Marina Place 2 by Emaar in Rashid Yachts & Marina construction updates cover image featuring a project rendering of residential buildings beside an illuminated waterfront promenade and yachts in Dubai - Presented by Tohid Fetrat

Emaar · Rashid Yachts & Marina

Marina Place 2 at Rashid Yachts & Marina Construction Updates

The Register Record of One G+P+12 Building on the Mina Rashid Waterfront

Marina Place 2 stood at 1.52% on the DLD register at the 21 April 2026 inspection, an enabling-stage reading that opens the record for this marina-side building.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

1.52%Construction Progress
21 April 2026Latest RERA Inspection
179 residential unitsTotal Units
Project 3387DLD Registration

Construction Snapshot

Marina Place 2 at Rashid Yachts & Marina at a Glance

Marina Place 2 is Emaar's single-building development of 179 residences at Rashid Yachts & Marina, entered in the DLD register as project 3387 on 15 November 2024. Construction was recorded as starting on 24 April 2025, 160 days after registration, and the first dated reading, 1.52% on 21 April 2026, came 362 days into the build. Because 1 to 3 bedroom apartments and two-level townhouses share one G+P+12 building, every reading in this record speaks for the whole project at once, with no second tower to average in.

DLD Project Number

3387

Project Status

Active

Construction Start

24 April 2025

Total Units

179 residential units

Total Built-Up Area

18,943.39 sq m

Registered Completion Date

31 December 2028 (DLD)

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

Marina Place 2 at Rashid Yachts & Marina Construction Update Timeline

The Marina Place 2 record opens with a single dated reading: 1.52% on 21 April 2026, taken at a RERA visit whose notes place the plot at mobilisation, with enabling works under way. The register also lists a previous reading of 0.02% with no date attached, so that reading sits on the track below as an unlabelled marker rather than a table row, and the +1.50 points between the two cannot be tied to any period. The row underneath links the full April 2026 update.

Inspection MonthConstruction ProgressInspection DateFull Update
April 20261.52%21 April 2026View the April 2026 update

Pace Analysis

How Fast Marina Place 2 at Rashid Yachts & Marina Has Been Built

A pace needs two dated readings, and Marina Place 2 has one. What its record does fix are the distances on either side of the 21 April 2026 reading, set out here as recorded facts and arithmetic, not a forecast:

  • 24 Apr 2025 to 21 Apr 2026: recorded construction start to the first dated reading362 days
  • 21 Apr 2026 to 31 Dec 2028: first dated reading to the registered completion date985 days
  • Remaining to 100% after the 1.52% reading of 21 April 202698.48 points
  • Measured pace between dated readingsNot yet measurable

There is no curve to read yet, and that is itself the finding: the 0.02% entry has no date, so the record cannot say whether the 1.52% of April 2026 was reached over weeks or over most of the year since the 24 April 2025 start. The second dated register reading will turn this section into a measured pace. Until then, an end user planning a move should anchor on the Q4 2028 handover, with the registered completion date of 31 December 2028 inside that quarter, while an investor watching the 80/20 launch schedule should set each dated instalment against the latest register figure rather than against the calendar alone.

Get the Next Inspection Figure First

Tell me you are tracking Marina Place 2 at Rashid Yachts & Marina and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About Marina Place 2 at Rashid Yachts & Marina at Mina Rashid

An enabling works reading only makes sense next to the building it will become. The full project guide covers what buyers on this record are waiting for:

Marina Place 2 by Emaar in Rashid Yachts & Marina project rendering of an elevated residential terrace with people overlooking the marina, yachts and waterfront skyline in Dubai - Presented by Tohid Fetrat

Marina Place 2 at Rashid Yachts & Marina in One G+P+12 Building

Marina Place 2 at Rashid Yachts & Marina is a single Emaar building of 179 apartments and two-level three bedroom townhouses.

View the Marina Place 2 at Rashid Yachts & Marina Project Guide

Considering an Early-Stage Entry?

Limited units are available at Marina Place 2, and at the enabling stage the choice is made from plans and renderings rather than a finished building. If the record on this page is what brought you here, ask me for current availability before the remaining choice narrows.

Ask About Remaining Availability on WhatsApp

Stage Record

Marina Place 2 at Rashid Yachts & Marina Build Stages, Mapped to the Inspections

Each stage below is tied to the window it occupies in the Marina Place 2 record, from the 15 November 2024 registration to the Q4 2028 handover, so it is clear which stages have a recorded date and which are still ahead of the 1.52% reading of 21 April 2026.

Nov 2024 to Apr 2025

Registration and Recorded Start

Project 3387 entered the DLD register on 15 November 2024, and the register records construction as starting on 24 April 2025, 160 days later.

Current PhaseApr 2025 onward, 1.52% at last reading

Mobilisation and Enabling Works

RERA notes from the 21 April 2026 visit put the plot at mobilisation with enabling works under way, while the register stood at 1.52%.

Not yet recorded

Ground, Podium and Twelve Floors

No reading has reached this stage: it is where the G+P+12 building rises, the two-level townhouses at ground and podium level included.

Not yet recorded

Enclosure and Residence Fit-Out

Still ahead of the April 2026 record: closing in the building and fitting out its 179 residences, from apartment balconies to townhouse terraces.

Toward Q4 2028

Completion and Handover

The registered completion date is 31 December 2028, inside the Q4 2028 handover, when the final 20% of the 80/20 launch schedule is tied to completion.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Marina Place 2 at Rashid Yachts & Marina 's own record.

Buyer Position

Tracking Your Position at Marina Place 2 at Rashid Yachts & Marina

This page is one of four project resources that together cover a Marina Place 2 at Rashid Yachts & Marina purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Marina Place 2 by Emaar in Rashid Yachts & Marina construction updates cover image featuring a project rendering of residential buildings beside an illuminated waterfront promenade and yachts in Dubai - Presented by Tohid Fetrat
You Are Here

Marina Place 2 at Rashid Yachts & Marina Construction Updates

This page: every DLD register reading for Marina Place 2, from enabling works to handover.

Marina Place 2 by Emaar in Rashid Yachts & Marina Golden Visa concept graphic showing a gold card above a rendered waterfront swimming pool, residential balconies and planted poolside in Dubai - Presented by Tohid Fetrat

Marina Place 2 at Rashid Yachts & Marina Golden Visa: Four Layouts

Marina Place 2 at Rashid Yachts & Marina holds 179 Emaar residences; all four layouts start at or above the line.

Read the Marina Place 2 at Rashid Yachts & Marina Golden Visa Guide
Marina Place 2 by Emaar in Rashid Yachts & Marina escrow account concept graphic showing a shield and padlock above a rendered residential building entrance and glazed lobby in Dubai - Presented by Tohid Fetrat

Marina Place 2 at Rashid Yachts & Marina Escrow, at Emirates Islamic

Marina Place 2 at Rashid Yachts & Marina escrows 180 units at Emirates Islamic, DLD project 3387, 1.52% certified April 2026.

Verify the Marina Place 2 at Rashid Yachts & Marina Escrow Account

Approaching Handover

Between 1.52% and Handover: What Marina Place 2 at Rashid Yachts & Marina Buyers Should Do Now

With the April 2026 record at enabling works and handover set for Q4 2028, most of a Marina Place 2 purchase still lies in the dated rows of the 80/20 launch schedule rather than in anything visible on site. New readings post to the register between RERA visits, so the three checks below belong before your next instalment, not after it.

First, make sure every remaining payment goes only into the project 3387 trust account at Emirates Islamic Bank; the Marina Place 2 escrow account page sets out how to match that account to the DLD record.

Second, if residency is part of the plan, work through the Marina Place 2 Golden Visa guide early, because eligibility rests on the value recorded for your specific unit, and the 1 bedroom entry sits close to the threshold.

Third, compare layouts, prices and the launch schedule in the Marina Place 2 project guide so the unit you choose suits a build that, at its April 2026 reading, still had 98.48 points to cover.

Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore Mina Rashid Structure

One enabling-stage reading says little about the address it belongs to. These three pages set the Marina Place 2 record against the Rashid Yachts & Marina market, the community and the developer:

Waterfront apartment buildings with modern architecture overlooking a marina filled with luxury yachts at Rashid Yachts and Marina by Emaar in Dubai Presented by Tohid Fetrat

Mina Rashid Properties for Sale

Browse waterfront apartments for sale at Rashid Yachts & Marina, with projects, prices and payment plans.

See Mina Rashid Properties for Sale
Luxury yachts at Rashid Yachts and Marina waterfront community with modern residences and marina promenade in Mina Rashid Dubai Presented by Tohid Fetrat

Mina Rashid Community Overview

Read the Rashid Yachts & Marina guide: Emaar's transformation of historic Port Rashid into a marina lifestyle community.

Explore the Mina Rashid Community
Emaar Properties developer showcasing Downtown Dubai skyline with Burj Khalifa and surrounding residential and commercial towers at dusk Presented by Tohid Fetrat

Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities

Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.

View the Emaar Properties Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

Marina Place 2 at Rashid Yachts & Marina Construction Updates Frequently Asked Questions

Marina Place 2 is an active DLD-registered project (number 3387) at the enabling works stage: the Dubai Land Department project register recorded it at 1.52% on 21 April 2026, the latest reading in the record this page holds, and the RERA report for that visit gives the status as Enabling Works, Progressing. The dated record is in the inspection timeline above.

Each Marina Place 2 percentage on this page is a reading from the Dubai Land Department project register for project 3387, posted after a RERA site inspection. The RERA report of 21 April 2026 itself prints no percentage, only its site notes and a progress status, so the 1.52% figure of that date is attributed to the register, and every new dated reading is added as its own row in the timeline.

One dated reading: 1.52% on 21 April 2026, set against a construction start recorded on 24 April 2025. The register also lists a previous reading of 0.02% without a date, so it appears on the track as an unlabelled marker with no table row. The April 2026 visit is covered in full in the Marina Place 2 April 2026 construction update.

The DLD register shows a registered completion date of 31 December 2028 for project 3387, and the expected handover is Q4 2028, so the registered date sits inside the handover quarter and had not lapsed when this page was built. At the 21 April 2026 reading, 985 days separated the reading from that registered date; this is arithmetic on recorded dates, not a forecast of the handover.

At the 21 April 2026 reading of 1.52%, 98.48 percentage points remained before Marina Place 2 reaches 100%, with 985 days left to the registered completion date of 31 December 2028. That reading came 362 days after the recorded construction start of 24 April 2025. These are recorded facts set side by side, not a rate or a forecast.

Measuring a pace takes two dated readings, and the Marina Place 2 record holds only one, 1.52% on 21 April 2026; the earlier 0.02% figure carries no date, so no interval can be measured. The first measured pace will come from the next dated register reading, set against the 21 April 2026 figure in the pace section above.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the Marina Place 2 at Rashid Yachts & Marina construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.