Lotus at Dubai Creek Harbour Construction Update - October 2024

DLD Register Records Lotus at Dubai Creek Harbour at 100% Construction Progress on 4 October 2024

Building works substantially completed, BCC and DCD issued, DEWA meters installed: the 4 October 2024 register reading puts Lotus at 100 percent across four Creek Beach buildings.

Direct advisor access. Every message answered personally, never by a call center.

100%Construction Progress
4 October 2024Inspection Date
ReadyHandover Status
2377DLD Project Number

Verified DLD Inspection Data

Lotus at Dubai Creek Harbour Construction Snapshot

A 5.44 point rise from the previous register reading of 94.56% took Lotus to 100% on 4 October 2024, closing out the handover band: from this reading on, the open questions concern certificates, completion payments and the condition of individual apartments rather than construction pace.

Project Name

Creek Beach - Lotus

Project Number

2377

Project Status

Finished

Construction Progress

100%

Inspection Date

4 October 2024

Construction Start

05 March 2022

Total Units

270 units

Total Built Area

336,531.98 sq m

Expected Completion

30 September 2025

Data source: the DLD project register reading dated 4 October 2024 and the Independent Progress Monitoring Report of the same date, which records Progress Status Completed. The register gives no date for the previous reading of 94.56%. At the 23 September 2026 build of this page the 4 October 2024 reading is 719 days old, and it is the latest reading the supplied register record shows. The hero image is a project rendering, not site photography. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: September 2026.

Want to hear if the Lotus register record changes after this reading? Message me on WhatsApp and I will send it to you directly: one message per register change, nothing else. Message me on WhatsApp

This Inspection Cycle

Lotus at Dubai Creek Harbour Construction Progress Summary

The October 2024 cycle is the one in which Lotus stopped being a construction site on paper: the register stepped from 94.56% to 100%, and the inspection notes describe a project handing over rather than building. Because the earlier figure carries no date, this report records the size of the step, 5.44 points, and draws no pace or monthly rate from it.

Completed
  • Building 1 (G+M+6) and Building 2 (G+M+11)
  • Building 3 (G+M+10) and Building 4 (G+M+7)
  • All building construction activities substantially completed, per the IPMR
  • BCC and DCD issued by the relevant authority, per the IPMR
Recorded at 100%
  • Construction progress of 100% in the DLD register on 4 October 2024
  • IPMR Progress Status: Completed
  • All DEWA meters installed across the site
  • Register status now reads Finished for all 270 units
After the 100% Reading
  • Handover status: Ready
  • Unit by unit acceptance, each apartment inspected on its own merits
  • Transfer and title registration at the Dubai Land Department
Next inspectionNone expected: at 100% and status Finished, the register lists no reading after 4 October 2024.
Registered completion30 September 2025 as the registered completion date in the DLD record; the 100% reading was logged on 4 October 2024.
Remaining distanceZero percentage points: the 4 October 2024 reading closed the final 5.44 points to 100%.

Payment Linked Progress

What 100% Progress Means for Lotus Buyers

Lotus launched on a 70/30 plan that tied its last 30% to 100% construction completion, so the October 2024 reading was the trigger point for launch buyers and is the baseline behind every ready apartment sold since. Four checks follow from it.

Before Any Transfer

Confirm the project record

Match project 2377 and its Finished status against the official DLD project record, a lookup of about two minutes, before any money moves. Launch payments ran through the DLD regulated escrow account for the project, and the Lotus at Dubai Creek Harbour escrow account guide explains what that history means for a ready purchase.

Before Final Settlement

Reread your SPA completion clauses

Check how your sale and purchase agreement tied the final 30% and the handover notice to completion, and set those clauses against the 4 October 2024 reading. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the certified milestones.

Before Key Collection or Transfer

Inspect your specific apartment

A 100% reading describes the four buildings, not the condition of any single unit inside them. The Lotus at Dubai Creek Harbour snagging inspection guide covers how an independent inspection documents one apartment before you accept it.

Before Relying on This Reading

Recheck the register

This reading was 719 days old when the page was built in September 2026. The Lotus at Dubai Creek Harbour construction updates hub holds the wider completion record, and the DLD register stays the source to recheck.

General framework, not legal advice: completion instalments, notice periods, and fee obligations are defined by each buyer's SPA and by the DLD record, and both should be read at source.

Buying at 100%?

At Lotus, entry timing no longer trades against construction risk: the four buildings are finished, and the decision now sits between specific ready apartments, their floors and their outlooks. Launch payments went to the DLD-registered escrow account for project 2377, released against certified construction progress, a sequence that reached 100% on 4 October 2024.

Entering Now at 100%
  • Status Finished in the DLD register, BCC and DCD issued per the October 2024 IPMR
  • Handover status Ready: no construction wait before living in or letting the apartment
  • Settled around transfer, in full or with a mortgage on the completed unit
Typical Launch Entry
  • Delivery risk carried from groundbreaking onward
  • A multi-year wait before keys, occupancy, or rental income
  • Instalments spread across the build at launch pricing
AED 1.70M ≈ USD 463KStarting Price
Ready PurchasePaid in Full or by Mortgage
ReadyHandover Status
Ask What Is Available at Lotus

Limited units available per the Lotus project page as of this update; availability shifts over time and is confirmed unit by unit.

About the Development

Lotus at Dubai Creek Harbour Project Details

Lotus at Dubai Creek Harbour by Emaar Properties overlooking the landscaped community plaza with residential buildings, palm trees, and a central fountain in Dubai Presented by Tohid Fetrat
Creek Beach · Emaar

Recorded at 100% on 4 October 2024 and now listed as Finished, Lotus holds 270 units of 1, 2 and 3 bedroom apartments across four mid-rise buildings that close around one inner plaza in Creek Beach. Starting prices: AED 1.70M ≈ USD 463K.

Buying at this stage gives up launch pricing and a long instalment runway in return for a finished apartment you can walk through before committing, with handover status Ready.

Lotus at Dubai Creek Harbour Project Guide

Site Context at Completion

Explore Lotus at Dubai Creek Harbour Location on Dubai Map

Lotus stands on plot 169 in Al Khairan First, the register location for this corner of Creek Beach, with Rosewater and Grove as its neighbours on the masterplan map. Its four buildings face inward onto a shared plaza on a single site, which is why the October 2024 inspection reads as one finish across the cluster: the IPMR notes all building construction activities substantially completed and all DEWA meters installed.

Around it, Dubai Creek Harbour is Emaar's eight square kilometre waterfront masterplan, with Burj Khalifa about 10 minutes by car, Dubai International Airport about 15 and Creek Marina Yacht Club about 5, and the 700 metre Creek Beach inside the same district. After a 100% reading, that setting is what an owner-occupier or tenant is paying for, because a finished apartment can be lived in or let straight away. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Lotus at Dubai Creek Harbour by Emaar on Dubai Map

Buyer Resources for This Project

Investing in Lotus at Dubai Creek Harbour After Construction Completion

With construction complete, what remains to check is residency eligibility, the escrow history, and the condition of each apartment. Each resource below is matched to where Lotus stands after the October 2024 reading.

Lotus at Dubai Creek Harbour by Emaar Properties in Dubai Creek Harbour construction updates cover image featuring a project rendering of residential buildings surrounding a landscaped lawn with palm trees and residents in Dubai - Presented by Tohid Fetrat
You Are Here

Lotus October 2024 Construction Update

This page: the October 2024 DLD register reading of 100% for Lotus, dated and explained.

Lotus at Dubai Creek Harbour by Emaar Properties in Dubai Creek Harbour Golden Visa card graphic above a palm-lined pedestrian promenade with fountains and residential buildings in Dubai - Presented by Tohid Fetrat

Lotus at Dubai Creek Harbour Golden Visa: 270 Creek Beach Units

Lotus at Dubai Creek Harbour, Emaar's 270-unit Creek Beach community, qualifies at 2 and 3 bedrooms; 1 bedroom apartments do not.

Read the Lotus Golden Visa Guide
Lotus at Dubai Creek Harbour by Emaar Properties in Dubai Creek Harbour escrow account protection concept with shield and padlock icons above a landscaped pool courtyard and residential buildings in Dubai - Presented by Tohid Fetrat

Lotus at Dubai Creek Harbour Escrow: Dubai Islamic Bank's Creek Record

Dubai Islamic Bank held escrow for Lotus at Dubai Creek Harbour, DLD project 2377: 270 units, 100% certified October 2024.

Verify the Lotus Escrow Account
Lotus at Dubai Creek Harbour by Emaar Properties in Dubai Creek Harbour snagging inspection graphic over a furnished living and dining room with blue seating, built-in shelving, plants, and pendant lights in Dubai - Presented by Tohid Fetrat

Lotus at Dubai Creek Harbour Snagging From G+M+6 to G+M+11

Lotus at Dubai Creek Harbour is an Emaar community of 270 apartments in four mid-rise buildings that face a shared plaza.

Book a Lotus Snagging Inspection

Update Timeline

Other Lotus at Dubai Creek Harbour Construction Updates

October 2024 is the only dated Lotus reading in the register, and the construction updates hub places it in the wider completion record of the four buildings.

All Lotus at Dubai Creek Harbour Construction Updates

FAQs

Lotus at Dubai Creek Harbour Construction Progress in October 2024: Frequently Asked Questions

The DLD project register records Lotus at Dubai Creek Harbour, project 2377, at 100% construction progress on 4 October 2024, up 5.44 points from a previous register reading of 94.56% that carries no date. The Independent Progress Monitoring Report of the same date sets the Progress Status to Completed and notes that all building construction activities were substantially completed.

Yes. The Independent Progress Monitoring Report dated 4 October 2024 states that the DCD and BCC had been issued by the relevant authority and that all DEWA meters were installed. The BCC is the building completion certificate, and together with the DCD it is one of the sign-offs a new Dubai building normally needs before occupation. The report gives neither an issue date nor the name of the issuing body, so exact dates have to come from the certificates themselves.

The 4 October 2024 reading is 719 days old, about twenty-three and a half months, at the 23 September 2026 build of this page, and it is the latest reading in the register record supplied for this update, with the project status now shown as Finished. Register entries can be revised, so project 2377 should be checked against the official DLD record before any decision rests on this figure. The wider completion record is kept on the Lotus at Dubai Creek Harbour construction updates hub.

The October 2024 Independent Progress Monitoring Report covers all four Lotus buildings: Building 1 at G+M+6, Building 2 at G+M+11, Building 3 at G+M+10 and Building 4 at G+M+7, where G is the ground floor and M a mezzanine level above it. Its completion notes apply to the project as a whole rather than building by building, and the DLD register counts 270 units across the four.

Lotus launched on a 70/30 plan in which the final 30% fell due on 100% construction completion, so the 4 October 2024 reading is the register milestone that last instalment was tied to. The exact due date for each launch buyer was set by the individual sale and purchase agreement and the developer's own notices, not by the register reading alone. A buyer of a ready Lotus apartment today does not follow that schedule and settles the agreed price around transfer instead.

The DLD register records construction as started on 5 March 2022, and the 100% reading came on 4 October 2024: 944 days, or about two years and seven months, from recorded start to full recorded progress. The only other figure in the register is the undated 94.56%, so the pace of work between those two dates cannot be reconstructed from the record.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the October 2024 inspection record for Lotus at Dubai Creek Harbour correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts