Marine 3 at DAMAC Riverside Views Construction Update - August 2026
August 2026 Inspection Records Marine 3 at 18.22% Construction Progress in DAMAC Riverside
Mobilisation, substructure and superstructure works, and early MEP were all under way at Marine 3 when the DLD register recorded 18.22% on 26 August 2026.
Direct advisor access. Every message answered personally, never by a call center.
DLD Register Inspection Data
Marine 3 Construction Snapshot
An 8.40 point rise over a previous reading the register leaves undated takes Marine 3 to 18.22% and places it in early-stage construction, the band where escrow checks, Oqood registration and the payment schedule matter more to a buyer than the percentage itself.
Marine 3 at DAMAC Riverside Views
3374
Active
18.22%
26 August 2026
29 January 2025
276 residences
22,421.74 sq m
31 May 2028
Data source: DLD project register reading for project 3374, Damac Riverside Views - Marine 3, recorded on 26 August 2026, with the RERA Independent Progress Monitoring Report of the same date. The image at the top of this page is a DAMAC project rendering, not a site photograph. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: August 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Marine 3 Construction Progress Summary
From a previous reading of 9.82% to the 18.22% recorded on 26 August 2026, Marine 3 moved out of groundwork and into its structure. The RERA report for that date describes a G+2P+8 residential building with a concrete structure and blockwork, on a site where foundations were substantially completed and the substructure, superstructure and first MEP works were all progressing together.
- DLD project registration on 20 November 2024
- Construction start recorded on 29 January 2025
- Enabling and foundation works, substantially completed per the 26 August 2026 report
- Mobilisation works, still under way at the inspection
- Substructure and superstructure, at different stages
- MEP works, at an early stage alongside the structure
- Main contract on the G+2P+8 building, recorded as progressing
- Completion of the concrete structure and blockwork
- Internal and external finishes across the 276 residences
- Remaining RERA inspection cycles toward 100%
- Handover, communicated for Q1 2029
Payment Linked Progress
What 18.22% Progress Means for Marine 3 Buyers
The Marine 3 schedule runs by months from booking, not by construction milestones, so the 18.22% reading does not trigger a payment. Under the DAMAC Riverside Views regular payment plan, 20% plus the 4% DLD registration fee is paid on booking, 60% follows in 40 instalments and 20% falls due on completion. DAMAC publishes this as the regular payment plan for DAMAC Riverside Views; confirm the schedule that applies to your Marine 3 unit with DAMAC and in the SPA. At this stage, four actions matter most.
Verify the escrow account
Every payment toward a Marine 3 unit should go only to the DLD regulated escrow account registered for project 3374 with First Abu Dhabi Bank. Marine 3 escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record, listed as Damac Riverside Views - Marine 3.
Read your SPA payment schedule
See how your sale and purchase agreement dates the 40 instalments and the 20% due on completion, and how its handover clauses treat Q1 2029 against the registered completion date of 31 May 2028. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Confirm your Oqood registration
Off-plan units in Dubai are recorded on Oqood, the DLD interim register, long before any title deed exists. Confirm that your Marine 3 unit appears there under project 3374, and note that the 4% DLD registration fee paid at booking goes to the DLD, not into escrow.
Track each new reading
With 81.78 points still to be recorded after 26 August 2026, many inspection cycles remain before Marine 3 reaches 100%. The Marine 3 construction updates hub lines each reading up against the Q1 2029 handover.
General framework, not legal advice: payment dates, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 18.22%?
Entering Marine 3 at this stage means buying while the building is still rising: the record shows foundations substantially completed and the structure progressing, and handover is communicated for Q1 2029. Every payment goes to the DLD-registered escrow account for project 3374, released against construction progress.
- Enabling and foundation works substantially completed as of 26 August 2026
- Main contract recorded as progressing on the G+2P+8 building
- 60% of the price spread over 40 instalments scheduled by months from booking
- Every construction stage still ahead, from excavation onward
- No inspection record yet to read before committing
- Launch pricing set before any works begin
Units Available per the Marine 3 project page as of this update, with no count published; availability shifts between cycles.
About the Development
Marine 3 Project Details

Marine 3 is a G+2P+8 building of 276 residences, all 1 and 2 bedroom apartments, recorded on 26 August 2026 with enabling and foundation works substantially completed and its structure progressing. Starting prices: AED 880K ≈ USD 240K.
Entering at this stage means a longer wait to the Q1 2029 handover, with 60% of the price spread over 40 instalments scheduled by months from booking rather than by construction progress.
Marine 3 at DAMAC Riverside Views Project GuideSite Context This Cycle
Explore Marine 3 Location on Dubai Map
Marine 3 stands in DAMAC Riverside Views, the apartment quarter DAMAC has planned inside DAMAC Riverside, Dubai Investment Park 2, where the developer's renderings show buildings set around landscaped courtyards and planned waterways. At the 26 August 2026 inspection the plot was still in its mobilisation and structure phase, so the courtyards and water features in those renderings are not yet part of what the register describes.
The district around the plot already has its road links: DAMAC's investment presentation points to direct links with the E311 and E611 highways, and its factsheet puts the Expo 2020 site and Al Maktoum International Airport each about 12 minutes' drive away (community figures, not specific to Marine 3). For a buyer at 18.22%, the location case rests on that existing access, while the community amenities DAMAC plans around Marine 3 remain future deliverables to watch in later readings. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Marine 3 During Early-Stage Construction
Early in the build, the questions that matter are where your money goes, how residency rules treat an off-plan purchase, and how each new reading changes the picture. Each resource below is matched to where Marine 3 stands at 18.22%.

Marine 3 Construction Updates
This page: the 26 August 2026 register reading for Marine 3 and its IPMR works breakdown.

Marine 3 Golden Visa: Closest Unit Is the 2 Bedroom Apartment
Marine 3 at DAMAC Riverside Views, DAMAC Properties' 276-residence building, has no apartment type reaching the AED 2M threshold.
Read Marine 3 Golden Visa Guide
Marine 3 at DAMAC Riverside Views Escrow With First Abu Dhabi Bank
Marine 3 at DAMAC Riverside Views read 18.22% certified in August 2026, with 276 residential units escrowed under DLD project 3374.
Verify Marine 3 Escrow AccountUpdate Timeline
Other Marine 3 Construction Updates
This August 2026 page is the first monthly record for Marine 3 on this site; each later reading joins it on the hub, so movement can be followed from the 26 August 2026 figure onward.
Where This Update Fits
Explore Marine 3 Structure
This report covers one building and one inspection; the cards below widen the view to the DAMAC Riverside community around it, the developer delivering it, and the listings it competes with.

DAMAC Riverside Properties for Sale
Explore DAMAC Riverside properties for sale, featuring modern apartments, spacious townhouses, luxury villas, flexible payment plans and amenities.
See DAMAC Riverside Properties for Sale
DAMAC Riverside Community Overview
Read the DAMAC Riverside guide: 4 and 5 bedroom townhouses with lagoons and green spaces in the Dubai South growth corridor.
Explore the DAMAC Riverside Community
DAMAC Properties: Lagoon Communities, Golf Villas and Branded Collaborations
Founded in 2002, DAMAC has delivered 48,000 homes and is known for large-scale master communities, luxury residential projects and branded collaborations.
View the DAMAC Developer ProfileFAQs
Marine 3 at DAMAC Riverside Views Construction Progress in August 2026: Frequently Asked Questions
The DLD project register recorded 18.22% for project 3374, Damac Riverside Views - Marine 3, at the inspection of 26 August 2026, up from a previous reading of 9.82% (the register does not date that reading). The project status was Active, and the RERA inspection report for the same date gave a progress status of Main Contract - Progressing.
As of the 26 August 2026 record, the registered completion date for project 3374 was 31 May 2028, while the handover communicated for Marine 3 is Q1 2029; both dates lie ahead. The registered completion date on the DLD record is the developer's filing, and buyers confirm the date that applies to them in the SPA. Register dates can be revised between inspection cycles, so any revision would appear in a later reading, and the Marine 3 construction updates hub sets the recorded dates on one timeline.
The RERA Independent Progress Monitoring Report dated 26 August 2026 described mobilisation works still under way, enabling and foundation works substantially completed, substructure and superstructure progressing at different stages, and MEP works progressing at an early stage alongside the structure. It described Marine 3 as a G+2P+8 residential building with a concrete structure and blockwork. The report prints no percentage of its own: the 18.22% figure is the DLD register reading for the same date.
The register lists 9.82% as the previous inspection for project 3374 but gives it no date, so the 8.40 point gap to the 18.22% recorded on 26 August 2026 shows that progress rose between the two inspections without showing how quickly. For that reason no monthly pace is calculated from the pair; the only rate on this page is a whole-build average from the registered start date of 29 January 2025, labelled as arithmetic rather than a forecast.
No. The hero image is a DAMAC project rendering of the planned waterfront, pool and residential buildings, used to illustrate this update; it does not show the site as inspected on 26 August 2026. The register record for project 3374 carries inspection photographs, which are RERA record material and are not reproduced on this page.
The 18.22% figure was recorded on 26 August 2026 and was 68 days old when this page was prepared on 2 November 2026, so a newer inspection may already be on file. The current reading can be checked in the Dubai REST app or the Dubai Land Department project register under project 3374, Damac Riverside Views - Marine 3.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the August 2026 inspection record for Marine 3 at DAMAC Riverside Views correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.