Emaar · Rashid Yachts & Marina · Construction Update
Marina Place 2 Construction Update - April 2026
April 2026 Inspection Records Marina Place 2 at 1.52% as Enabling Works Progress at Rashid Yachts & Marina
Site mobilisation and enabling works were under way at Marina Place 2 when RERA inspected on 21 April 2026, with the DLD register reading 1.52 percent.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Marina Place 2 Construction Snapshot
A 1.52% DLD register reading on 21 April 2026 places Marina Place 2 at the opening of the enabling band, the stage where escrow, Oqood registration and the dated payment schedule weigh more on a buyer's decision than the reading itself.
Marina Place 2 by Emaar
3387
Active
1.52%
21 April 2026
24 April 2025
179 Residential Units
18,943.39 sq m
31 December 2028
Data source: RERA Independent Progress Monitoring Report for the inspection of 21 April 2026 and the Dubai Land Department project register for project 3387, where 1.52% was the latest reading in the supplied record; the report itself prints no percentage. The hero image is a developer rendering, not a site photograph. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: April 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Marina Place 2 Construction Progress Summary
At the 21 April 2026 inspection the DLD register showed Marina Place 2 at 1.52%, 1.50 points above the previous register reading of 0.02%; the app gives no date for that earlier reading, so the gain cannot be tied to a period or turned into a pace. What the record does fix is the stage: RERA found site mobilisation ongoing and enabling works progressing, with the building itself still ahead.
- DLD registration as project 3387 on 15 November 2024
- Construction start recorded in the register on 24 April 2025
- Project trust account assigned at Emirates Islamic Bank
- Site mobilisation, recorded as ongoing at the 21 April 2026 visit
- Enabling works, with the RERA status Enabling Works, Progressing
- The single building: ground, podium and twelve residential floors
- Building systems and finishes for 179 residences, two-level townhouses included
- Remaining RERA inspection cycles toward 100% and the Q4 2028 handover
Payment Linked Progress
What 1.52% Progress Means for Marina Place 2 Buyers
Emaar's launch schedule for Marina Place 2 is an 80/20 plan whose later rows pair a date with a construction milestone, so a reading of 1.52% is the reference point for working out which obligations come next. At this enabling stage, four actions matter most.
Verify the escrow account
Any payment still ahead should go only to the DLD regulated escrow account registered for project 3387 at Emirates Islamic Bank. Marina Place 2 escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA milestone schedule
By the 21 April 2026 reading, four dated instalments totalling 40% had fallen due on the launch schedule while the register showed 1.52%; the next row, 10% dated August 2026, is labelled against 20% construction completion, and your SPA decides whether the date or the milestone triggers it. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Confirm your Oqood registration
At the enabling stage the interim Oqood registration with the Dubai Land Department is the record that ties your unit to project 3387; check that it names the correct Marina Place 2 unit and matches your SPA before the next instalment.
Track the next readings
As of April 2026 the register showed no stage beyond enabling works, so each new entry is worth setting against the dated rows of your plan. Marina Place 2 construction updates hub records each cycle as it publishes.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 1.52%?
Entering at the enabling stage trades certainty for time: the building has not yet risen, handover is planned for Q4 2028, and the price is today's list rather than a finished-building price. Every payment goes to the DLD-registered escrow account for project 3387, released against recorded construction progress.
- Enabling works on the April 2026 record, the building still to rise
- Handover planned for Q4 2028, roughly two and a half years after this reading
- 20% of the 80/20 plan falls due on completion
- The building largely visible before you commit
- A shorter wait between purchase and keys
- Less instalment runway left before completion
Limited units available per the project page as of this update; availability shifts between cycles.
About the Development
Marina Place 2 Project Details

Still at mobilisation and enabling works in April 2026, Marina Place 2 is one G+P+12 building of 179 residences, split between 1 to 3 bedroom apartments and two-level 3 bedroom townhouses. Starting prices: AED 2.08M ≈ USD 566K.
For buyers entering at this stage, the trade off is a long build still ahead against committing before the building rises, with handover expected in Q4 2028 and the remaining instalments set by your SPA.
Marina Place 2 at Rashid Yachts & Marina Project GuideSite Context This Cycle
Explore Marina Place 2 Location on Dubai Map
Marina Place 2 sits inside Rashid Yachts & Marina with direct access to the marina, set between the old trading quarters of Bur Dubai and the business towers along Sheikh Zayed Road; in April 2026 its waterfront plot was still at mobilisation and enabling works, the work that prepares the ground before a building rises on it.
Unlike the build itself, the district around it already operates, with a working marina, a waterfront promenade and occupied residential buildings, so buyers at this early stage are judging an established address rather than a future one, and the Q4 2028 handover is the main variable. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Marina Place 2 During Enabling Works
The enabling band is where payment protection, residency planning and a long build horizon all need settling before the building rises. Each resource below is matched to where Marina Place 2 stood in April 2026.

Marina Place 2 Construction Updates
This page: the 21 April 2026 inspection record for Marina Place 2 at the enabling stage.

Marina Place 2 at Rashid Yachts & Marina Golden Visa: Four Layouts
Marina Place 2 at Rashid Yachts & Marina holds 179 Emaar residences; all four layouts start at or above the line.
Read the Marina Place 2 Golden Visa Guide
Marina Place 2 at Rashid Yachts & Marina Escrow, at Emirates Islamic
Marina Place 2 at Rashid Yachts & Marina escrows 180 units at Emirates Islamic, DLD project 3387, 1.52% certified April 2026.
Verify the Marina Place 2 Escrow AccountUpdate Timeline
Other Marina Place 2 Construction Updates
April 2026 is the first monthly report in this series for Marina Place 2, so the timeline starts here; later readings join the hub as each cycle publishes.
Where This Update Fits
Explore Marina Place 2 Structure
The April 2026 reading is one entry in a larger picture: the Rashid Yachts & Marina homes already on the market, the waterfront district around the plot, and the developer delivering the build.

Mina Rashid Properties for Sale
Browse waterfront apartments for sale at Rashid Yachts & Marina, with projects, prices and payment plans.
See Mina Rashid Properties for Sale
Mina Rashid Community Overview
Read the Rashid Yachts & Marina guide: Emaar's transformation of historic Port Rashid into a marina lifestyle community.
Explore the Mina Rashid Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileFAQs
Marina Place 2 Construction Progress in April 2026: Frequently Asked Questions
At the RERA inspection of 21 April 2026, the Dubai Land Department project register recorded Marina Place 2 (project 3387) at 1.52%. The RERA report for that visit prints no percentage of its own; it gives the progress status as Enabling Works, Progressing.
It can, but the April 2026 record showed no change: at the 21 April 2026 reading the register carried a registered completion date of 31 December 2028, which falls inside the Q4 2028 handover. Registered dates can be revised between inspection cycles, and any revision would appear in a later update; how readings feed the timeline is covered on the Marina Place 2 construction updates hub.
For Marina Place 2 in April 2026, 1.52% described a site still being prepared for its building rather than a building under way: RERA recorded mobilisation as ongoing and enabling works as progressing, and the record shows no later stage at that inspection. The ground, podium and twelve residential floors of the single building were all still ahead.
The DLD app's inspection card for 21 April 2026 lists 0.02% as the previous inspection but shows no date for it, so the interval between the two readings cannot be established. This page therefore plots 0.02% as an undated previous-inspection marker and draws no pace or monthly rate from the pair.
The Independent Progress Monitoring Report for 21 April 2026 notes that site mobilisation was ongoing and that enabling works were progressing, and it carries inspection photographs. It describes the project as a residential development of 1 building (G+P+12 floors) with 179 residential units and 1 retail unit.
The DLD register records project 3387 as registered on 15 November 2024 and construction as started on 24 April 2025, 160 days later. The 21 April 2026 inspection fell 362 days after that recorded start date.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the April 2026 inspection record for Marina Place 2 at Rashid Yachts & Marina correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.