Palm Central Frond M read 0.08% on 15 September 2026, its third RERA reading and the first to log enabling works between Fronds M and N.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Palm Central Frond M at a Glance
Palm Central Frond M is Nakheel's collection of 212 residences in three buildings on the Spine of Palm Jebel Ali, set between Fronds M and N, with handover expected in August 2029. Its first RERA inspection, on 21 October 2025, came six days before project 4156 was entered on the DLD register on 27 October 2025, so this record opens with a 0% baseline taken ahead of the registration itself. The anchors below frame a plot that read 0.08% on 15 September 2026, where everything from the basements under Buildings A and B to the roofs of all three buildings is still ahead.
4156
Active
02 January 2026
212 residential units
33,733.95 sq m
31 July 2029 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Palm Central Frond M Construction Update Timeline
Three dated readings make up the Palm Central Frond M record so far: 0% at the baseline visit of 21 October 2025, 0.02% on 08 June 2026 with mobilisation under way, and 0.08% on 15 September 2026 as infrastructure works were starting. The whole spread is eight hundredths of a point across 329 days, which is why the three dots below sit almost on top of one another at the left edge of the track; each table row links the monthly update that documents that visit.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| September 2026 | 0.08% | 15 September 2026 | View the September 2026 update |
| June 2026 | 0.02% | 08 June 2026 | View the June 2026 update |
| October 2025 | 0% | 21 October 2025 | View the October 2025 update |
Pace Analysis
How Fast Palm Central Frond M Has Been Built
At this depth of the record, the useful measure is the change between readings, stated as plain arithmetic next to the stage label each report assigned. Palm Central Frond M has two such intervals so far:
- Oct 2025 to Jun 2026: baseline to mobilisation, 0% to 0.02%Up 0.02 points in 230 days
- Jun 2026 to Sep 2026: mobilisation to enabling works, 0.02% to 0.08%Up 0.06 points in 99 days
Those two intervals are too small to turn into a monthly rate, and this page does not try: hundredths of a point recorded during site preparation say nothing reliable about how quickly Buildings A, B and C will rise once structural work begins. The clearer signal is the Progress Status, which went from N/A on 21 October 2025 to Pre-Construction - Progressing on 08 June 2026 and Enabling Works - Progressing on 15 September 2026: three reports, three different stage labels. For an end user, nothing recorded yet either confirms or threatens the August 2029 handover. For an investor, the sharper figure sits in the payment schedule: on Nakheel's published 70/30 plan, 30% of the price is dated on or before September 2026 while the register read 0.08% on 15 September 2026, exactly the gap between money paid and work done that the project's escrow framework exists to protect.
Get the Next Inspection Figure First
Tell me you are tracking Palm Central Frond M and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Palm Central Frond M at Palm Central
A reading of 0.08% on 15 September 2026 only means something next to what the plot is meant to become. The project guide sets out what Palm Central Frond M buyers are tracking toward on this page:

Palm Central Frond M, Nakheel's Low-Rise Homes on the Spine
Palm Central Frond M is a Nakheel collection of 212 homes in three low-rise buildings, from apartments to five bedroom penthouses.
View the Palm Central Frond M Project GuideConsidering an Entry Before the Structure Rises?
The project page lists Palm Central Frond M at Limited Availability as of September 2026, and what remains on offer shifts between inspection cycles. If the record on this page is what brought you here, ask me what is currently available before you weigh an entry at the enabling works stage.
Ask About Remaining Availability on WhatsAppStage Record
Palm Central Frond M Build Stages, Mapped to the Inspections
Each stage below is tied to the window it occupies in the Palm Central Frond M record, from the October 2025 baseline to the August 2029 handover, so it is clear which stages the three reports have already covered and which no inspection has reached yet.
Baseline Visit and Registration
The first inspection found no construction activity on plot 7674 and assigned no status; project 4156 was registered six days later, on 27 October 2025.
Mobilisation and Enabling Works
From the 02 January 2026 recorded start: mobilisation logged at 0.02% on 08 June 2026, then infrastructure starting at 0.08% on 15 September 2026.
Basements and Below-Ground Works
Basements are specified under Buildings A and B only, since Building C starts at ground level; no report has recorded this work so far.
Structure of Buildings A, B and C
Ground plus six floors and a roof on each of the three buildings that will hold the 212 residences, a stage no inspection has reached.
Finishing and Handover
Handover is expected in August 2029, with 31 July 2029 as the registered completion date on the DLD register for project 4156.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Palm Central Frond M's own record.
Buyer Position
Tracking Your Position at Palm Central Frond M
This page is one of four project resources that together cover a Palm Central Frond M purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Palm Central Frond M Construction Updates
This page: every dated Palm Central Frond M inspection, from the October 2025 baseline onward.

Palm Central Frond M Golden Visa: Seven Types, Every One Above
Nakheel's Palm Central Frond M on Palm Jebel Ali, 212 residences, qualifies at all seven types, apartments, townhouse and penthouse.
Read the Palm Central Frond M Golden Visa Guide
Palm Central Frond M Escrow: Nakheel's Frond Account on Record
Nakheel's Palm Central Frond M is DLD project 4156, 212 units in First Abu Dhabi Bank escrow, 0.08% certified September 2026.
Verify the Palm Central Frond M Escrow AccountApproaching Handover
Between 0.08% and Handover: What Palm Central Frond M Buyers Should Do Now
With the register at 0.08% on 15 September 2026 and no building work yet recorded on Buildings A, B or C, the useful actions now concern payments and paperwork rather than the site itself. The next dated instalment on Nakheel's published schedule is 10% in February 2027, so the three checks below belong before that date, not after it.
First, confirm that every instalment goes into the project's DLD-registered account at First Abu Dhabi Bank; the Palm Central Frond M escrow account page shows how to match it to project 4156 before you transfer.
Second, if residency is part of your plan, read the Palm Central Frond M Golden Visa guide now, since the title deed is issued at handover, expected in August 2029, and off-plan timing shapes the application path.
Third, follow the stage label as well as the percentage: each report so far has moved it one step, and the September 2026 Palm Central Frond M inspection report records the latest move, into enabling works.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore Palm Central Structure
A build record that stood at 0.08% on 15 September 2026 is only one part of the picture; the rest is what surrounds plot 7674 on the island, set out in the Palm Jebel Ali community overview. These three pages place the Palm Central Frond M record in its listings, community, and developer context:

Palm Central Properties for Sale
Compare apartments, townhouses, penthouses, and beachfront residences across Palm Central Private Residences at Palm Jebel Ali by Nakheel.
See Palm Central Properties for Sale
Palm Central Community Overview
Palm Central is a waterfront residential district at the entrance of Palm Jebel Ali’s fronds, developed by Nakheel.
Explore the Palm Central Community
Nakheel: The Master Developer of Dubai's Island Living and Reclaimed Coastline
Founded in 2003, Nakheel created Palm Jumeirah and Dubai Islands, adding over 300 kilometers of coastline and building complete waterfront communities.
View the Nakheel Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Palm Central Frond M Construction Updates Frequently Asked Questions
Palm Central Frond M, DLD project 4156, is an active project at the enabling works stage, recorded at 0.08% at the RERA inspection of 15 September 2026, when the report noted mobilisation and infrastructure starting on the site. All three readings to date are set out in the inspection timeline above.
The inspection of 15 September 2026 recorded Palm Central Frond M at 0.08%, up 0.06 points from the 0.02% reading of 08 June 2026, and moved its Progress Status from Pre-Construction - Progressing to Enabling Works - Progressing. That visit is covered in full in the Palm Central Frond M September 2026 construction update.
Palm Central Frond M has moved 0.08 points in 329 days, from 0% on 21 October 2025 to 0.08% on 15 September 2026: 0.02 points over the first 230 days and 0.06 points over the following 99. Movements this small during site preparation support neither a monthly rate nor a projected date, so the pace analysis above states them as arithmetic only.
Handover of Palm Central Frond M is expected in August 2029, the month Nakheel's published payment plan gives as its estimated construction completion, and the DLD register carries a registered completion date of 31 July 2029 for project 4156, a date that has not yet passed. At 0.08% on 15 September 2026 the record is too early to confirm or question either date, and this page's record is updated as each later inspection is recorded.
The DLD register lists 212 residential units for Palm Central Frond M and a Total Built Area of 33,733.95 sq m, spread across three buildings between Fronds M and N on Palm Jebel Ali. Nearly all of that area remained to be built at the 0.08% reading of 15 September 2026.
The DLD register records a construction start of 02 January 2026 for Palm Central Frond M. The first tracked inspection came earlier, at 0% on 21 October 2025, six days before registration on 27 October 2025; that baseline is documented in the Palm Central Frond M October 2025 construction update, and the Palm Central Frond M June 2026 construction update shows the 08 June 2026 visit still finding mobilisation only, at 0.02%.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Palm Central Frond M construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.