Emaar Properties · Dubai Creek Harbour · Construction Update
Rosewater at Dubai Creek Harbour Construction Update - November 2024
November 2024 Inspection Confirms Rosewater Reaches 100% Construction Progress in Dubai Creek Harbour
All construction at Rosewater is complete, with services connected and the pool, gym, parking and lobbies ready as the 07 November 2024 register reading reached 100 percent.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Rosewater Construction Snapshot
A 4.92 point rise from the previous register reading of 95.08% carried Rosewater through the top of the handover preparation band to 100% on 07 November 2024, turning this page from a progress check into a completion record. That reading is 685 days old as of 23 September 2026, so read it as history and confirm the live register before acting on it.
Rosewater at Dubai Creek Harbour
2193
Finished
100%
07 November 2024
01 April 2020
211 residential units
310,997.66 sq m
31 March 2023 (DLD)
Data source: DLD project register record for project 2193 (register name Creek Beach - Rosewater), inspection dated 07 November 2024, read with the Independent Progress Monitoring Report of the same date. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. The hero image is a developer rendering, not a photograph of the site. Last updated: September 2026.
Want the next Rosewater record update the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Rosewater at Dubai Creek Harbour Construction Progress Summary
Between a previous register reading of 95.08%, which the DLD record leaves undated, and the 07 November 2024 reading of 100%, Rosewater gained its final 4.92 points. The monitoring report of the same date states that all construction at site has been completed and lists the BCC dated 21 October 2024, the DCD certificate dated 09 August 2024 and lift safety certificates as received.
- Concrete structure and blockwork on Buildings 1, 2 and 3 (G+M+10, G+M+11 and G+M+7)
- Internal and external finishes across the 211 residences
- Services rooms, main meters and sub-meters completed, fixed and connected
- BCC dated 21 October 2024 received
- DCD certificate dated 09 August 2024 received
- Lift safety certificates received
- Pool area, gym, parking areas and lobbies ready
- Unit handover under each buyer's SPA and handover notice
- Pre acceptance snagging of each residence
- Defect rectification windows running from building completion
Payment Linked Progress
What 100% Progress Means for Rosewater Buyers
Rosewater launched on a 70/30 structure: 10% + 4% DLD on booking, six 10% instalments during construction, and the final 30% at construction completion. That is the launch structure of record, not a current offer. The 07 November 2024 reading of 100% is the milestone that final 30% was tied to, so for original buyers the plan has run its course and the open questions are handover and acceptance; your SPA defines the exact trigger. At this point for Rosewater, four actions matter most.
Verify the escrow account
Any balance still owed to the developer on a Rosewater unit should go only to the DLD regulated escrow account for project 2193, held with Mashreq Bank PSC. Rosewater escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA handover terms
Check how your sale and purchase agreement defines the completion payment, the handover notice period and any charges due at key collection, and map those clauses against the 07 November 2024 completion reading. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the certified milestones.
Book the snagging window
With construction complete and handover status Ready, any Rosewater residence not yet accepted can be inspected independently before sign off, and rectification windows run from building completion rather than from move in. Rosewater snagging inspection guide covers what to document before acceptance.
Keep the completion record on file
File the 100% reading with the BCC date of 21 October 2024 and the DCD date of 09 August 2024 alongside your SPA. Rosewater construction updates hub holds the full register history in one place.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 100%?
Buying a finished Rosewater residence trades the long instalment runway of the launch plan for certainty: the three buildings are complete, the completion documents are issued, and the unit you view is the unit you receive. Payments on developer-sold units went to the DLD-registered escrow account for project 2193, released against certified construction progress, and that progress is now certified at 100%.
- Construction complete: the register reads 100% and Finished
- Handover status Ready, with BCC and DCD certificates issued in 2024
- Residence and view inspected in person before you commit
- Construction and delivery risk carried until completion
- A multi year wait between booking and keys
- Choice made from plans and renders, with a longer instalment runway
Limited units available per the project page as of this update; availability shifts between cycles.
About the Development
Rosewater at Dubai Creek Harbour Project Details

With all construction completed and the register at 100%, Rosewater is a finished cluster of three mid-rise buildings, from G+M+7 to G+M+11, holding 211 apartments and penthouses beside Creek Beach. Starting prices: AED 1.70M ≈ USD 463K.
For buyers entering now, the trade off is a ready-property price against no construction wait: 2 bedroom apartments start at AED 2.55M ≈ USD 694K, 3 bedroom apartments at AED 3.95M ≈ USD 1.08M, and the 3 and 4 bedroom penthouses at AED 9.00M+ ≈ USD 2.45M+.
Rosewater at Dubai Creek Harbour Project GuideSite Context This Cycle
Explore Rosewater Location on Dubai Map
Rosewater sits on plot 169 in Al Khairan First, on the Creek Beach side of Dubai Creek Harbour, where the developer's massing plan places its three buildings around an inner plaza with a canal along the plot edge. That compact courtyard layout is why the November 2024 report closes on shared spaces rather than structure: the pool area, gym, parking areas and lobbies are the items recorded as ready.
Around the site, the 700 metre Creek Beach is a short stroll away and the developer brochure puts Creek Marina Yacht Club at 5 minutes, Burj Khalifa at 10 minutes and Dubai International Airport at 15 minutes, with a dedicated metro marked on its connectivity map as a planned link rather than an operating station. For a buyer taking a ready Rosewater unit now, the beach, marina and Vida hotel frontage are the daily setting while the rail connection remains a future addition. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Rosewater After Construction Completion
At completion the questions move from progress to residency, verification and acceptance. Each resource below matches where Rosewater stands after the November 2024 reading.

Rosewater Construction Updates
This page: the November 2024 register reading that closed Rosewater at 100% with completion certificates issued.

Rosewater at Dubai Creek Harbour Golden Visa: Three Tiers Above the Line
Rosewater at Dubai Creek Harbour, three Emaar buildings around a shared plaza, qualifies at 2 and 3 bedrooms and the penthouses.
Read Rosewater Golden Visa Guide
Rosewater at Dubai Creek Harbour: The Mashreq Escrow, Fully Certified
Rosewater at Dubai Creek Harbour is DLD project 2193, 211 units escrowed with Mashreq and 100% certified by November 2024.
Verify Rosewater Escrow Account
Rosewater at Dubai Creek Harbour Snagging for Apartments and Penthouses
Rosewater at Dubai Creek Harbour is three Emaar mid-rise buildings around an inner plaza, holding 211 apartments and penthouses.
Book Rosewater Snagging InspectionUpdate Timeline
Other Rosewater Construction Updates
November 2024 is the only monthly Rosewater report in this series; the hub carries the full register history, from registration in October 2019 to the Finished status.
Where This Update Fits
Explore Rosewater at Dubai Creek Harbour Structure
This completion report is one node in the wider record: the Creek Beach community around the three buildings, the developer that delivered them, and the ready listings they now compete with.

Dubai Creek Harbour Properties for Sale
Browse waterfront apartments, branded residences and penthouses for sale in Dubai Creek Harbour.
See Dubai Creek Harbour Properties for Sale
Dubai Creek Harbour: Emaar's Waterfront City With a Marina and Urban Beach
Dubai Creek Harbour is Emaar's waterfront city between Downtown Dubai and the Creek, planned for 48,500 homes with skyline views.
Explore the Dubai Creek Harbour Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileFAQs
Rosewater at Dubai Creek Harbour Construction Progress in November 2024: Frequently Asked Questions
The DLD project register recorded Rosewater, project 2193, at 100% construction progress on 07 November 2024, up 4.92 points from a previous reading of 95.08% that the register does not date. The same record lists the project status as Finished, and at the 23 September 2026 build of this page that reading was 685 days old.
On construction, yes: the Independent Progress Monitoring Report dated 07 November 2024 states that all construction at site has been completed, and handover status for Rosewater is Ready as of this update. The registered completion date in the DLD record lapsed before the completion documents were issued, so the certificate dates, not the registered date, are the figures that describe when the buildings were actually completed.
The 07 November 2024 monitoring report lists a BCC dated 21 October 2024, a DCD certificate dated 09 August 2024, and lift safety certificates as received. The report does not name the issuing authority for the BCC, so a buyer who needs the certificate itself for a mortgage valuation or a title file should obtain a copy from the developer or the conveyancing trustee rather than rely on the report summary.
The November 2024 monitoring report records the pool area, gym, parking areas and lobbies as ready, with all services rooms, main meters and sub-meters completed, fixed and connected. The developer one-pager also lists a kids pool, an expansive outdoor play area and the inner plaza, which the report does not itemise separately, so those are worth checking in person at viewing.
The report describes Rosewater as a Phase 3 residential mid-rise development of three buildings: Building 1 at G+M+10, Building 2 at G+M+11 and Building 3 at G+M+7, each with a concrete structure and block walls with internal and external finishes. As of 07 November 2024 all three were recorded as complete, and the DLD register counts 211 residential units across the cluster.
Treat it as the completion record rather than a live status: the 07 November 2024 reading was 685 days old on 23 September 2026, and any register change since then would only appear on the current DLD record for project 2193. The full inspection history, from registration in October 2019 to the Finished status, is kept on the Rosewater construction updates hub.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the November 2024 inspection record for Rosewater at Dubai Creek Harbour correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.