RAW District 2 by Imtiaz Developments in Downtown Jebel Ali construction updates cover image featuring a project rendering of the mixed use buildings with landscaped surroundings in Dubai - Presented by Tohid Fetrat

Imtiaz Developments · Downtown Jebel Ali

RAW District 2 Construction Updates

The Two-Tower Sheikh Zayed Road Record, Opened at Its 0% Baseline

RAW District 2 read 0% in the DLD register on 08 July 2026, opening the record every later Tower A and Tower B reading will extend.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

0%Construction Progress
08 July 2026Latest RERA Inspection
770 unitsTotal Units
Project 4526DLD Registration

Construction Snapshot

RAW District 2 at a Glance

RAW District 2 is the second Imtiaz Developments building in Downtown Jebel Ali: 770 units over a 3B + G + 5P + 16 + R configuration, registered as DLD project 4526 on 24 July 2026, with handover scheduled for Q2 2029. Its record opens ahead of its works. The only reading, 0% on 08 July 2026, was logged before that registration and before the registered construction start of 01 December 2026, so for now this page documents a starting line on Sheikh Zayed Road rather than a building climbing from it.

DLD Project Number

4526

Project Status

Active

Construction Start

01 December 2026

Total Units

770 units

Total Built-Up Area

56,998.22 sq m

Registered Completion Date

01 December 2029 (DLD)

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

RAW District 2 Construction Update Timeline

A single dated reading makes up the RAW District 2 record so far: 0% in the DLD register on 08 July 2026, taken when the RERA monitor found that no construction activities had started on the plot. That is why the track below carries one dot at its very first position, and why the table holds one row, linked to the July 2026 update where the inspection is set out in full. No date for the next reading appears in the record; it joins this timeline when it is published.

Inspection MonthConstruction ProgressInspection DateFull Update
July 20260%08 July 2026View the July 2026 update

Pace Analysis

How Fast RAW District 2 Has Been Built

Pace is measured between two dated readings, and RAW District 2 has one, so this section sets out the reference arithmetic that its first measured pace will later be read against:

  • 01 Dec 2026 to 01 Dec 2029: registered start to registered completion, 0% to 100% over 1,096 daysAbout 2.74 points per month (arithmetic, not a forecast)
  • Measured pace between inspections: one reading on record, 0% on 08 July 2026Not yet measurable

There is no curve to read yet, and that absence is the finding: with its only reading taken before the registered start, RAW District 2 has produced no velocity and no whole-build average. What the record does fix is a reference line. Spread evenly across the 1,096 days between its two registered dates, the full 100 points work out at about 2.74 points per 30-day month; that is arithmetic, says nothing about delay or early delivery, and will be replaced by measured figures once two dated readings exist. Because the scheme opens with three basement levels, the earliest readings after 01 December 2026 relate to below-ground works, which come before the podium and the two towers rise above Sheikh Zayed Road. For an end user planning around the Q2 2029 handover, or an investor timing dated instalments against works on site, the second reading is the one to watch: it turns this reference line into a pace.

Get the Next Inspection Figure First

Tell me you are tracking RAW District 2 and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About RAW District 2 at Downtown Jebel Ali

A 0% baseline only makes sense next to what is planned for the plot. The full project guide covers the building this record will follow from its first foundations:

RAW District 2 by Imtiaz Developments in Downtown Jebel Ali mixed use towers with illuminated podium frontage and a street view at sunset in Dubai - Presented by Tohid Fetrat

RAW District 2, Facing Flame Tree Park in Downtown Jebel Ali

RAW District 2 pairs a furnished residential tower with an office tower over a retail podium, 770 units by Imtiaz Developments.

View the RAW District 2 Project Guide

Considering a Pre-Construction Entry?

RAW District 2 units are being sold before works begin, and the choice of floors and layouts narrows as each release sells. If the 08 July 2026 baseline on this page is what brought you here, ask me for current availability while that choice is still wide.

Ask About Remaining Availability on WhatsApp

Stage Record

RAW District 2 Build Stages, Mapped to the Inspections

Each stage below is tied to the dates the RAW District 2 register actually holds: one inspection on 08 July 2026, registration on 24 July 2026 and a registered start of 01 December 2026. Stages after that start carry no reading yet and will be dated as inspections record them.

08 Jul 2026 at 0%

Baseline Inspection

The RERA monitor visited on 08 July 2026 and found no construction activities started; the DLD register logged 0% and the report gave a Progress Status of N/A.

Current Phase24 Jul 2026 to 01 Dec 2026

Registration and Pre-Construction

Registered as DLD project 4526 on 24 July 2026, with units on sale and the first dated instalment of 15 November 2026 falling before the registered start.

From 01 Dec 2026, registered start

Enabling Works and Three Basements

Site enabling, foundations and the three basement levels beneath the podium open the register's timetable. No reading has been recorded for this stage yet.

After the basements, no dated window yet

Podium and Two Towers

Ground floor, five podium levels, then 16 floors and a roof across residential Tower A and office Tower B. No reading has been recorded for this stage yet.

To Q2 2029 handover, registered completion 01 Dec 2029

Facade, Furnishing and Handover

The raw concrete and bronze glass facade, furnished apartment fit-out, podium retail and roof amenities close the build. No reading has been recorded for this stage yet.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on RAW District 2's own record.

Buyer Position

Tracking Your Position at RAW District 2

This page is one of four project resources that together cover a RAW District 2 purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

RAW District 2 by Imtiaz Developments in Downtown Jebel Ali construction updates cover image featuring a project rendering of the mixed use buildings with landscaped surroundings in Dubai - Presented by Tohid Fetrat
You Are Here

RAW District 2 Construction Updates

This page: the register record for RAW District 2, from its July 2026 baseline to handover.

RAW District 2 by Imtiaz Developments in Downtown Jebel Ali Golden Visa concept graphic with a gold card beside a project rendering of the mixed use buildings in Dubai - Presented by Tohid Fetrat

RAW District 2 Golden Visa: Six Tiers, One Above the Line

RAW District 2, Imtiaz's 770-unit mixed-use building, has only retail above the threshold; apartments and offices sit below.

Read the RAW District 2 Golden Visa Guide
RAW District 2 by Imtiaz Developments in Downtown Jebel Ali escrow account protection concept with shield and padlock icons above a project rendering of the mixed use buildings in Dubai - Presented by Tohid Fetrat

RAW District 2 Escrow, a Dubai Islamic Bank Account in Jebel Ali

RAW District 2 holds 770 units' escrow at Dubai Islamic Bank, DLD project 4526, 0% certified July 2026.

Verify the RAW District 2 Escrow Account

Approaching Handover

Between 0% and Handover: What RAW District 2 Buyers Should Do Now

With nothing yet built at the 08 July 2026 inspection, the decisions that matter at RAW District 2 concern where your money goes and which record you follow, not the building itself. The timing is tighter than a 0% reading suggests: the first dated instalment, 5% on 15 November 2026 under either published plan, falls due 16 days before the registered construction start of 01 December 2026, so the three steps below belong before that date.

First, make sure every instalment, starting with the 15 November 2026 payment, is directed to the project escrow account at Dubai Islamic Bank; the RAW District 2 escrow account page shows how to check it against the DLD record for project 4526.

Second, if residency is part of your plan, read the RAW District 2 Golden Visa guide before choosing a tier: only Retail Spaces, at AED 2.90M ≈ USD 790K, is priced above the property threshold, and eligibility is decided by the authorities at application.

Third, follow the record rather than the marketing: the RAW District 2 July 2026 construction update documents the baseline inspection in full, and every later reading is added to the timeline on this page as it is published.

Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore Downtown Jebel Ali Structure

A build record that starts at zero is best read against what already stands around it. These three pages put the RAW District 2 baseline in its market, community and developer context:

Aerial view of Downtown Jebel Ali highlighting modern mixed use developments and transport connectivity for Downtown Jebel Ali Properties for Sale.

Downtown Jebel Ali Properties for Sale

Browse apartments and new launches for sale in Downtown Jebel Ali, with prices and payment plans.

See Downtown Jebel Ali Properties for Sale
Downtown Jebel Ali master community and urban development layout in Dubai Presented by Tohid Fetrat

Downtown Jebel Ali Community Overview

Read the Downtown Jebel Ali guide: a metro-connected mixed-use district near JAFZA, Dubai South and Expo City Dubai.

Explore the Downtown Jebel Ali Community
Exterior view of INARA by Imtiaz featuring a contemporary luxury residential tower with elegant balconies, refined façade design, and landscaped surroundings in Dubai, Presented by Tohid Fetrat

Imtiaz Developments: Fully Furnished Residences in Dubai Islands, JVC and Meydan

Imtiaz Developments, founded in 2011, has completed and under-construction design led residential projects in Meydan, JVC and Dubai Islands.

View the Imtiaz Developments Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

RAW District 2 Construction Updates Frequently Asked Questions

RAW District 2 is an active DLD-registered project (number 4526) at the pre-construction stage, with a DLD register reading of 0% from the inspection dated 08 July 2026. The RERA monitoring report of that date found no construction activities started, and the registered construction start date is 01 December 2026. The full record is in the inspection timeline above.

One. The DLD register shows 0% for RAW District 2 at the inspection dated 08 July 2026, and no earlier reading exists, so there is no point change from a prior reading to report and no measured pace yet. That baseline inspection is documented in the July 2026 inspection record.

The DLD register gives 01 December 2026 as the registered construction start date for RAW District 2, project 4526. The first tracked reading, 0% on 08 July 2026, was taken before that date, so it stands as the baseline that every later reading on this page is measured from.

The DLD register lists 01 December 2029 as the registered completion date for RAW District 2, and the developer's published handover of Q2 2029 is earlier than that registered date. Neither date has passed, and the date that applies to each unit is the one recorded in its SPA.

About 2.74 points per 30-day month, as labelled arithmetic rather than a forecast: 100 points spread across 1,096 days, counted between the registered start (01 December 2026) and the registered completion (01 December 2029). No measured pace exists yet, because the only reading is 0% on 08 July 2026. The workings are in the pace analysis above.

RAW District 2 is configured as 3B + G + 5P + 16 + R: three basements, a ground floor, five podium levels, 16 floors and a roof. The floor plans place residential Tower A, with studios to 3 bedroom apartments, and office Tower B over a shared podium with ground-floor retail and F&B units.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the RAW District 2 construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

WhatsApp +971543443597
Get the Latest Status