Moor at Dubai Creek Harbour by Emaar Properties in Dubai Creek Harbour project rendering used for the November 2025 construction update showing the planned pet park with dog play equipment, landscaped lawn and residential buildings in Dubai - Presented by Tohid Fetrat

Emaar · Dubai Creek Harbour · Construction Update

Moor at Dubai Creek Harbour Construction Update - November 2025

November 2025 Inspection Records 100% Construction Progress on the DLD Registration Covering Moor in Dubai Creek Harbour

All construction activities are recorded complete for Moor's registration, and the 4 November 2025 inspection notes listed snagging works as ongoing, ahead of the November 2026 handover.

Direct advisor access. Every message answered personally, never by a call center.

100%Construction Progress
4 November 2025Inspection Date
30 November 2026Registered Completion
2555DLD Project Number

Verified DLD Inspection Data

Moor at Dubai Creek Harbour Construction Snapshot

A 17 point rise from 83% at the previous inspection takes the registration behind Moor to 100% and into the handover preparation band, where the open questions are snagging, the final payment and the keys rather than whether the buildings get built.

Project Name

Creek Beach - Canopy - Moor

Project Number

2555

Project Status

Finished

Construction Progress

100%

Inspection Date

4 November 2025

Construction Start

27 May 2023

Total Units

198 in four buildings

Total Built Area

309,598.95 sq m

Expected Completion

30 November 2026

Data source: DLD project register (Dubai REST) inspection dated 4 November 2025 for project 2555, registered as Creek Beach - Canopy - Moor. That single registration also covers the neighbouring Canopy buildings, so its progress reading, status and dates describe both developments, not Moor alone; the apartment count above is Moor's own. The reading was 323 days old when this page was prepared on 23 September 2026: re-verify project 2555 on Dubai REST before relying on it. The image at the top of this page is a developer rendering, not a record of site progress. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: September 2026.

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

This Inspection Cycle

Moor at Dubai Creek Harbour Construction Progress Summary

On the DLD project register, the 4 November 2025 inspection moved project 2555 from 83% at the previous inspection to 100%, a gain of 17 points that closes the build. The independent progress monitoring report for the same visit agrees: it lists every construction activity as completed, the statutory approvals as received and the utility meters as connected, leaving snagging works as the one item still open.

Completed
  • All construction activities, per the independent progress report
  • Moor's four mid-rise buildings, G+M+5 to G+M+8, holding 198 apartments
  • Dubai Civil Defence (DCD) approval dated 29 August 2025
  • LPG approval from DCD dated 16 September 2025
  • Building completion certificate from DDA dated 22 October 2025
  • Water and electricity meters connected
In Progress at 100%
  • Snagging works, listed as ongoing in the 4 November 2025 notes
  • Handover preparation for Moor's 198 apartments, scheduled for November 2026
Ahead of Handover
  • Handover notice from Emaar under each buyer's SPA
  • The 20% instalment the launch schedule ties to 100% completion and dates to November 2026
  • Buyer snagging inspection, defect rectification and key collection
  • Registered completion date of 30 November 2026
Next inspectionNo reading can move beyond 100%; what can still change is the register's status or dates, so check project 2555 on Dubai REST for any entry later than 4 November 2025.
Completion target30 November 2026 per the DLD register, matching the November 2026 handover and not yet reached when this page was prepared, 68 days ahead of it.
Remaining distance0 percentage points: construction is recorded complete, and what the 4 November 2025 record left open was snagging and handover rather than building.

Payment Linked Progress

What 100% Progress Means for Moor Buyers

Moor's July 2024 launch schedule ties seven instalments to construction milestones from 40% to 100%, yet prints calendar dates for each of them. With 100% recorded on 4 November 2025, every one of those triggers had been reached while the 80%, 90% and 100% instalments still carried February 2026, May 2026 and November 2026 dates: trigger and calendar are out of step, and only your own SPA clause decides which one governs your payments. At this stage of Moor, four actions matter most.

Before Any Remaining Payment

Verify the escrow account

Any balance still due on a Moor apartment should go only to the DLD regulated escrow account registered for project 2555, an account attached to the whole registration rather than to Moor alone. Moor at Dubai Creek Harbour escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.

Before the Handover Notice

Reread your SPA milestone schedule

Find the clause that triggers your 80%, 90% and 100% instalments, the certified reading or the printed date, and how it sets the handover notice period against the 30 November 2026 registered completion. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the certified milestones.

Window Open Now

Book the snagging inspection

At 100%, with snagging works listed as ongoing in the 4 November 2025 inspection notes, Moor is past the booking threshold and into the final run to its November 2026 handover. The Moor at Dubai Creek Harbour snagging inspection guide covers what to document before you accept the keys.

Every Cycle

Track the handover record

With construction closed, the changes still to come are to status and dates rather than percentages. The Moor at Dubai Creek Harbour construction updates hub records each one on the way to handover.

General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.

Buying at 100%?

Entering Moor at this point trades payment-plan runway for a finished product: the build is certified complete, the keys are scheduled for November 2026, and the choice left is among the few apartments Emaar still holds. Every payment goes to the DLD-registered escrow account for project 2555, released against certified construction progress.

Entering Now at 100%
  • Construction recorded complete on 4 November 2025, so no build risk is left to carry
  • A finished apartment you can inspect before the November 2026 handover
  • Current terms confirmed by Emaar unit by unit, not the 2024 launch calendar
Typical Launch Entry
  • Build risk carried from the first excavation to the last inspection
  • A delivery horizon usually measured in years, not months
  • A longer instalment runway at launch pricing
AED 1.68M ≈ USD 457KStarting Price
80/20 at Launch (Computed)Launch Schedule of Record
November 2026Scheduled Handover
Ask What Is Available at Moor

05 units listed available on the Moor project page as of this update; availability shifts between cycles.

About the Development

Moor at Dubai Creek Harbour Project Details

Moor at Dubai Creek Harbour by Emaar Properties waterfront residential buildings with landscaped promenade and park views in Dubai Presented by Tohid Fetrat
Dubai Creek Harbour · Emaar

With every construction activity recorded complete, Moor is a finished development of 198 apartments, from one to three bedrooms, spread across four mid-rise buildings in the Creek Beach district, with snagging listed as ongoing at the 4 November 2025 inspection. Starting prices: AED 1.68M ≈ USD 457K.

Entering now, a buyer gives up construction runway in exchange for a finished building that can be inspected before the balance is paid, with handover scheduled for November 2026 and a registered completion date of 30 November 2026.

Moor at Dubai Creek Harbour Project Guide

Site Context This Cycle

Explore Moor at Dubai Creek Harbour Location on Dubai Map

Moor stands on plot 169 in Al Khairan First, the plot registered for project 2555, inside the Creek Beach district of Dubai Creek Harbour, where its four mid-rise buildings sit among similar-scale Emaar apartment neighbours rather than on the creek frontage. With the shells, approvals and meter connections recorded complete, the work the 4 November 2025 notes left open was internal: snagging inside finished apartments and shared areas.

Dubai Creek Harbour is still being built out around Moor, with off-plan launches elsewhere in the master community, so Moor completes into a district where Creek Beach, the Harbour Promenade and Central Park sit within walking distance while neighbouring sites stay active. By the developer's figures, the drive is about 10 minutes to Burj Khalifa and Downtown Dubai and about 15 minutes to Dubai International Airport, the commute that buyers planning to occupy or let from November 2026 should test. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Moor at Dubai Creek Harbour by Emaar on Dubai Map

Buyer Resources for This Project

Investing in Moor at Dubai Creek Harbour Between Completion and Handover

The handover preparation band is where residency checks, payment protection and defect inspection all come due at once. Each resource below is matched to where Moor stands right now.

Moor at Dubai Creek Harbour by Emaar Properties in Dubai Creek Harbour construction updates cover image featuring a project rendering of residential buildings around a landscaped courtyard with a children's playground and swimming pool in Dubai - Presented by Tohid Fetrat
You Are Here

Moor at Dubai Creek Harbour Construction Updates

This page: the 4 November 2025 inspection record, 100% for Moor's registration with snagging then ongoing.

Moor at Dubai Creek Harbour by Emaar Properties in Dubai Creek Harbour Golden Visa card graphic above a landscaped park with outdoor fitness equipment and a residential building in Dubai - Presented by Tohid Fetrat

Moor at Dubai Creek Harbour Golden Visa in the Creek Beach District

Moor at Dubai Creek Harbour, 198 Emaar apartments under DLD project 2555, qualifies at 2 and 3 bedrooms only.

Read the Moor Golden Visa Guide
Moor at Dubai Creek Harbour by Emaar Properties in Dubai Creek Harbour escrow account protection concept with shield and padlock icons above a landscaped residential swimming pool in Dubai - Presented by Tohid Fetrat

Moor at Dubai Creek Harbour Escrow: A Mashreq Account at 100%

Moor at Dubai Creek Harbour reached 100% certified in November 2025, with 444 units escrowed at Mashreq under DLD project 2555.

Verify the Moor Escrow Account
Moor at Dubai Creek Harbour by Emaar Properties in Dubai Creek Harbour snagging inspection graphic over a furnished living and dining room with full height windows and palm views in Dubai - Presented by Tohid Fetrat

Moor at Dubai Creek Harbour Snagging in Four Mid-Rise Buildings

Moor at Dubai Creek Harbour is Emaar's collection of 198 freehold apartments, one to three bedrooms, in the Creek Beach district.

Book the Moor Snagging Inspection

Update Timeline

Other Moor at Dubai Creek Harbour Construction Updates

November 2025 is the first monthly record published for Moor; the construction updates hub carries the full inspection history and every status change between this reading and handover.

All Moor at Dubai Creek Harbour Construction Updates

FAQs

Moor at Dubai Creek Harbour Construction Progress in November 2025: Frequently Asked Questions

The DLD project register shows 100% construction progress for project 2555, the registration Moor sits under, at the inspection dated 4 November 2025, up 17 points from 83% at the previous inspection; the register does not give a date for that earlier reading. The same entry lists the project status as Finished and records no remarks against it.

Yes. The completion date on the DLD register for project 2555 is an entry that can be revised between records, and as of this update it reads 30 November 2026, in line with the November 2026 handover; on 23 September 2026 it was still 68 days away and had not lapsed. Reaching 100% in November 2025 did not by itself bring the date forward, and handover timing for each apartment follows the notice Emaar issues under that buyer's SPA.

The independent progress monitoring report for the 4 November 2025 visit states that all construction activities are completed and gives its progress status as Completed. It records a building completion certificate from DDA dated 22 October 2025, a DCD approval dated 29 August 2025 and an LPG approval from DCD dated 16 September 2025, notes that water and electricity meters are connected, and lists snagging works as ongoing. It describes Moor as four mid-rise buildings from G+M+5 to G+M+8 with 198 apartments between them.

Moor has no DLD registration of its own. It is registered under project 2555, Creek Beach - Canopy - Moor, which groups Moor's four buildings with the neighbouring Canopy buildings under one project number, one progress reading and one trust account. The 100% recorded on 4 November 2025 therefore describes the registration as a whole, and no Moor-only percentage is published by the register.

No. The 100% recorded on 4 November 2025 means construction is complete; it does not mean keys have been released. The inspection notes from that visit listed snagging works as ongoing, and handover is scheduled for November 2026, after each buyer receives a handover notice and settles what their SPA requires. How completion readings relate to handover is explained on the Moor at Dubai Creek Harbour construction updates hub.

No. The image is a developer rendering of Moor's planned pet park, used to illustrate this update, and it is not a record of what the site looked like in November 2025. The independent progress report for 4 November 2025 includes inspection photographs, but their captions do not identify Moor's buildings, so none of them is reproduced or relied on here.

Search the Dubai REST project register for project number 2555 or the name Creek Beach - Canopy - Moor. The project screen shows the status, the latest inspection date with its current and previous progress, and a downloadable inspection report. The 4 November 2025 entry was 323 days old on 23 September 2026, so confirm that no later inspection or date change has replaced it before relying on it.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the November 2025 inspection record for Moor at Dubai Creek Harbour correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts