Emaar Properties · Dubai Creek Harbour
Mangrove at Dubai Creek Harbour Construction Updates
Two Park-Side Creek Beach Buildings, Tracked on a Shared Register From Groundbreaking to Ready
Mangrove's joint DLD register read 100% at the 04 November 2025 inspection, closing out two park-side Creek Beach buildings that now carry Ready status.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Mangrove at Dubai Creek Harbour at a Glance
Mangrove is Emaar Properties' 135-apartment address at the heart of Creek Beach in Dubai Creek Harbour: two park-side buildings, G+M+7 and G+M+8, set around a central plaza. It has no DLD project number of its own. Mangrove is registered jointly with Savanna and Cedar as project 2551, Creek Beach - Savanna-Cedar-Mangrove, so the anchors below belong to that shared register, from the 27 May 2023 construction start to the 100% read on 04 November 2025. That is what sets this record apart: its percentage tracks three Creek Beach projects moving as one register, never Mangrove's two buildings measured alone.
2551 (joint register)
Ready (register: Finished)
27 May 2023
135 residential units
336,531.98 sq m (joint DLD register)
31 July 2026 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Mangrove at Dubai Creek Harbour Construction Update Timeline
Mangrove's supplied record holds one dated reading: 100% on 04 November 2025, taken 892 days after the 27 May 2023 construction start and 12 days after the BCC from DDA dated 23 October 2025. The Dubai REST app also shows a previous-inspection figure of 92.73% but gives it no date, so it sits on the track below as an undated dot rather than a table row. The single row links the full November 2025 update.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| November 2025 | 100% | 04 November 2025 | View the November 2025 update |
Reading the dates: the registered completion date for project 2551 is 31 July 2026, and it has now passed, but construction on the joint register had already read 100% on 04 November 2025, 269 days before it, and Mangrove's status is Ready. The registered date is the completion field held in the DLD register, not a measure of how the build ran; when a specific apartment is delivered is set by its sale agreement.
Pace Analysis
How Fast Mangrove at Dubai Creek Harbour Has Been Built
With a single dated reading, Mangrove's pace cannot be split into phases the way a multi-inspection record can. What the register does support is a whole-build average and one recorded step:
- 27 May 2023 to 04 Nov 2025: whole build on joint register 2551, start to 100% (892 days)About 3.36 points per month
- Undated previous inspection to 04 Nov 2025: 92.73% to 100%7.27 points, no pace measurable
Read the 3.36 figure as derived arithmetic, not a forecast: 100 points over 892 days, about 29.7 months at 30 days a month. It is also a ceiling on elapsed time rather than a measured speed, because the register confirms only that 100% had been reached by the 04 November 2025 inspection, not the day it was reached. The closing sequence is sharper. The inspection notes date DCD on 26 August 2025, LPG from DCD on 16 September 2025 and the BCC from DDA on 23 October 2025, so the approvals landed within 58 days and the 100% reading followed 12 days later. For an end user, that sequence means construction risk on these two buildings has closed and the open question is the condition of one specific apartment; for an investor, it shows a shared Creek Beach register reaching 100% about 29.7 months after its start, with the registered completion date still 269 days away at that reading.
Get the Next Inspection Figure First
Tell me you are tracking Mangrove at Dubai Creek Harbour and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Mangrove at Dubai Creek Harbour
A 100% reading only matters in the context of what it delivered. The full project guide covers the apartments this record tracks:

Mangrove at Dubai Creek Harbour: Two Park-Side Buildings at Creek Beach
Mangrove at Dubai Creek Harbour is an Emaar project of 135 apartments in two buildings around a plaza beside a park.
View the Mangrove at Dubai Creek Harbour Project GuideConsidering a Ready Mangrove Apartment?
At a completed building, availability moves apartment by apartment as individual units sell. If the record on this page is what brought you here, ask me which Mangrove apartments are available now before the remaining choice narrows further.
Ask About Remaining Availability on WhatsAppStage Record
Mangrove at Dubai Creek Harbour Build Stages, Mapped to the Inspections
With one dated inspection, most stages below are anchored to register dates and dated approvals rather than to percentages, so each window shows only what Mangrove's record on project 2551 can actually prove, from the 01 March 2023 registration to the 100% of 04 November 2025.
Registration and Site Activation
Project 2551 was registered on 01 March 2023 and construction started on 27 May 2023, 87 days later, with no percentage recorded in that window.
Concrete Structure for Two Buildings
The inspection report describes Mangrove as a concrete structure with blockwork: Building 1 at G+M+7 and Building 2 at G+M+8. No dated reading was supplied for this phase.
Internal and External Finishes
Finishes inside and out closed the building works. The app's undated previous inspection at 92.73% falls somewhere before the final reading, with no date to place it.
Approvals, Utilities, and the BCC
DCD received on 26 August 2025, LPG from DCD on 16 September 2025 and the BCC from DDA on 23 October 2025, with water and electricity meters connected.
Completion, Snagging, and Handover
All construction activities were recorded as completed at 100% on 04 November 2025, with snagging works ongoing on that date. Mangrove's status is Ready.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Mangrove at Dubai Creek Harbour's own record.
Buyer Position
Tracking Your Position at Mangrove at Dubai Creek Harbour
This page is one of four project resources that together cover a Mangrove at Dubai Creek Harbour purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Mangrove at Dubai Creek Harbour Construction Updates
This page: the joint DLD register record for Mangrove, from the May 2023 start to completion.

Mangrove at Dubai Creek Harbour Golden Visa: Two Buildings at Creek Beach
Mangrove at Dubai Creek Harbour, 135 Emaar apartments under DLD project 2551, meets the threshold at 2 and 3 bedrooms only.
Read the Mangrove at Dubai Creek Harbour Golden Visa Guide
Mangrove at Dubai Creek Harbour: The Escrow Record for a Finished Build
Mangrove at Dubai Creek Harbour, an Emaar release with its project status finished, paid buyer instalments into Dubai Islamic Bank escrow.
Verify the Mangrove at Dubai Creek Harbour Escrow Account
Mangrove at Dubai Creek Harbour Snagging in Two Park-Side Buildings
Mangrove at Dubai Creek Harbour holds 135 apartments of one, two and three bedrooms at Creek Beach, configured G+M+7 and G+M+8.
Book Mangrove at Dubai Creek Harbour SnaggingApproaching Handover
Between 100% and Handover: What Mangrove at Dubai Creek Harbour Buyers Should Do Now
Nothing left on the register is construction: the 04 November 2025 record logged every building activity complete, and the BCC from DDA was already dated 23 October 2025. What remains is individual to each Mangrove apartment, and handover notices usually leave a short window to act, so the three steps below belong before your notice arrives, not after it.
First, the November 2025 notes recorded snagging works still ongoing, so arrange an independent inspection of your own apartment before you sign; the Mangrove snagging inspection page covers timing and what gets checked.
Second, confirm any final amount against the escrow record for joint register 2551 on the Mangrove escrow account page, so the last payment follows the completed build, not a request.
Third, if your apartment tier may support residency, settle eligibility before the title deed is issued through the Mangrove Golden Visa eligibility guide, since the application rests on the title deed.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore Dubai Creek Harbour Structure
A finished record is only half the picture; the other half is the district it finished in. These three pages put Mangrove's completed build in its market, master community, and developer context:

Dubai Creek Harbour Properties for Sale
Browse waterfront apartments, branded residences and penthouses for sale in Dubai Creek Harbour.
See Dubai Creek Harbour Properties for Sale
Dubai Creek Harbour: Emaar's Waterfront City With a Marina and Urban Beach
Dubai Creek Harbour is Emaar's waterfront city between Downtown Dubai and the Creek, planned for 48,500 homes with skyline views.
Explore the Dubai Creek Harbour Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Mangrove at Dubai Creek Harbour Construction Updates Frequently Asked Questions
Mangrove at Dubai Creek Harbour is complete and Ready: joint DLD register 2551, which it shares with Savanna and Cedar, read 100% at the inspection of 04 November 2025, with a register status of Finished and a BCC from DDA dated 23 October 2025. That reading is the latest in the supplied record and is 325 days old at 25 September 2026. The full record is in the inspection timeline above.
The 04 November 2025 inspection took Mangrove's joint register 2551 to 100%, 7.27 points above the 92.73% that the Dubai REST app shows as its previous inspection. That earlier figure carries no date, so the step cannot be turned into a monthly pace. The dated notes behind the reading are covered in the Mangrove November 2025 construction update.
Mangrove's register record shows no construction delay: project 2551 read 100% on 04 November 2025, 269 days before the 31 July 2026 registered completion date, and Mangrove's status is Ready. The registered date is the completion field held in the DLD register, so its passing after a 100% reading says nothing about the build running late. Delivery of an individual apartment follows the handover terms in its sale agreement, and this page's record is updated if the register changes.
Mangrove at Dubai Creek Harbour has 135 residential units in two buildings, which the 04 November 2025 inspection report describes as G+M+7 and G+M+8, with a concrete structure, blockwork, and internal and external finishes. The register's unit and area totals cover all three Creek Beach projects on project 2551, so no Mangrove-only built-up area is stated on this page.
Mangrove's joint register ran 892 days from the 27 May 2023 construction start to the 100% reading of 04 November 2025, about 29.7 months at 30 days a month. That averages about 3.36 points a month across the whole build, derived arithmetic rather than a forecast, and with only one dated reading no phase-by-phase pace can be measured. The working is in the pace analysis above.
Joint DLD register 2551, which includes Mangrove, was registered on 01 March 2023, and construction started on 27 May 2023, 87 days later. The first dated reading in the supplied record is the 100% of 04 November 2025; no earlier dated inspection was supplied, only the app's undated previous figure of 92.73%.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Mangrove at Dubai Creek Harbour construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.