Morocco at DAMAC Lagoons Construction Updates
The DLD Register Record for 470 Villas and Townhouses off Hessa Street
Morocco at DAMAC Lagoons read 76.94% on the DLD register on 17 July 2026, leaving finishes, external works and infrastructure before its townhouses and villas reach handover.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Morocco at DAMAC Lagoons at a Glance
Morocco at DAMAC Lagoons by DAMAC is the cluster of 470 homes inside DAMAC Lagoons, the community off Hessa Street opposite DAMAC Hills. Registered with the Dubai Land Department on 14 July 2023 and started on site 46 days later on 29 August 2023, it read 76.94% on the register on 17 July 2026. That single figure averages four home types, from 4 bedroom townhouses to 7 bedroom villas, so any one buyer's home can sit a little above or below it.
2689
Active
29 August 2023
470 villas and townhouses
118,887.58 sq m
Q4 2026 (developer handover)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Morocco at DAMAC Lagoons Construction Update Timeline
The register carries one dated reading for Morocco so far: 76.94% on 17 July 2026, posted 1,053 days after the 29 August 2023 construction start. The same register card lists an earlier reading of 68.17% with no date attached, so it sits on the track below as an undated dot rather than as a table row. Each future dated reading adds a row here, linked to its own monthly update.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| July 2026 | 76.94% | 17 July 2026 | View the July 2026 update |
Pace Analysis
How Fast Morocco at DAMAC Lagoons Has Been Built
With a single dated reading, Morocco's record has no inspection-to-inspection pace to measure yet. It does support two pieces of arithmetic, and neither is a forecast:
- 29 Aug 2023 to 17 Jul 2026: whole-build average, 76.94 points over 1,053 daysAbout 2.19 points per month
- 17 Jul 2026 to 31 Dec 2026: the 23.06 points left to 100% over 167 days, to the end of the Q4 2026 handover quarterAbout 4.14 points per month
The two figures measure different things. The 2.19 average spreads the whole build evenly, from the enabling works after the August 2023 start to the superstructure the RERA report of 17 July 2026 records as substantially completed across the villas and townhouses. The 4.14 figure is only the straight line from the July reading to 100% by 31 December 2026: arithmetic to the stated handover quarter, not a forecast. The register's earlier 68.17% carries no date, so it cannot give a measured rate for the most recent stretch; the next dated reading will be the first to show how quickly finishes, external works and infrastructure are closing across the 470 homes. For an end user, that makes DAMAC's written handover timetable worth more than either number; for an investor, it is that next reading, set against Q4 2026, that turns this arithmetic into a measured pace.
Get the Next Inspection Figure First
Tell me you are tracking Morocco at DAMAC Lagoons and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Morocco at DAMAC Lagoons
The 76.94% recorded on 17 July 2026 measures progress on 470 Moroccan-inspired townhouses and villas. The project guide covers the homes this record is tracking toward handover:

Morocco at DAMAC Lagoons: Zellij-Style Interiors in Townhouses and Villas
Morocco at DAMAC Lagoons is a DAMAC cluster of 470 townhouses and villas, four to seven bedrooms, with Moroccan heritage interiors.
View the Morocco at DAMAC Lagoons Project GuideConsidering a Late-Stage Entry?
Buying into Morocco now means entering a cluster whose superstructure the RERA report of 17 July 2026 records as substantially completed, with handover expected in Q4 2026. Limited units remain available; if this record is what brought you here, ask me what is still on offer before the remaining choice narrows.
Ask About Remaining Availability on WhatsAppStage Record
Morocco at DAMAC Lagoons Build Stages, Mapped to the Inspections
Each stage below is pinned to a date or a RERA note from Morocco's own record rather than to a generic sequence, so the window labels show where the cluster's townhouses and villas stood when the register read 76.94% on 17 July 2026.
Registration and Construction Start
DLD registration as project 2689 on 14 July 2023, followed 46 days later by the 29 August 2023 construction start this page counts from.
Enabling Works and Foundations
Enabling and foundation works across the villa and townhouse plots, both recorded as substantially completed in the RERA report of 17 July 2026.
Substructure and Superstructure
Basement levels where fitted and the concrete frames of homes the RERA report describes as (B+G+1+R) and (G+1+R), substantially completed by the 17 July 2026 inspection.
Envelope, MEP, and Internal Works
Internal, MEP and external envelope works at advanced stages, with infrastructure progressing, under a RERA progress status of Main Contract, Progressing on 17 July 2026.
Finishes, External Works, and Handover
Finishes and external works, at different stages from home to home in July 2026, carry the remaining 23.06 points toward handover expected in Q4 2026.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Morocco at DAMAC Lagoons's own record.
Buyer Position
Tracking Your Position at Morocco at DAMAC Lagoons
This page is one of four project resources that together cover a Morocco at DAMAC Lagoons purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Morocco at DAMAC Lagoons Construction Updates
This page: every dated DLD register reading for Morocco, from the August 2023 start to handover.

Morocco at DAMAC Lagoons Golden Visa: A Single Home Is Enough
Morocco at DAMAC Lagoons, 470 DAMAC villas and townhouses, reaches the threshold at all four home types on their own.
Read the Morocco at DAMAC Lagoons Golden Visa Guide
Morocco at DAMAC Lagoons: The Escrow, 76% Certified
Emirates NBD holds Morocco at DAMAC Lagoons escrow as DLD project 2689, 470 units, 76.94% certified in July 2026.
Verify the Morocco at DAMAC Lagoons Escrow AccountMorocco at DAMAC Lagoons Snagging for Villas and Townhouses
Morocco at DAMAC Lagoons is a cluster of 470 homes, 4 and 5 bedroom townhouses and 6 and 7 bedroom villas.
Book Morocco at DAMAC Lagoons SnaggingApproaching Handover
Between 76.94% and Handover: What Morocco at DAMAC Lagoons Buyers Should Do Now
After the 17 July 2026 reading, what stood between Morocco and 100% was finishing, external works and infrastructure rather than new structure, and that is the stretch where a buyer's own preparation decides how smoothly handover goes. The time between a completion notice and the handover appointment is set by your SPA and can be short, so the three steps below are worth starting now rather than when DAMAC's notice arrives.
First, arrange an independent inspection of your villa or townhouse so defects are on record before you accept it; the Morocco at DAMAC Lagoons snagging inspections page sets out what to check, from roof and basement levels to gardens and decorative tilework.
Second, check every remaining installment, the completion payment included, against the Morocco at DAMAC Lagoons escrow account page, so funds only ever reach the Emirates NBD account registered for project 2689.
Third, if residency is part of the plan, settle eligibility early through the Morocco at DAMAC Lagoons Golden Visa guide, since the move from Oqood to title deed at handover shapes the application route.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore DAMAC Lagoons Structure
A build record reads best next to what surrounds it. These three pages set the Morocco cluster's progress against its community's listings, the master community itself, and the developer building it:

DAMAC Lagoons: Mediterranean-Themed Villas, Townhouses, Apartments and Offices
DAMAC Lagoons sits opposite DAMAC Hills in Dubailand, with 11 themed clusters and 3 projects of villas, townhouses, apartments and offices.
See DAMAC Lagoons Properties for Sale
DAMAC Lagoons Community Overview
Read the DAMAC Lagoons guide: Mediterranean-themed clusters and crystal lagoons across a 45 million sq ft waterfront masterplan.
Explore the DAMAC Lagoons Community
DAMAC Properties: Lagoon Communities, Golf Villas and Branded Collaborations
Founded in 2002, DAMAC has delivered 48,000 homes and is known for large-scale master communities, luxury residential projects and branded collaborations.
View the DAMAC Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Morocco at DAMAC Lagoons Construction Updates Frequently Asked Questions
Morocco at DAMAC Lagoons is an Active DLD-registered project, number 2689, recorded at 76.94% on the Dubai Land Department register on 17 July 2026, its latest dated reading. The RERA report of the same date gives the progress status as Main Contract, Progressing, and the full record sits in the Morocco inspection timeline above.
Progress at Morocco at DAMAC Lagoons is tracked through the Dubai Land Department register for project 2689, which read 76.94% on 17 July 2026, 8.77 points above its previous reading of 68.17%, a figure the register shows without a date. Each dated reading is paired with the RERA report of the same inspection and published as a monthly record, beginning with the Morocco at DAMAC Lagoons construction update for July 2026.
No registered completion date appears in the DLD and RERA records reviewed for Morocco at DAMAC Lagoons as of the 17 July 2026 reading, so this page prints none and uses the expected handover of Q4 2026. Buyers can check the current entry for project 2689, listed on Dubai REST as Damac Lagoons - Morocco 1, compare it with the completion terms in their SPA, and seek DAMAC's handover timetable in writing.
Morocco at DAMAC Lagoons comprises 470 homes across 4 and 5 bedroom townhouses and 6 and 7 bedroom villas. The RERA report of 17 July 2026 lists the configurations as (B+G+1+R) and (G+1+R), meaning homes with and without a basement level beneath ground, first and roof levels, built in concrete and block.
Across the whole build, Morocco at DAMAC Lagoons averaged about 2.19 points per month: 76.94 points over the 1,053 days from the 29 August 2023 start to the 17 July 2026 reading. Reaching 100% by 31 December 2026, the end of the Q4 2026 handover quarter, works out at about 4.14 points per month over the remaining 167 days; both figures are arithmetic, not a forecast, and the breakdown is in the pace analysis.
Morocco at DAMAC Lagoons was registered with the Dubai Land Department on 14 July 2023 as project 2689, and construction started on 29 August 2023, 46 days later. The only dated reading on the register so far is 76.94% on 17 July 2026; the earlier 68.17% reading carries no date.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Morocco at DAMAC Lagoons construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.