
Emaar Properties · Rashid Yachts & Marina · Construction Update
Seagate at Rashid Yachts & Marina Construction Update - April 2025
DLD Project Register Shows Seagate at 100% Construction Progress After the April 2025 Inspection
With building works substantially complete and the BCC issued, Seagate stood at 100% in the DLD project register on 14 April 2025, now seventeen months ago.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Seagate at Rashid Yachts & Marina Construction Snapshot
A 4.55 point rise from an undated 95.45% reading brought Seagate to 100% in the DLD project register on 14 April 2025, the end of the handover band, where the record stops measuring construction and starts documenting a finished building.
Seagate at Rashid Yachts & Marina
2163
Finished
100%
14 April 2025
01 September 2019
282 apartments
35,568.37 sq m
September 2025
Data source: DLD project register reading dated 14 April 2025, with the progress status and certificate dates taken from the Independent Progress Monitoring Report (IPMR) of the same date. The reading was 527 days old when this page was prepared on 23 September 2026, so check project 2163 against the live DLD record before relying on it. The hero image is a developer project rendering, not a site photograph, and shows no construction progress. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: September 2026.
Want to know the day the Seagate DLD record next changes? Message me on WhatsApp and I will send it to you directly: one message per record change, nothing else. Message me on WhatsApp
This Inspection Cycle
Seagate at Rashid Yachts & Marina Construction Progress Summary
Seagate's figure in the DLD project register moved from an undated 95.45% to 100% at the 14 April 2025 inspection, a closing step of 4.55 points. The IPMR of the same date supplies the context behind that number: DCD issued on 26 December 2024, the BCC issued by PCFC on 31 December 2024, and all building construction activities recorded as substantially completed across the four buildings.
- Concrete structure and blockwork across Buildings 1 to 4
- Internal and external finishes, recorded as substantially completed
- DCD issued on 26 December 2024
- BCC issued by PCFC on 31 December 2024
- DLD project register: 100% on 14 April 2025
- Previous register reading: 95.45%, undated
- IPMR progress status: Completed
- Register status: Finished
- Handover in September 2025
- Registered completion date of 30-09-2025, now passed
- Apartment acceptance and title transfer on each purchase
Payment Linked Progress
What 100% Progress Means for Seagate Buyers
Seagate launched on an 80/20 structure with the final 20% due on construction completion, so the 100% reading marked the point the original payment schedule was built around. For anyone buying or holding a Seagate apartment today, the questions have moved from progress to transfer, inspection, and records, and four actions matter most.
Verify the escrow record
Seagate's construction-period instalments were paid into the DLD regulated escrow account registered for project 2163. Before any money moves on a Seagate unit, Seagate escrow account verification confirms what the record shows; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA completion clauses
Check how your sale and purchase agreement ties the final instalment to construction completion and how it defines the handover notice, then set those clauses against the 14 April 2025 reading and the September 2025 handover. Not sure how your SPA terms line up with this record? Send me your SPA schedule and I will map it against the certified milestones.
Book an independent snagging inspection
On a finished building, an independent inspection sits between transfer and acceptance of whichever Seagate apartment you take, and defect liability runs from building completion, not from move-in. The Seagate snagging inspection guide sets out what to document before you sign.
Re-check the live register
This reading is 527 days old, and register entries can still be amended after handover. The Seagate at Rashid Yachts & Marina construction updates hub keeps the full construction record for project 2163 in one place.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 100%?
Entering a finished building trades payment-plan runway for certainty: the structure is certified, handover has already taken place, and the decision narrows to one specific apartment. Every construction-period instalment went to the DLD-registered escrow account for project 2163, released against certified construction progress.
- Certified record: 100% in the DLD register and BCC issued by PCFC
- Handover already completed in September 2025
- A finished apartment you can walk through before transfer
- Build risk carried from groundworks through to completion
- A multi-year wait before keys is the norm at launch
- Instalments spread across the build at launch-level pricing
01 unit listed available on the project page as of this update; availability can change at short notice.
About the Development
Seagate at Rashid Yachts & Marina Project Details

Recorded at 100% in the DLD project register on 14 April 2025, Seagate is a finished four-building Emaar development of 282 apartments, from 1 to 4 bedrooms, set around the Rashid Yachts & Marina canal pool. Starting prices: AED 1.75M ≈ USD 476K.
For buyers entering now, the trade off runs the other way from a launch: no construction wait and an apartment you can inspect, against launch-stage pricing that has already passed, with handover completed in September 2025.
Seagate at Rashid Yachts & Marina Project GuideSite Context This Cycle
Explore Seagate at Rashid Yachts & Marina Location on Dubai Map
Seagate occupies plot 359 in the DLD record, its four buildings set between the canal pool on one side and the marina and promenade on the other, stepping from 15 floors in Building 1 down to 5 in Building 4. Because the April 2025 reading covers the project as a whole, that split frontage is now what separates one finished apartment from another: outlook and floor, not construction stage.
Rashid Yachts & Marina is still filling in around Seagate: several Emaar neighbours in the same masterplan are scheduled for handover in 2027 and 2028, so a finished Seagate apartment is likely to sit beside active building sites for some time yet. Driving times are the settled part of the picture, with Sheikh Zayed Road about 10 minutes and Dubai International Airport about 15 minutes away. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Seagate at Rashid Yachts & Marina After Construction Completion
At 100%, the questions shift from build progress to residency, payment records, and the condition of a finished apartment. Each resource below is matched to where Seagate stands after its April 2025 reading.

Seagate at Rashid Yachts & Marina Construction Updates
This page: the 14 April 2025 register reading for Seagate at 100%, with its certificate dates.

Seagate at Rashid Yachts & Marina Golden Visa: Four Buildings, Title Deeds
Seagate at Rashid Yachts & Marina, Emaar's four-building complex, transfers on title deed; 2, 3 and 4 bedroom apartments qualify.
Check Seagate Golden Visa Eligibility
Seagate at Rashid Yachts & Marina Escrow, Certified 100% in 2025
Seagate at Rashid Yachts & Marina, DLD project 2163, read 100% certified April 2025; 302 units escrowed at Dubai Islamic Bank.
Verify the Seagate Escrow Account
Seagate at Rashid Yachts & Marina Snagging Before You Sign
Seagate at Rashid Yachts & Marina is a four-building Emaar Properties complex of 282 apartments on the promenade at Mina Rashid.
Book a Seagate Snagging InspectionUpdate Timeline
Other Seagate at Rashid Yachts & Marina Construction Updates
April 2025 is the first monthly report in this series and, at 100%, the closing reading on progress; the hub holds the full record from registration in 2019 onward.
The Wider Picture
Explore Seagate at Rashid Yachts & Marina Structure
This April 2025 report is one record inside a larger masterplan: the apartment market around Seagate, the Mina Rashid community, and the developer behind both.

Mina Rashid Properties for Sale
Browse waterfront apartments for sale at Rashid Yachts & Marina, with projects, prices and payment plans.
See Mina Rashid Properties for Sale
Mina Rashid Community Overview
Read the Rashid Yachts & Marina guide: Emaar's transformation of historic Port Rashid into a marina lifestyle community.
Explore the Mina Rashid Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileFAQs
Seagate at Rashid Yachts & Marina Construction Progress in April 2025: Frequently Asked Questions
Seagate stood at 100% construction progress in the DLD project register at the inspection dated 14 April 2025, up 4.55 points from an earlier reading of 95.45% that the register shows without a date. As of 23 September 2026, that reading is 527 days, about seventeen months, old.
The DLD record lists a registered completion date of 30-09-2025, and handover took place in September 2025, so both dates now sit in the past. With the register status Finished, the registered date works as a historical reference rather than a forecast, and the live record for project 2163 remains the authority if anything is amended. How registered dates and inspection readings relate across the build is covered on the Seagate at Rashid Yachts & Marina construction updates hub.
The Independent Progress Monitoring Report dated 14 April 2025 records DCD issued on 26 December 2024 and the building completion certificate (BCC) issued by PCFC on 31 December 2024. The same report gives the progress status as Completed and notes that all building construction activities were substantially completed.
The reading is dated 14 April 2025, which is 527 days before this page was prepared on 23 September 2026. It remains the latest progress figure shown here, and a 100% reading leaves no further progress to record, but the status and dates in the live DLD record for project 2163 should be checked before any decision relies on them.
The inspection report describes Seagate as four buildings, labelled B1 to B4, with 15, 6, 10 and 5 floors respectively, designed as a concrete structure with blockwork and internal and external finishes. The 100% figure in the DLD project register applies to the project as a whole rather than to any single building.
Under Seagate's 80/20 launch structure, the final 20% was due on construction completion, so April 2025, with the register at 100% and the BCC already issued, falls at the end of that schedule. What exactly triggered the final call, and the notice period attached to it, is defined in each buyer's SPA.
Seagate was registered on 01 May 2019 and construction started on 01 September 2019; the register reached 100% at the inspection dated 14 April 2025, about five years and seven months later. DCD was issued on 26 December 2024 and the BCC by PCFC on 31 December 2024, and handover followed in September 2025.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the April 2025 inspection record for Seagate at Rashid Yachts & Marina correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.