the registered completion date.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Le Blanc by Imtiaz's own record.
Buyer Position
Tracking Your Position at Le Blanc by Imtiaz
This page is one of four project resources that together cover a Le Blanc by Imtiaz purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Le Blanc by Imtiaz Construction Updates
This page: every dated DLD register reading for Le Blanc by Imtiaz, from 5.95% to handover.

Le Blanc by Imtiaz Golden Visa: No Apartment Reaches the Line
Le Blanc, Imtiaz's 323-residence tower in Dubai Land Residence Complex, keeps every apartment, studio to 3 bedroom, below the threshold.
Read the Le Blanc by Imtiaz Golden Visa Guide
Le Blanc by Imtiaz Escrow: The Ajman Bank Account
Ajman Bank holds Le Blanc by Imtiaz escrow, DLD project 4174, 323 units, certified 5.95% in October 2026.
Verify the Le Blanc by Imtiaz Escrow AccountApproaching Handover
Between 5.95% and Handover: What Le Blanc by Imtiaz Buyers Should Do Now
With piling recorded and only one dated reading on file, what a Le Blanc buyer controls today is paperwork rather than progress. The developer's 60/40 plan runs on calendar dates, not register readings: 40% of the price had fallen due by 26 October 2026, and the next 5% instalment is dated 15 February 2027, so the three steps below belong before that date rather than after it.
First, tie every transfer to the trust account named on the register; the Le Blanc by Imtiaz escrow account page shows how to confirm the Ajman Bank account for project 4174 before money leaves your bank.
Second, settle the residency question while the unit choice is still open, setting each apartment price, from AED 690K ≈ USD 188K to AED 1.795M ≈ USD 489K, against the property threshold in the Le Blanc by Imtiaz Golden Visa guide.
Third, recheck the unit and plan you signed on the Le Blanc by Imtiaz project page, where the layouts, the rooftop amenity floor and both payment options show what the next two years of readings are building toward.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore Dubai Land Residence Complex Structure
One tower's register record is half the picture; the other half is the community around the plot and the developer building it. These three pages set the Le Blanc readings in that context:

Dubai Land Residence Complex: Nine Imtiaz Apartment Projects in Dubailand
Dubai Land Residence Complex, Dubai Holding's freehold community, lists nine Imtiaz apartment projects with 50/50, 60/40 and post-handover plans.
See Dubai Land Residence Complex Properties for Sale
Dubai Land Residence Complex: Dubailand's Established Apartment Community
Dubai Land Residence Complex has 49 occupied buildings, 140 open retail outlets and four community parks, with new towers rising.
Explore the Dubai Land Residence Complex Community
Imtiaz Developments: Fully Furnished Residences in Dubai Islands, JVC and Meydan
Imtiaz Developments, founded in 2011, has completed and under-construction design led residential projects in Meydan, JVC and Dubai Islands.
View the Imtiaz Developments Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Le Blanc by Imtiaz Construction Updates Frequently Asked Questions
Le Blanc by Imtiaz is an active DLD project, number 4174, at an early stage of construction: the Dubai Land Department register reads 5.95% as of 8 October 2026, and RERA's report for that date records the main contract as progressing. The full record is in the inspection timeline above.
The latest reading is 5.95%, dated 8 October 2026 in the Dubai Land Department project register, which also lists 3.41% as the previous inspection without a date. Because only the 5.95% figure is dated, it is the single row in this page's timeline; the site notes for that inspection are in the Le Blanc by Imtiaz October 2026 construction update.
Progress at Le Blanc by Imtiaz is tracked through the Dubai Land Department register for project 4174, which posted a 5.95% reading on 8 October 2026 after RERA's inspection that day. RERA's Independent Progress Monitoring Report describes the site works but prints no percentage, so every figure here is a DLD register reading, added to this record with its date as each new one is posted.
They are separate dates from separate sources. Imtiaz targets handover of Le Blanc by Imtiaz in Q2 2028 in its developer documents, while the DLD register records the later 15 October 2028 as the registered completion date, set at registration and not lapsed as of the 8 October 2026 reading of 5.95%. Registered dates and developer schedules can differ, so confirm the current schedule with Imtiaz. A registered date can be revised in the register, and this page's record is updated whenever a new dated reading or date appears.
Le Blanc by Imtiaz will include 323 residences, the unit count shown in the DLD register for project 4174, made up of studio, 1, 2 and 3 bedroom apartments on 17 residential floors. As of 8 October 2026 the tower was recorded at 5.95%, so none of those floors is part of the register reading yet.
No measured pace exists yet, because the only dated reading is 5.95% on 8 October 2026. As arithmetic, not a forecast, that reading averages about 0.67 points per month over the 266 days since the 15 January 2026 start, while reaching 100% by the 15 October 2028 registered completion date implies about 3.82 points per month over 738 days, and reaching it by the end of Q2 2028, the developer's handover target, implies about 4.47 points per month over 631 days. The full working is in the pace analysis above.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Le Blanc by Imtiaz construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.