Emaar Properties · Rashid Yachts & Marina
Porto View at Rashid Yachts & Marina Construction Updates
The Verified Build Record on Plot 516 at Mina Rashid
Porto View recorded 6.26% on the DLD register at its 02 June 2026 inspection, an early marina-side record of enabling, piling and foundation works.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Porto View at Rashid Yachts & Marina at a Glance
Porto View occupies plot 516 in Madinat Dubai Almelaheyah, registered with the Dubai Land Department as project 3306 and under construction since 22 February 2025. Emaar counts 114 residences in the development while the register lists 115 units for the same project, and the register put the build at 6.26% on 02 June 2026. The registration record describes the scheme as a shared ground and podium base carrying a six-floor part and a nine-floor part, which is why the opening percentages on this page measure work below the podium line rather than anything standing above it.
3306
Active
22 February 2025
114 residences (Emaar); 115 units on the DLD register
12,277.86 sq m
31 October 2028 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Porto View at Rashid Yachts & Marina Construction Update Timeline
This record opens with a single dated reading: 6.26% on the Dubai Land Department register for project 3306, verified on 02 June 2026. The register also carries an earlier figure of 5.82% with no date attached to it, so it anchors nothing on the track and no month is claimed for it here. June 2026 is the first published cycle for Porto View, and every reading recorded from here is added to the same track and table.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| June 2026 | 6.26% | 02 June 2026 | View the June 2026 update |
Pace Analysis
How Fast Porto View at Rashid Yachts & Marina Has Been Built
With one dated reading on the record, pace at Porto View is measured against the registered dates rather than between inspections. Two rates frame the build:
- 22 Feb 2025 start to the 02 Jun 2026 reading: enabling, piling and foundation, up to 6.26%About 0.4 points per month
- 02 Jun 2026 reading to the 31 Oct 2028 registered completion: 6.26% to 100%About 3.2 points per month required
The distance between those two rates is the whole shape of an early waterfront build. Substructure spends calendar without moving the register: just over fifteen months of enabling, piling and foundation work on plot 516 converted into 6.26 recorded points, because ground works are consumed by the load path rather than counted as completed building. The required rate ahead reads steep only while the site sits below the podium, since registered progress climbs fastest later, once repeated floors are being built above it. The qualifier that matters here is scale: a shared ground and podium base carrying a six-floor part and a nine-floor part offers fewer repeating levels to buy that speed than a tower does. For an end user the useful conclusion is that 2028 is still the date to plan around; for an investor tracking instalments called on 20%, 40% and 60% construction completion, the next few register entries decide the payment calendar long before the completion date does.
Get the Next Inspection Figure First
Tell me you are tracking Porto View at Rashid Yachts & Marina and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Porto View at Rashid Yachts & Marina at Mina Rashid
A register percentage only means something next to what it is building. The project guide covers the residences behind the 6.26% recorded on 02 June 2026:

Porto View at Rashid Yachts & Marina, Low-Rise by the Superyacht Harbour
Porto View at Rashid Yachts & Marina joins two low rise buildings by a landscaped podium, holding 114 apartments and townhouses.
View the Porto View at Rashid Yachts & Marina Project GuideConsidering an Early-Stage Entry?
Availability at Porto View shifts as the build passes each certified percentage. If the record on this page is what brought you here, ask me what is currently released before the next construction-completion call.
Ask About Remaining Availability on WhatsAppStage Record
Porto View at Rashid Yachts & Marina Build Stages, Mapped to the Inspections
Each stage below is anchored to where project 3306 actually sits in its own record rather than to a generic construction sequence, so the stages still ahead are marked as such instead of being described as progress.
Site Establishment on Plot 516
The registered construction start date for project 3306 is 22 February 2025, five months after its 23 September 2024 registration, opening the works that the June 2026 report later found in progress.
Enabling, Piling and Foundation
The independent progress monitoring report dated 02 June 2026 found enabling, piling and foundation works progressing and the main contract progressing, with the DLD register at 6.26% for project 3306 on that date.
Podium Base
The registration record describes a shared ground and podium base under both parts of the scheme, so this is the stage that follows the foundation work counted in the 6.26% reading.
The Six-Floor and Nine-Floor Parts
Project 3306 is registered as a part of six floors plus roof and a part of nine floors plus roof; on the sale plan this band sits alongside the instalments called at 40% and 60% construction completion in 2027.
Completion and Handover
The registered completion date for project 3306 is 31 October 2028 and the final 20% instalment is called on 100% construction completion in October 2028, which is the point this record closes at.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Porto View at Rashid Yachts & Marina's own record.
Buyer Position
Tracking Your Position at Porto View at Rashid Yachts & Marina
This page is one of four project resources that together cover a Porto View at Rashid Yachts & Marina purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Porto View at Rashid Yachts & Marina Construction Updates
This page: the Porto View register record for project 3306, at 6.26% on 02 June 2026.

Porto View at Rashid Yachts & Marina Golden Visa: Three Marina Tiers
Emaar's Porto View at Rashid Yachts & Marina, 114 waterfront residences, qualifies at 2 and 3 bedroom apartments and townhouses.
Read the Porto View at Rashid Yachts & Marina Golden Visa Guide
Porto View at Rashid Yachts & Marina: The Marina Escrow Record
Porto View at Rashid Yachts & Marina escrows 115 units at First Abu Dhabi Bank, project 3306, 6.26% certified June 2026.
Verify the Porto View at Rashid Yachts & Marina Escrow AccountApproaching Handover
Between 6.26% and Handover: What Porto View at Rashid Yachts & Marina Buyers Should Do Now
At 6.26% on the 02 June 2026 register reading, the work that decides a buyer's next twelve months is not on the site, it is on the payment schedule. Porto View sells on a construction-linked plan whose remaining instalments are called on certified completion percentages rather than on dates alone, so the next few register entries for project 3306, not the October 2028 date at the end, set when money is due. Three things are worth settling while the build is still below the podium.
First, check your remaining instalments against the certified milestones held in the project trust account; the Porto View escrow account page sets out how the 20%, 40% and 60% construction-completion calls are released.
Second, if the purchase may support residency, establish eligibility now rather than close to handover, because registration and title timing shape the route; the Porto View Golden Visa guide covers the qualifying thresholds.
Third, follow the record itself: the June 2026 site report is the first published cycle for project 3306, and each new register reading is added to the timeline on this page as it is recorded.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore Mina Rashid Structure
A build record is only half the picture; the other half is the district rising around plot 516. These three pages put the 6.26% recorded for Porto View on 02 June 2026 into its community and developer context:

Mina Rashid Properties for Sale
Browse waterfront apartments for sale at Rashid Yachts & Marina, with projects, prices and payment plans.
See Mina Rashid Properties for Sale
Mina Rashid Community Overview
Read the Rashid Yachts & Marina guide: Emaar's transformation of historic Port Rashid into a marina lifestyle community.
Explore the Mina Rashid Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Porto View at Rashid Yachts & Marina Construction Updates Frequently Asked Questions
Porto View is an active DLD-registered project (number 3306) in its enabling, piling and foundation phase, carried on the Dubai Land Department register at 6.26% on 02 June 2026. The independent progress monitoring report of the same date records the main contract as progressing and the Dubai Land Department register holds no remarks against the project. The full record is in the inspection timeline above.
The inspection dated 02 June 2026 found enabling, piling and foundation works progressing on plot 516, and the Dubai Land Department register carried 6.26% for project 3306 on that date. This is the first dated reading on the record, so there is no dated earlier figure to measure a point change against; the register also holds a previous reading of 5.82% that carries no date. The site report is published in the June 2026 construction update.
The registered completion date recorded with the Dubai Land Department for project 3306 is 31 October 2028, and Emaar states a Q4 2028 handover. With the register at 6.26% on 02 June 2026 the build is still in its substructure band, roughly 29 months from that registered date, and this page is updated as each new reading is recorded.
Emaar counts 114 residences at Porto View: 53 one-bedroom, 48 two-bedroom and 9 three-bedroom apartments, plus 4 three-bedroom townhouses. The Dubai Land Department register lists 115 units for project 3306, a one-unit difference between the developer count and the registration record. No verified total built-up area is published for the project, so no area figure is stated on this page.
Construction started on 22 February 2025, five months after project 3306 was registered with the Dubai Land Department on 23 September 2024. The first dated reading on this record, 02 June 2026, put the register at 6.26%, which represents just over fifteen months of enabling, piling and foundation work, an average of about 0.4 percentage points per month.
As of the 02 June 2026 report, enabling, piling and foundation works were progressing on plot 516 and nothing above the podium line is recorded. The registration record describes the scheme as a shared ground and podium base with a six-floor part and a nine-floor part, so the parts that will be visible follow the substructure rather than running alongside it. The stage-by-stage position is set out in the stage record above.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Porto View at Rashid Yachts & Marina construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.