Morocco 2 at DAMAC Lagoons Construction Updates
The DLD Register Record of 554 Moroccan-Inspired Villas and Townhouses Off Hessa Street
Morocco 2 reached 65.34% on the DLD register at its 17 July 2026 inspection, a climb in which the villa and townhouse superstructure was still progressing.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Morocco 2 at DAMAC Lagoons at a Glance
Morocco 2 at DAMAC Lagoons by DAMAC is a cluster of 554 villas and townhouses recorded on the Dubai Land Department register under project number 2690, and that register stood at 65.34% when RERA inspected the site on 17 July 2026. Almost three years separate that reading from the 29 August 2023 construction start, yet it is the only dated inspection on file, so the cards below are the fixed anchors this record rests on. Read the percentage as one average across 554 low-rise homes, not as the state of any single villa or townhouse.
2690
Active
29 August 2023
554 villas and townhouses
144,545.26 sq m
Q4 2026
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Morocco 2 at DAMAC Lagoons Construction Update Timeline
This record is short: one dated inspection, 65.34% on 17 July 2026, and an earlier 59.83% that the DLD register lists as the previous inspection but without a date, so it appears on the track below as a dot with no month and has no row in the table. The dated anchors before them are registration on 14 July 2023 and the 29 August 2023 construction start, where the track begins; the July 2026 row links the full monthly update.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| July 2026 | 65.34% | 17 July 2026 | View the July 2026 update |
Pace Analysis
How Fast Morocco 2 at DAMAC Lagoons Has Been Built
Only one reading on the Morocco 2 register carries a date, so no pace between two inspections can be measured yet. What the record does support is arithmetic against fixed dates, shown below and labelled as arithmetic, not a forecast:
- 29 Aug 2023 to 17 Jul 2026: whole-build average from construction start to 65.34% over 1,053 days (arithmetic, not a forecast)About 1.86 points per month
- 17 Jul 2026 to 31-12-2026: the remaining 34.66 points over 167 days to the close of the stated Q4 2026 handover quarter (arithmetic, not a forecast)About 6.23 points per month
Read together, the two figures describe the shape of the work still to come rather than a verdict on it. The 1.86 average folds in the enabling and foundation works that the RERA report of 17 July 2026 listed as substantially completed, along with a superstructure it still recorded as progressing; the 6.23 figure is simply what the 34.66 remaining register points would require if 100% were reached by the last day of Q4 2026. A cluster of 554 villas and townhouses need not climb at an even rate: in July the report had external works, finishes, the envelope and MEP all moving at different stages in parallel, and the weighting the register gives each package is not published. The undated 59.83% reading adds direction but no rate. For an end user planning a move, the useful step is written confirmation of the handover timetable from DAMAC; for an investor weighing an entry or exit, the next dated reading will give this record its first measured pace, and setting it against 6.23 is the clearest test of how the register and the Q4 2026 quarter line up.
Get the Next Inspection Figure First
Tell me you are tracking Morocco 2 at DAMAC Lagoons and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Morocco 2 at DAMAC Lagoons
A register percentage only means something next to what is being built. The project guide covers the 554 townhouses and villas this record follows toward the Q4 2026 handover:

Morocco 2 at DAMAC Lagoons, the Tranquility Hub
Morocco 2 at DAMAC Lagoons is the second phase of DAMAC's Morocco cluster, 554 townhouses and villas around a wellness theme.
View the Morocco 2 at DAMAC Lagoons Project GuideConsidering a Late-Stage Entry?
Limited units remain at Morocco 2, and the mix of what is on offer keeps moving as the build heads toward its Q4 2026 handover. If this record is what brought you here, ask me for current availability before the remaining choice narrows further.
Ask About Remaining Availability on WhatsAppStage Record
Morocco 2 at DAMAC Lagoons Build Stages, Mapped to the Inspections
Each stage below is pinned to the dates and RERA notes in Morocco 2's own record rather than to a generic build sequence. Because a single dated inspection covers 554 homes, several stages were running side by side on 17 July 2026, and the windows overlap accordingly.
Registration and Construction Start
DLD registration of project 2690 on 14 July 2023, followed 46 days later by the 29 August 2023 construction start, the point where the track above begins.
Enabling Works and Foundations
Site enabling and the foundations beneath the villas and townhouses, both recorded as substantially completed in the RERA report of 17 July 2026.
Substructure and Superstructure
The building frames for 554 homes, described by the RERA report as (B+G+1+R) and (G+1+R) villas, were at an advanced stage but still progressing on 17 July 2026.
Envelope, MEP, and Internal Works
On 17 July 2026 internal works were at an advanced stage while MEP, internal finishes and the external envelope each sat at different stages, overlapping frame work still under way.
External Works, Infrastructure, and Handover
External works and infrastructure were progressing in July 2026; the remaining 34.66 register points lead to 100% and the handover expected in Q4 2026.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Morocco 2 at DAMAC Lagoons's own record.
Buyer Position
Tracking Your Position at Morocco 2 at DAMAC Lagoons
This page is one of four project resources that together cover a Morocco 2 at DAMAC Lagoons purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Morocco 2 at DAMAC Lagoons Construction Updates
This page: the DLD register record for Morocco 2 from its August 2023 start to handover.

Morocco 2 at DAMAC Lagoons Golden Visa: One Qualifying Purchase
Morocco 2 at DAMAC Lagoons, 554 villas and townhouses, clears the threshold at all four home types on a single purchase.
Read the Morocco 2 at DAMAC Lagoons Golden Visa Guide
Morocco 2 at DAMAC Lagoons: The Second Morocco Escrow Account
Morocco 2 at DAMAC Lagoons pays Emirates NBD escrow as DLD project 2690, its 554 units 65.34% certified July 2026.
Verify the Morocco 2 at DAMAC Lagoons Escrow Account
Morocco 2 at DAMAC Lagoons Snagging Along Hessa Street
Morocco 2 at DAMAC Lagoons brings 554 DAMAC villas and townhouses in four home types to the master community.
Book Morocco 2 at DAMAC Lagoons SnaggingApproaching Handover
Between 65.34% and Handover: What Morocco 2 at DAMAC Lagoons Buyers Should Do Now
The 17 July 2026 reading left Morocco 2 just under the 70% mark that DAMAC's published launch payment plan uses for its first construction-linked instalment, with further instalments at 80% and 90% and 20% due on completion; the schedule a buyer signs is the one confirmed in the SPA, and later buyers' terms can differ. With handover expected in Q4 2026, those milestone calls and the handover notice your SPA sets can arrive close together, so the three steps below belong in the coming weeks, not on the day a notice lands.
First, match each construction-linked call against the register before paying: the launch plan ties 2% to 70% completion, 2% to 80% and 1% to 90%, and the Morocco 2 at DAMAC Lagoons escrow account page explains how those payments are held for project 2690.
Second, follow the dated readings rather than the headline figure alone; the Morocco 2 July 2026 RERA inspection notes explain the 65.34% reading, and the next dated reading will add the first measured pace to this record.
Third, line up an independent inspection of your villa or townhouse ahead of the Q4 2026 handover; the Morocco 2 at DAMAC Lagoons snagging page covers timing around the handover appointment and what to check.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore DAMAC Lagoons Structure
One cluster's register reading sits inside a much larger build-out. These three pages set Morocco 2's July 2026 progress against the DAMAC Lagoons market, the master community around it, and the developer delivering it:

DAMAC Lagoons: Mediterranean-Themed Villas, Townhouses, Apartments and Offices
DAMAC Lagoons sits opposite DAMAC Hills in Dubailand, with 11 themed clusters and 3 projects of villas, townhouses, apartments and offices.
See DAMAC Lagoons Properties for Sale
DAMAC Lagoons Community Overview
Read the DAMAC Lagoons guide: Mediterranean-themed clusters and crystal lagoons across a 45 million sq ft waterfront masterplan.
Explore the DAMAC Lagoons Community
DAMAC Properties: Lagoon Communities, Golf Villas and Branded Collaborations
Founded in 2002, DAMAC has delivered 48,000 homes and is known for large-scale master communities, luxury residential projects and branded collaborations.
View the DAMAC Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Morocco 2 at DAMAC Lagoons Construction Updates Frequently Asked Questions
Morocco 2 at DAMAC Lagoons stood at 65.34% on the DLD register after the RERA inspection of 17 July 2026, an active project under number 2690 whose RERA report of the same date gave its progress status as Main Contract, Progressing. That reading was 98 days old when this page was built on 23 October 2026; the full record is in the Morocco 2 inspection timeline above.
Progress at Morocco 2 at DAMAC Lagoons is tracked through the Dubai Land Department project register for project 2690, which posted 65.34% after the RERA inspection of 17 July 2026, 5.51 points above the previous 59.83% reading that the register lists without a date. Each dated reading gets its own row in the timeline and its own monthly page, beginning with the Morocco 2 July 2026 construction update.
No registered completion date for Morocco 2 at DAMAC Lagoons appears in the records reviewed for this page. The Dubai REST project screens reviewed for project 2690 show the registration date of 14 July 2023 and the start date of 29 August 2023, and the RERA report of 17 July 2026 prints no completion date, so none is shown and none is estimated. The handover expected for Morocco 2 is Q4 2026; to look for a registered date, search Dubai REST for Damac Lagoons - Morocco 2 or project 2690, and read the completion clause in your own SPA.
Morocco 2 at DAMAC Lagoons comprises 554 homes, the count shown on the DLD register for project 2690 and on the RERA report of 17 July 2026. That report describes them as (B+G+1+R) and (G+1+R) villas, meaning basement, ground, first and roof levels or ground, first and roof levels, built with a concrete structure and blockwork and carrying internal and external finishes. The homes offered are 4 and 5 bedroom townhouses and 6 and 7 bedroom villas; no labelled built-up area figure appears in the records reviewed, so none is quoted.
Arithmetic on the Morocco 2 at DAMAC Lagoons record gives a whole-build average of about 1.86 points per month: 65.34% over the 1,053 days from the 29 August 2023 start to the 17 July 2026 reading. Reaching 100% by the end of Q4 2026 would take about 6.23 points per month over the remaining 167 days. Both figures are arithmetic, not a forecast; the next dated reading will allow the first measured pace, and the working is set out in the Morocco 2 pace analysis above.
Morocco 2 at DAMAC Lagoons entered the Dubai Land Department register as project 2690 on 14 July 2023, and work on site followed 46 days later, with construction starting on 29 August 2023. The only dated inspection on its record, 65.34% on 17 July 2026, came 1,053 days after that start, so the earlier years appear on this page as dated milestones and stage windows rather than as inspection rows.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Morocco 2 at DAMAC Lagoons construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.