Marine 3 at DAMAC Riverside Views Construction Updates
A Dated Register Record for 276 Apartments in Dubai Investment Park 2
Marine 3 read 18.22% on the DLD register on 26 August 2026, the first dated figure on this record and the baseline for measuring its build pace.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Marine 3 at DAMAC Riverside Views at a Glance
Marine 3 is DAMAC Properties' 276-residence apartment building in DAMAC Riverside Views, the collection of apartment buildings that DAMAC is developing inside DAMAC Riverside in Dubai Investment Park 2. Construction started on 29 January 2025, seventy days after the building was registered, and the register stood at 18.22% on 26 August 2026. Because the DLD tracks Marine 3 under its own project number rather than a collection-wide record, every figure below belongs to this one G+2P+8 building and nothing else in the district.
3374
Active
29 January 2025
276 residences (G+2P+8)
22,421.74 sq m
31 May 2028 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Marine 3 at DAMAC Riverside Views Construction Update Timeline
The Marine 3 record runs from registration on 20 November 2024 and a construction start on 29 January 2025 to a single dated inspection: 18.22% on 26 August 2026, up from a previous reading of 9.82% that the register leaves undated. The track below marks both figures, the undated one as a dot only, and the table carries the dated reading with a link to its full monthly update.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| August 2026 | 18.22% | 26 August 2026 | View the August 2026 update |
Pace Analysis
How Fast Marine 3 at DAMAC Riverside Views Has Been Built
With one dated reading on the register, Marine 3 has no inspection-to-inspection pace yet. What can be computed is set out below in 30-day months, and all three figures are arithmetic, not a forecast:
- 29 Jan 2025 start to 26 Aug 2026 reading: 18.22 points over 574 daysAbout 0.95 points per month on average
- 26 Aug 2026 to the 31 May 2028 registered completion date: 81.78 points over 644 daysAbout 3.81 points per month for that date
- 26 Aug 2026 to the end of the Q1 2029 handover quarter: 81.78 points over 948 daysAbout 2.59 points per month for that quarter
A single dated figure cannot draw a curve. The register's previous reading of 9.82% carries no date, so whether the climb to 18.22% was gradual or concentrated is not on record, and the average above simply spreads the August 2026 figure across every month since the January 2025 start, including the enabling and foundation works the 26 August 2026 report found substantially completed. The two forward rates show only what each date would imply, neither a projection nor a verdict. For an end user, the figure to wait for is the next dated reading, which gives Marine 3 its first measurable pace; for an investor, the useful comparison is that pace set against the 31 May 2028 registered completion date and the Q1 2029 handover written into the SPA.
Get the Next Inspection Figure First
Tell me you are tracking Marine 3 at DAMAC Riverside Views and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Marine 3 at DAMAC Riverside Views at DAMAC Riverside
A register percentage means little without knowing what it measures. The project guide sets out the apartments this record is tracking toward handover:

Marine 3 at DAMAC Riverside Views: 276 Residences, 40 Instalments After Booking
DAMAC Properties' Marine 3 at DAMAC Riverside Views holds 276 one and two bedroom apartments in Dubai Investment Park 2.
View the Marine 3 at DAMAC Riverside Views Project GuideConsidering an Early-Stage Entry?
Marine 3 is on offer while its structure is still rising, with handover communicated for Q1 2029. If the record on this page is what brought you here, ask me which 1 and 2 bedroom apartments are currently offered and how the schedule would run for you.
Ask About Remaining Availability on WhatsAppStage Record
Marine 3 at DAMAC Riverside Views Build Stages, Mapped to the Inspections
Each stage below is tied to a date or figure in Marine 3's own register record rather than a generic sequence, so the position at 18.22% on 26 August 2026 reads against what has been recorded and what is still to come.
Registration and Site Start
The DLD registered project 3374 on 20 November 2024, and construction start followed 70 days later, recorded on 29 January 2025.
Mobilisation, Enabling Works and Foundations
By the 26 August 2026 inspection, enabling and foundation works were substantially completed while mobilisation was still going on; the register also lists a previous reading of 9.82%, which it does not date.
Substructure and Superstructure
Recorded at 18.22% on 26 August 2026 with the main contract progressing: substructure and superstructure works at different stages, and MEP works at an early stage alongside the structure.
Blockwork, MEP and Finishes
Still to be recorded: the blockwork, the full MEP installation, and the internal and external finishes the RERA report lists for the G+2P+8 building.
Completion and Handover
The closing readings toward 100%, with the registered completion date at 31 May 2028 and handover communicated for Q1 2029; each buyer's SPA sets the binding date.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Marine 3 at DAMAC Riverside Views's own record.
Buyer Position
Tracking Your Position at Marine 3 at DAMAC Riverside Views
This page is one of four project resources that together cover a Marine 3 at DAMAC Riverside Views purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Marine 3 at DAMAC Riverside Views Construction Updates
This page: the dated DLD register record for Marine 3, from its 2024 registration to handover.

Marine 3 Golden Visa: Closest Unit Is the 2 Bedroom Apartment
Marine 3 at DAMAC Riverside Views, DAMAC Properties' 276-residence building, has no apartment type reaching the AED 2M threshold.
Read the Marine 3 at DAMAC Riverside Views Golden Visa Guide
Marine 3 at DAMAC Riverside Views Escrow With First Abu Dhabi Bank
Marine 3 at DAMAC Riverside Views read 18.22% certified in August 2026, with 276 residential units escrowed under DLD project 3374.
Verify the Marine 3 at DAMAC Riverside Views Escrow AccountApproaching Handover
Between 18.22% and Handover: What Marine 3 at DAMAC Riverside Views Buyers Should Do Now
At 18.22% on 26 August 2026, Marine 3's substructure and superstructure were still progressing, so the decisions that matter now concern where your money goes and how the record is followed, not handover preparation. The SPA instalments are scheduled by months from booking rather than by inspection results, which means several can fall due before the next reading even appears on the register, so the three steps below belong before your next transfer.
First, before each transfer, confirm that the receiving account is the project's escrow account at First Abu Dhabi Bank (FAB); the Marine 3 escrow account page shows how to check it against the DLD record for project 3374.
Second, if residency is part of your plan, read the Marine 3 Golden Visa guide before committing, since at the listed prices neither apartment type reaches the Golden Visa property threshold on its own.
Third, follow each new reading as it is recorded: the Marine 3 August 2026 construction update holds the works breakdown for the 18.22% figure, and every later inspection joins the timeline above.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore DAMAC Riverside Structure
A single building's record reads better against what surrounds it. These three pages place Marine 3's early-stage progress in its market, community, and developer context:

DAMAC Riverside Properties for Sale
Explore DAMAC Riverside properties for sale, featuring modern apartments, spacious townhouses, luxury villas, flexible payment plans and amenities.
See DAMAC Riverside Properties for Sale
DAMAC Riverside Community Overview
Read the DAMAC Riverside guide: 4 and 5 bedroom townhouses with lagoons and green spaces in the Dubai South growth corridor.
Explore the DAMAC Riverside Community
DAMAC Properties: Lagoon Communities, Golf Villas and Branded Collaborations
Founded in 2002, DAMAC has delivered 48,000 homes and is known for large-scale master communities, luxury residential projects and branded collaborations.
View the DAMAC Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Marine 3 at DAMAC Riverside Views Construction Updates Frequently Asked Questions
Marine 3 at DAMAC Riverside Views is an Active DLD-registered project (number 3374) in early-stage construction, recorded at 18.22% on the DLD register at the inspection of 26 August 2026. The RERA report of the same date gives its progress status as Main Contract - Progressing, and the dated record is set out in the Marine 3 inspection timeline above.
The register reading for Marine 3 rose 8.40 points to 18.22% at the inspection of 26 August 2026, from a previous reading of 9.82% that the register does not date. Without a date for the earlier figure the rise cannot be expressed as a monthly rate; the works breakdown for the latest figure is in the Marine 3 update for August 2026.
No measured pace exists yet for Marine 3: the register holds one dated reading, 18.22% on 26 August 2026, and its previous 9.82% carries no date. The only rates on this page are a whole-build average from the 29 January 2025 construction start and the rates each completion date would imply, presented as labelled arithmetic rather than a forecast in the Marine 3 pace analysis.
Handover for Marine 3 is communicated for Q1 2029, while the DLD record for project 3374 carries a registered completion date of 31 May 2028; both dates lie ahead of the 18.22% recorded on 26 August 2026. The registered completion date is the developer's filing on the register, the date that binds each buyer is the one written into their SPA, and any revision to the register will show in a later reading on this page.
Marine 3 holds 276 residences, every one a 1 or 2 bedroom apartment, matching the 276 units on the DLD record for project 3374. The RERA report of 26 August 2026 describes it as a G+2P+8 residential building, that is a ground-plus-two-podium-plus-eight-floor block, designed with a concrete structure, blockwork and internal and external finishes.
The DLD registered Marine 3 as project 3374 on 20 November 2024, and the register records construction starting 70 days later, on 29 January 2025. The first dated reading tracked on this page is the 18.22% of 26 August 2026, which sits at the top of the Marine 3 register record.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Marine 3 at DAMAC Riverside Views construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.