Imtiaz Developments · Downtown Jebel Ali
RAW District 2 Construction Updates
The Two-Tower Sheikh Zayed Road Record, Opened at Its 0% Baseline
RAW District 2 read 0% in the DLD register on 08 July 2026, opening the record every later Tower A and Tower B reading will extend.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
RAW District 2 at a Glance
RAW District 2 is the second Imtiaz Developments building in Downtown Jebel Ali: 770 units over a 3B + G + 5P + 16 + R configuration, registered as DLD project 4526 on 24 July 2026, with handover scheduled for Q2 2029. Its record opens ahead of its works. The only reading, 0% on 08 July 2026, was logged before that registration and before the registered construction start of 01 December 2026, so for now this page documents a starting line on Sheikh Zayed Road rather than a building climbing from it.
4526
Active
01 December 2026
770 units
56,998.22 sq m
01 December 2029 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
RAW District 2 Construction Update Timeline
A single dated reading makes up the RAW District 2 record so far: 0% in the DLD register on 08 July 2026, taken when the RERA monitor found that no construction activities had started on the plot. That is why the track below carries one dot at its very first position, and why the table holds one row, linked to the July 2026 update where the inspection is set out in full. No date for the next reading appears in the record; it joins this timeline when it is published.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| July 2026 | 0% | 08 July 2026 | View the July 2026 update |
Pace Analysis
How Fast RAW District 2 Has Been Built
Pace is measured between two dated readings, and RAW District 2 has one, so this section sets out the reference arithmetic that its first measured pace will later be read against:
- 01 Dec 2026 to 01 Dec 2029: registered start to registered completion, 0% to 100% over 1,096 daysAbout 2.74 points per month (arithmetic, not a forecast)
- Measured pace between inspections: one reading on record, 0% on 08 July 2026Not yet measurable
There is no curve to read yet, and that absence is the finding: with its only reading taken before the registered start, RAW District 2 has produced no velocity and no whole-build average. What the record does fix is a reference line. Spread evenly across the 1,096 days between its two registered dates, the full 100 points work out at about 2.74 points per 30-day month; that is arithmetic, says nothing about delay or early delivery, and will be replaced by measured figures once two dated readings exist. Because the scheme opens with three basement levels, the earliest readings after 01 December 2026 relate to below-ground works, which come before the podium and the two towers rise above Sheikh Zayed Road. For an end user planning around the Q2 2029 handover, or an investor timing dated instalments against works on site, the second reading is the one to watch: it turns this reference line into a pace.
Get the Next Inspection Figure First
Tell me you are tracking RAW District 2 and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About RAW District 2 at Downtown Jebel Ali
A 0% baseline only makes sense next to what is planned for the plot. The full project guide covers the building this record will follow from its first foundations:

RAW District 2, Facing Flame Tree Park in Downtown Jebel Ali
RAW District 2 pairs a furnished residential tower with an office tower over a retail podium, 770 units by Imtiaz Developments.
View the RAW District 2 Project GuideConsidering a Pre-Construction Entry?
RAW District 2 units are being sold before works begin, and the choice of floors and layouts narrows as each release sells. If the 08 July 2026 baseline on this page is what brought you here, ask me for current availability while that choice is still wide.
Ask About Remaining Availability on WhatsAppStage Record
RAW District 2 Build Stages, Mapped to the Inspections
Each stage below is tied to the dates the RAW District 2 register actually holds: one inspection on 08 July 2026, registration on 24 July 2026 and a registered start of 01 December 2026. Stages after that start carry no reading yet and will be dated as inspections record them.
Baseline Inspection
The RERA monitor visited on 08 July 2026 and found no construction activities started; the DLD register logged 0% and the report gave a Progress Status of N/A.
Registration and Pre-Construction
Registered as DLD project 4526 on 24 July 2026, with units on sale and the first dated instalment of 15 November 2026 falling before the registered start.
Enabling Works and Three Basements
Site enabling, foundations and the three basement levels beneath the podium open the register's timetable. No reading has been recorded for this stage yet.
Podium and Two Towers
Ground floor, five podium levels, then 16 floors and a roof across residential Tower A and office Tower B. No reading has been recorded for this stage yet.
Facade, Furnishing and Handover
The raw concrete and bronze glass facade, furnished apartment fit-out, podium retail and roof amenities close the build. No reading has been recorded for this stage yet.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on RAW District 2's own record.
Buyer Position
Tracking Your Position at RAW District 2
This page is one of four project resources that together cover a RAW District 2 purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

RAW District 2 Construction Updates
This page: the register record for RAW District 2, from its July 2026 baseline to handover.

RAW District 2 Golden Visa: Six Tiers, One Above the Line
RAW District 2, Imtiaz's 770-unit mixed-use building, has only retail above the threshold; apartments and offices sit below.
Read the RAW District 2 Golden Visa Guide
RAW District 2 Escrow, a Dubai Islamic Bank Account in Jebel Ali
RAW District 2 holds 770 units' escrow at Dubai Islamic Bank, DLD project 4526, 0% certified July 2026.
Verify the RAW District 2 Escrow AccountApproaching Handover
Between 0% and Handover: What RAW District 2 Buyers Should Do Now
With nothing yet built at the 08 July 2026 inspection, the decisions that matter at RAW District 2 concern where your money goes and which record you follow, not the building itself. The timing is tighter than a 0% reading suggests: the first dated instalment, 5% on 15 November 2026 under either published plan, falls due 16 days before the registered construction start of 01 December 2026, so the three steps below belong before that date.
First, make sure every instalment, starting with the 15 November 2026 payment, is directed to the project escrow account at Dubai Islamic Bank; the RAW District 2 escrow account page shows how to check it against the DLD record for project 4526.
Second, if residency is part of your plan, read the RAW District 2 Golden Visa guide before choosing a tier: only Retail Spaces, at AED 2.90M ≈ USD 790K, is priced above the property threshold, and eligibility is decided by the authorities at application.
Third, follow the record rather than the marketing: the RAW District 2 July 2026 construction update documents the baseline inspection in full, and every later reading is added to the timeline on this page as it is published.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore Downtown Jebel Ali Structure
A build record that starts at zero is best read against what already stands around it. These three pages put the RAW District 2 baseline in its market, community and developer context:

Downtown Jebel Ali Properties for Sale
Browse apartments and new launches for sale in Downtown Jebel Ali, with prices and payment plans.
See Downtown Jebel Ali Properties for Sale
Downtown Jebel Ali Community Overview
Read the Downtown Jebel Ali guide: a metro-connected mixed-use district near JAFZA, Dubai South and Expo City Dubai.
Explore the Downtown Jebel Ali Community
Imtiaz Developments: Fully Furnished Residences in Dubai Islands, JVC and Meydan
Imtiaz Developments, founded in 2011, has completed and under-construction design led residential projects in Meydan, JVC and Dubai Islands.
View the Imtiaz Developments Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
RAW District 2 Construction Updates Frequently Asked Questions
RAW District 2 is an active DLD-registered project (number 4526) at the pre-construction stage, with a DLD register reading of 0% from the inspection dated 08 July 2026. The RERA monitoring report of that date found no construction activities started, and the registered construction start date is 01 December 2026. The full record is in the inspection timeline above.
One. The DLD register shows 0% for RAW District 2 at the inspection dated 08 July 2026, and no earlier reading exists, so there is no point change from a prior reading to report and no measured pace yet. That baseline inspection is documented in the July 2026 inspection record.
The DLD register gives 01 December 2026 as the registered construction start date for RAW District 2, project 4526. The first tracked reading, 0% on 08 July 2026, was taken before that date, so it stands as the baseline that every later reading on this page is measured from.
The DLD register lists 01 December 2029 as the registered completion date for RAW District 2, and the developer's published handover of Q2 2029 is earlier than that registered date. Neither date has passed, and the date that applies to each unit is the one recorded in its SPA.
About 2.74 points per 30-day month, as labelled arithmetic rather than a forecast: 100 points spread across 1,096 days, counted between the registered start (01 December 2026) and the registered completion (01 December 2029). No measured pace exists yet, because the only reading is 0% on 08 July 2026. The workings are in the pace analysis above.
RAW District 2 is configured as 3B + G + 5P + 16 + R: three basements, a ground floor, five podium levels, 16 floors and a roof. The floor plans place residential Tower A, with studios to 3 bedroom apartments, and office Tower B over a shared podium with ground-floor retail and F&B units.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the RAW District 2 construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.