Riverton House Construction Updates

The Dated Register Record of Ellington's Single Tower in Meydan Horizon

Riverton House was recorded at 0% on the DLD register at its 22 December 2025 inspection, the baseline for every later reading of this Meydan Horizon tower.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

0%Construction Progress
22 December 2025Latest RERA Inspection
151 unitsTotal Units
Project 4036DLD Registration

Construction Snapshot

Riverton House at a Glance

Riverton House is Ellington's single tower of 149 residences in Meydan Horizon, entered in the Dubai Land Department register as project 4036 and described in RERA's inspection report as B+G+4P+19F+R. The register lists a construction start of 01 December 2025 and one inspection, on 22 December 2025, at which the DLD reading was 0%, while its registration date of 02 July 2026 is recorded after that inspection. That leaves one of the shortest records a buyer can read: a single reading taken 21 days after the recorded start, set against a handover expected in Q4 2027, about two years further on.

DLD Project Number

4036

Project Status

Active

Construction Start

01 December 2025

Total Units

151 units

Total Built-Up Area

14,230.19 sq m

Registered Completion Date

31 December 2027 (DLD)

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

Riverton House Construction Update Timeline

The Riverton House record holds one dated entry: the RERA inspection of 22 December 2025, 21 days after the register's 01 December 2025 start, at which RERA's report noted no construction activity on the plot and gave a progress status of N/A, while the DLD register entered 0%. The track below therefore carries a single dot at its starting edge, the developer rendering under it illustrates the planned tower rather than the plot, and the table row links the full December 2025 update.

Inspection MonthConstruction ProgressInspection DateFull Update
December 20250%22 December 2025View the December 2025 update

Pace Analysis

How Fast Riverton House Has Been Built

Pace is measured between two dated readings, and the Riverton House record holds exactly one. Until project 4036 gains a second dated entry, the record reads like this:

  • 22 Dec 2025: first and only DLD register reading, RERA progress status N/A0% baseline
  • Pace between consecutive dated readings for project 4036Needs a second reading

There is no curve to read yet, and for Riverton House that is the finding. The register places the construction start on 01 December 2025, and the inspection 21 days later found no construction activities on site while the DLD reading stood at 0%. Dividing that single point by any span of time would produce arithmetic, not a measured pace, so no rate is printed on this page. Whether you are planning a Q4 2027 move or weighing an entry at the baseline as an investor, the useful step is the same: confirm the current construction timetable with the developer in writing, then set it against the next dated reading once the register publishes it.

Get the Next Inspection Figure First

Tell me you are tracking Riverton House and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About Riverton House at Meydan Horizon

The 0% reading of 22 December 2025 only means something next to what Ellington plans to deliver on the plot. The full project guide covers what buyers here are tracking toward:

Riverton House by Ellington in Meydan Horizon project rendering of a slender residential tower above a landscaped podium and trees in Dubai - Presented by Tohid Fetrat

Riverton House: A Compact Tower Between the Lagoon and the Park

Riverton House has a mix of 1, 2 and 3 bedroom apartments across 19 residential floors, with a fifth-floor amenity deck.

View the Riverton House Project Guide

Considering a Pre-Construction Entry?

Availability at Riverton House is listed as limited, and it shifts between inspection cycles. If the December 2025 baseline on this page is what brought you here, ask me what is currently available before the next reading is published.

Ask About Remaining Availability on WhatsApp

Stage Record

Riverton House Build Stages, Mapped to the Inspections

Each stage below is pinned to what the Riverton House register actually shows, and so far that is a single window: the three weeks from the 01 December 2025 start to the 0% reading of 22 December 2025. The later stages of this B+G+4P+19F+R tower carry no dated window until the register publishes readings that reach them.

01 Dec 2025, recorded start

Recorded Construction Start

The DLD register dates the Riverton House construction start to 01 December 2025, the opening entry in this record.

Current Phase22 Dec 2025 at 0%

Baseline Inspection

RERA's 22 December 2025 visit found no construction activity on the plot; RERA rated progress status N/A and the DLD register entered 0%.

No dated reading yet

Basement and Podium Levels

No reading on this record yet covers the basement or the four podium levels listed in RERA's B+G+4P+19F+R description of project 4036.

No dated reading yet

Residential Floors and Roof

The 19 floors and roof sit beyond the only reading; the four instalments tied to construction stages were all still untriggered at 0% on 22 December 2025.

Expected handover Q4 2027

Finishing and Handover

Finishing and handover of the 149 residences, expected in Q4 2027; the registered completion date for project 4036 is 31 December 2027.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Riverton House's own record.

Buyer Position

Tracking Your Position at Riverton House

This page is one of four project resources that together cover a Riverton House purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Riverton House by Ellington in Meydan Horizon construction updates cover image featuring a project rendering of a slender residential tower above landscaped grounds in Dubai - Presented by Tohid Fetrat
You Are Here

Riverton House Construction Updates

This page: the Riverton House DLD register record by date, opening at 0% in December 2025.

Riverton House by Ellington in Meydan Horizon Golden Visa concept graphic with a gold visa card above a rendered poolside terrace in Dubai - Presented by Tohid Fetrat

Riverton House Golden Visa: All Three Apartment Types Above the Line

All three Riverton House apartment types start above the Golden Visa threshold, the 1 bedroom by the narrowest of margins.

Read the Riverton House Golden Visa Guide
Riverton House by Ellington in Meydan Horizon escrow account concept graphic with shield and padlock icons over a rendered residential building and landscaped podium in Dubai - Presented by Tohid Fetrat

Riverton House Escrow: One Supervised Account at Commercial Bank of Dubai

Riverton House payments, from 20% booking instalment on, go to Commercial Bank of Dubai's escrow for DLD project 4036's 151 units.

Verify the Riverton House Escrow Account

Approaching Handover

Between 0% and Handover: What Riverton House Buyers Should Do Now

At the only reading on record, 0% on 22 December 2025, none of the four Riverton House instalments tied to 20%, 30%, 40% and 50% construction had been triggered, while the instalments at 60, 120, 180, 240 and 360 days run from each buyer's own reservation date. That split is why the three checks below belong at the start of a purchase rather than later: the calendar instalments fall due whatever the register shows.

First, before any transfer, confirm that your payments go to the trust account at Commercial Bank of Dubai registered for project 4036; the Riverton House escrow account page shows how to check it against the DLD record.

Second, if residency matters to your purchase, read the Riverton House Golden Visa eligibility guide before you choose a layout, because the 1 bedroom's starting price sits only just above the property threshold.

Third, follow the record rather than the marketing: the December 2025 Riverton House inspection page explains the 0% baseline and each new dated reading joins the timeline above; in the meantime, confirm the current construction timetable with the developer in writing.

Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore Meydan Horizon Structure

One dated reading says little on its own. These three pages set Riverton House against the Meydan Horizon market, the lagoon-and-park community it is planned into, and the developer responsible for it:

Street view of Meydan Horizon properties for sale in Dubai showing modern residential buildings, palm lined roads and urban community spaces, Presented by Tohid Fetrat

Meydan Horizon: The Symphony Apartments in a Lagoon District

Meydan Horizon, the Dubai Holding lagoon district beside Ras Al Khor Wildlife Sanctuary, has The Symphony apartments for sale.

See Meydan Horizon Properties for Sale
View of Meydan Horizon in Dubai showing modern high rise buildings, a central waterway and landscaped waterfront surroundings, Presented by Tohid Fetrat

Meydan Horizon: Four Crystal Lagoons Facing Ras Al Khor Wildlife Sanctuary

Meydan Horizon is a lagoon district planned for 72,000 residents, with towers by Ellington, Imtiaz and Dubai Investments.

Explore the Meydan Horizon Community
Exterior view of Ocean House by Ellington featuring sculptural architecture, curved balconies, lush landscaping, and luxury waterfront residences in Dubai. Presented by Tohid Fetrat.

Ellington Properties: Design-Led Boutique Residences With Curated Interiors

Ellington Properties, founded in 2014, is a design-led developer of apartments, villas and waterfront homes, with 30 developments launched and delivered.

View the Ellington Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

Riverton House Construction Updates Frequently Asked Questions

Riverton House is an active DLD-registered project (number 4036) at the earliest point of its record: the only reading, logged on the DLD register for the RERA inspection of 22 December 2025, was 0%, with no construction activities observed on site that day. By the end of October 2026 that reading had passed ten months of age, so Dubai REST is the place to check for any later entry; the dated record is in the inspection timeline above.

There is no previous reading to compare: 0% on 22 December 2025 is the first and only entry in the Riverton House register record, so no point change can be stated. That inspection is covered in full in the Riverton House December 2025 construction update, and any later reading becomes the first comparison against this baseline.

The DLD register lists 31 December 2027 as the registered completion date for project 4036, which falls inside Q4 2027, the quarter in which handover is expected. The register's only reading, 0% on 22 December 2025, came roughly two years ahead of that date, so buyers should confirm the current construction timetable with the developer in writing rather than read a timetable into one reading.

Riverton House is planned as 149 residences, split across 1, 2 and 3 bedroom apartments in one tower whose residential floors start above the podium levels. That is the building the DLD register measured at 0% on 22 December 2025.

B+G+4P+19F+R is how RERA's 22 December 2025 inspection report describes Riverton House: one basement level, the ground floor, four podiums, 19 upper floors and the roof, classed as a residential and commercial building, with Ellington's plans placing retail at ground level. The register reading at that inspection was 0%, so none of these levels had yet entered the record.

The DLD register records 01 December 2025 as the Riverton House construction start date. The first inspection followed 21 days later, on 22 December 2025, and RERA's inspector recorded no construction activity during the visit, while the register opened this record at 0%.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the Riverton House construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

WhatsApp +971543443597
Get the Latest Status