Rosewater at Dubai Creek Harbour Construction Update - November 2024

November 2024 Inspection Confirms Rosewater Reaches 100% Construction Progress in Dubai Creek Harbour

All construction at Rosewater is complete, with services connected and the pool, gym, parking and lobbies ready as the 07 November 2024 register reading reached 100 percent.

Direct advisor access. Every message answered personally, never by a call center.

100%Construction Progress
07 November 2024Inspection Date
ReadyHandover Status
2193DLD Project Number

Verified DLD Inspection Data

Rosewater Construction Snapshot

A 4.92 point rise from the previous register reading of 95.08% carried Rosewater through the top of the handover preparation band to 100% on 07 November 2024, turning this page from a progress check into a completion record. That reading is 685 days old as of 23 September 2026, so read it as history and confirm the live register before acting on it.

Project Name

Rosewater at Dubai Creek Harbour

Project Number

2193

Project Status

Finished

Construction Progress

100%

Inspection Date

07 November 2024

Construction Start

01 April 2020

Total Units

211 residential units

Total Built Area

310,997.66 sq m

Expected Completion

31 March 2023 (DLD)

Data source: DLD project register record for project 2193 (register name Creek Beach - Rosewater), inspection dated 07 November 2024, read with the Independent Progress Monitoring Report of the same date. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. The hero image is a developer rendering, not a photograph of the site. Last updated: September 2026.

Want the next Rosewater record update the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

This Inspection Cycle

Rosewater at Dubai Creek Harbour Construction Progress Summary

Between a previous register reading of 95.08%, which the DLD record leaves undated, and the 07 November 2024 reading of 100%, Rosewater gained its final 4.92 points. The monitoring report of the same date states that all construction at site has been completed and lists the BCC dated 21 October 2024, the DCD certificate dated 09 August 2024 and lift safety certificates as received.

Completed
  • Concrete structure and blockwork on Buildings 1, 2 and 3 (G+M+10, G+M+11 and G+M+7)
  • Internal and external finishes across the 211 residences
  • Services rooms, main meters and sub-meters completed, fixed and connected
Confirmed at 100%
  • BCC dated 21 October 2024 received
  • DCD certificate dated 09 August 2024 received
  • Lift safety certificates received
  • Pool area, gym, parking areas and lobbies ready
After Completion
  • Unit handover under each buyer's SPA and handover notice
  • Pre acceptance snagging of each residence
  • Defect rectification windows running from building completion
Next inspectionNo further construction cycle is shown: the register lists project 2193 as Finished at 100%.
Registered completion31 March 2023 in the DLD register; the completion documents are dated August and October 2024.
Remaining distanceZero percentage points: the 07 November 2024 reading closed the gap from 95.08%.
Reading age685 days at the 23 September 2026 update, so the current DLD record for project 2193 is the reference before any transaction.

Payment Linked Progress

What 100% Progress Means for Rosewater Buyers

Rosewater launched on a 70/30 structure: 10% + 4% DLD on booking, six 10% instalments during construction, and the final 30% at construction completion. That is the launch structure of record, not a current offer. The 07 November 2024 reading of 100% is the milestone that final 30% was tied to, so for original buyers the plan has run its course and the open questions are handover and acceptance; your SPA defines the exact trigger. At this point for Rosewater, four actions matter most.

Before Any Final Transfer

Verify the escrow account

Any balance still owed to the developer on a Rosewater unit should go only to the DLD regulated escrow account for project 2193, held with Mashreq Bank PSC. Rosewater escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.

Before Signing Handover Papers

Reread your SPA handover terms

Check how your sale and purchase agreement defines the completion payment, the handover notice period and any charges due at key collection, and map those clauses against the 07 November 2024 completion reading. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the certified milestones.

Window Open Now

Book the snagging window

With construction complete and handover status Ready, any Rosewater residence not yet accepted can be inspected independently before sign off, and rectification windows run from building completion rather than from move in. Rosewater snagging inspection guide covers what to document before acceptance.

After Handover

Keep the completion record on file

File the 100% reading with the BCC date of 21 October 2024 and the DCD date of 09 August 2024 alongside your SPA. Rosewater construction updates hub holds the full register history in one place.

General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.

Buying at 100%?

Buying a finished Rosewater residence trades the long instalment runway of the launch plan for certainty: the three buildings are complete, the completion documents are issued, and the unit you view is the unit you receive. Payments on developer-sold units went to the DLD-registered escrow account for project 2193, released against certified construction progress, and that progress is now certified at 100%.

Entering Now at 100%
  • Construction complete: the register reads 100% and Finished
  • Handover status Ready, with BCC and DCD certificates issued in 2024
  • Residence and view inspected in person before you commit
Typical Launch Entry
  • Construction and delivery risk carried until completion
  • A multi year wait between booking and keys
  • Choice made from plans and renders, with a longer instalment runway
AED 1.70M ≈ USD 463KStarting Price
ReadyHandover Status
211 ResidencesApartments and Penthouses
Ask What Is Available at Rosewater

Limited units available per the project page as of this update; availability shifts between cycles.

About the Development

Rosewater at Dubai Creek Harbour Project Details

Rosewater at Dubai Creek Harbour by Emaar Properties panoramic view of Creek Beach waterfront residences and Dubai skyline in Dubai Presented by Tohid Fetrat
Dubai Creek Harbour · Emaar Properties

With all construction completed and the register at 100%, Rosewater is a finished cluster of three mid-rise buildings, from G+M+7 to G+M+11, holding 211 apartments and penthouses beside Creek Beach. Starting prices: AED 1.70M ≈ USD 463K.

For buyers entering now, the trade off is a ready-property price against no construction wait: 2 bedroom apartments start at AED 2.55M ≈ USD 694K, 3 bedroom apartments at AED 3.95M ≈ USD 1.08M, and the 3 and 4 bedroom penthouses at AED 9.00M+ ≈ USD 2.45M+.

Rosewater at Dubai Creek Harbour Project Guide

Site Context This Cycle

Explore Rosewater Location on Dubai Map

Rosewater sits on plot 169 in Al Khairan First, on the Creek Beach side of Dubai Creek Harbour, where the developer's massing plan places its three buildings around an inner plaza with a canal along the plot edge. That compact courtyard layout is why the November 2024 report closes on shared spaces rather than structure: the pool area, gym, parking areas and lobbies are the items recorded as ready.

Around the site, the 700 metre Creek Beach is a short stroll away and the developer brochure puts Creek Marina Yacht Club at 5 minutes, Burj Khalifa at 10 minutes and Dubai International Airport at 15 minutes, with a dedicated metro marked on its connectivity map as a planned link rather than an operating station. For a buyer taking a ready Rosewater unit now, the beach, marina and Vida hotel frontage are the daily setting while the rail connection remains a future addition. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Rosewater at Dubai Creek Harbour by Emaar on Dubai Map

Buyer Resources for This Project

Investing in Rosewater After Construction Completion

At completion the questions move from progress to residency, verification and acceptance. Each resource below matches where Rosewater stands after the November 2024 reading.

Rosewater at Dubai Creek Harbour by Emaar Properties in Dubai Creek Harbour construction updates cover image featuring a project rendering of waterfront residential buildings beside the lagoon with high-rise towers in the background in Dubai - Presented by Tohid Fetrat
You Are Here

Rosewater Construction Updates

This page: the November 2024 register reading that closed Rosewater at 100% with completion certificates issued.

Rosewater at Dubai Creek Harbour by Emaar Properties in Dubai Creek Harbour Golden Visa concept with a Golden Visa card above a landscaped lagoon-style swimming pool and residential buildings in Dubai - Presented by Tohid Fetrat

Rosewater at Dubai Creek Harbour Golden Visa: Three Tiers Above the Line

Rosewater at Dubai Creek Harbour, three Emaar buildings around a shared plaza, qualifies at 2 and 3 bedrooms and the penthouses.

Read Rosewater Golden Visa Guide
Rosewater at Dubai Creek Harbour by Emaar Properties in Dubai Creek Harbour escrow account protection concept with shield and padlock icons above a landscaped pedestrian promenade, fountain, and residential buildings in Dubai - Presented by Tohid Fetrat

Rosewater at Dubai Creek Harbour: The Mashreq Escrow, Fully Certified

Rosewater at Dubai Creek Harbour is DLD project 2193, 211 units escrowed with Mashreq and 100% certified by November 2024.

Verify Rosewater Escrow Account
Rosewater at Dubai Creek Harbour by Emaar Properties in Dubai Creek Harbour snagging inspection graphic showing a furnished kitchen and dining area with balcony access in Dubai - Presented by Tohid Fetrat

Rosewater at Dubai Creek Harbour Snagging for Apartments and Penthouses

Rosewater at Dubai Creek Harbour is three Emaar mid-rise buildings around an inner plaza, holding 211 apartments and penthouses.

Book Rosewater Snagging Inspection

Update Timeline

Other Rosewater Construction Updates

November 2024 is the only monthly Rosewater report in this series; the hub carries the full register history, from registration in October 2019 to the Finished status.

All Rosewater Construction Updates

FAQs

Rosewater at Dubai Creek Harbour Construction Progress in November 2024: Frequently Asked Questions

The DLD project register recorded Rosewater, project 2193, at 100% construction progress on 07 November 2024, up 4.92 points from a previous reading of 95.08% that the register does not date. The same record lists the project status as Finished, and at the 23 September 2026 build of this page that reading was 685 days old.

On construction, yes: the Independent Progress Monitoring Report dated 07 November 2024 states that all construction at site has been completed, and handover status for Rosewater is Ready as of this update. The registered completion date in the DLD record lapsed before the completion documents were issued, so the certificate dates, not the registered date, are the figures that describe when the buildings were actually completed.

The 07 November 2024 monitoring report lists a BCC dated 21 October 2024, a DCD certificate dated 09 August 2024, and lift safety certificates as received. The report does not name the issuing authority for the BCC, so a buyer who needs the certificate itself for a mortgage valuation or a title file should obtain a copy from the developer or the conveyancing trustee rather than rely on the report summary.

The November 2024 monitoring report records the pool area, gym, parking areas and lobbies as ready, with all services rooms, main meters and sub-meters completed, fixed and connected. The developer one-pager also lists a kids pool, an expansive outdoor play area and the inner plaza, which the report does not itemise separately, so those are worth checking in person at viewing.

The report describes Rosewater as a Phase 3 residential mid-rise development of three buildings: Building 1 at G+M+10, Building 2 at G+M+11 and Building 3 at G+M+7, each with a concrete structure and block walls with internal and external finishes. As of 07 November 2024 all three were recorded as complete, and the DLD register counts 211 residential units across the cluster.

Treat it as the completion record rather than a live status: the 07 November 2024 reading was 685 days old on 23 September 2026, and any register change since then would only appear on the current DLD record for project 2193. The full inspection history, from registration in October 2019 to the Finished status, is kept on the Rosewater construction updates hub.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the November 2024 inspection record for Rosewater at Dubai Creek Harbour correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.